ENVIRONMENTAL IMPACT ASSESSMENT STUDY
FOR THE
EXPANSION OF HELIPORT FACILITIES AT
MACAU FERRY TERMINAL
ENVIRONMENTAL
MONITORING & AUDIT MANUAL
TABLE OF CONTENT
Purpose
of the Manual
Project
Description
Environmental
Monitoring and Audit Requirements
Project
Organisation
Introduction
Noise Parameters
Monitoring
Equipment
Monitoring
Locations
Impact
Monitoring for Helicopter Noise
Event
and Action Plan
Mitigation
Measures
Introduction
Site
Inspections
Compliance
Audits
Water
Quality Control and Mitigation Measures
Introduction
Mitigation
Measures
Introduction
Waste
Control and Mitigation Measures
Site
Inspection
Environmental
Complaints
General
Monthly
EM&A Reports
Quarterly
EM&A Summary Reports
Final
EM&A Report
Operational
Phase EM&A Report
Data
Keeping
Interim
Notifications of Environmental Quality Limit Exceedances
List of Tables
Table 2.1 Noise Monitoring Stations during Operation Phase
Table 2.2 Action and Limit Levels for Helicopter Noise
Table 2.3 Event / Action Plan for Helicopter Noise
List of Figures
Figure 1.1 Location of Project Works
Figure 1.2 Project Organisation
Figure 2.1 Noise Monitoring Stations During Operation Phase
List of Appendices
Appendix A Implementation Schedule
Appendix B Sample Data Sheet for Helicopter Noise Monitoring
Appendix C Interim Notifications of Environmental Quality Limits
Exceedance
Appendix D Maximum Combination of Flights Number during Future Operation
(1900 - 2300 hours)