Drainage Improvement in Southern Lantau –
Investigation
Final Executive Summary for the EIA Report
Table of Contents
1.1 Background to the Study
1.2 Purpose and Scope of the EIA Study
2.1 Location and Nature of Project
2.2 Works Programme
3.1 Introduction
3.2 Air Quality Impact
3.3 Noise Impact
3.4 Water Quality Impact
3.5 Waste Management Implications
3.6 Ecological Impact
3.7 Cultural Heritage
3.8 Environmental Monitoring and Audit
List of Figures
Figure 1.1 Location
Plan of the Project
Figure 2.1 General Layout Plan
of Pak Ngan Heung River (1, 2)
Figure 2.2 General Layout
Plan of Luk Tei Tong Rivers (1, 2)
Figure 2.3 General
Layout Plan of Tai Tei Tong River