Agreement No. CE 87/2001
(CE)
FURTHER DEVELOPMENT OF TSEUNG KWAN O
FEASIBILITY
STUDY
Environmental Monitoring and audit manual
LIST OF
CONTENTS
1.1 Project
Description
1.2 Purpose
of the Manual
1.3 Project
Organisation
2.1 Introduction
2.2 Air
Quality Parameters
2.3 Monitoring
Equipment
2.4 Laboratory
Measurement / Analysis
2.5 Monitoring
Locations
2.6 Baseline
Monitoring
2.7 Impact
Monitoring
2.8 Event
and Action Plan
2.9
Mitigation Measures
3.1 Introduction
3.2 Noise Parameters
3.3 Monitoring
Equipment
3.4 Monitoring
Locations
3.5 Baseline
Monitoring
3.6 Impact
Monitoring
3.7 Event
and Action Plan
3.8
Mitigation Measures
4.1 Introduction
4.2 Construction
Phase Monitoring
4.3 Operational
Phase Monitoring
4.4 Monitoring
Equipment and Field Log
4.5 Laboratory
Measurement / Analysis
4.6 Event
and Action Plan
4.7 Mitigation
Measures
5.1 Introduction
5.2 Ecological
Mitigation Measures and Monitoring
6.1 Introduction
6.2 Ecological
Mitigation Measures and Monitoring
7.1 Introduction
7.2 Ecological Mitigation Measures and Monitoring
8.1 Introduction
8.2 Monitoring Details
8.3 Baseline Monitoring
8.4 Event/Action
Plan for Landscape and Visual Works
8.5 Mitigation Measures
9.1 Introduction
9.2 Mitigation Measures
10.1 Introduction
10.2 Cultural
Heritage Mitigation Measures
10.3 Construction Phase Monitoring and Audit
11.1 Landfill
Gas Parameters
11.2 Monitoring
Equipment
11.3 Monitoring
Locations
11.4 Limit
Levels and Event and Action Plan (EAP) for Landfill Gas
11.5 Mitigation
Measures
12.1 Site
Inspections
12.2 Compliance
with Legal and Contractual Requirements
12.3 Environmental
Complaints
13.1 General
13.2 Electronic
Reporting of EM&A Information
13.3 Baseline
Monitoring Report
13.4 Monthly
EM&A Reports
13.5 Quarterly
EM&A Summary Reports
13.6 Final
EM&A Review Reports
13.7 Data
Keeping
13.8 Interim
Notifications of Environmental Quality Limit Exceedances
Tables
Figures
Figure 1.2 Project Organisation
Figure 2.1a Locations of Construction Dust
Monitoring Stations (Kowloon Area)
Figure 2.1b Locations of Construction Dust
Monitoring Stations (TKO Area)
Figure 3.1a Locations of Construction Noise
Monitoring Stations (Kowloon Area)
Figure 3.1b Locations of Construction Noise
Monitoring Stations (TKO Area)
Figure 3.2a Locations of Operational Traffic
Noise Monitoring Stations (Kowloon Area)
Figure 3.2b Locations of Operational Traffic
Noise Monitoring Stations (TKO Area)
Figure 3.3 Location of Fixed Noise
Monitoring Station
Figure 4.1 Locations of Marine Water Quality
Monitoring Station
Figure 6.1 Coral Monitoring Locations
Figure 10.1 Location of Identified Anomaly
Figure 12.1 Complaint Response Procedures
APPENDICIES
Appendix A Construction Programme
Appendix B Sample Record Sheet
Appendix C Implementation Schedule of Proposed
Mitigation Measures
Appendix D Sample Template for the Interim
Notification