CONTENTS

                                                                                                                                                                                     

1.                    INTRODUCTION                                                                                                                                         

 

2.                    DESCRIPTION OF DESIGNATED PROJECT                                                                                          

 

3.                    EIAO REQUIREMENTS AND APPROACH TO ASSESSMENT                                                         

 

4.                    TERRESTRIAL ECOLOGICAL ASSESSMENT                                                                                       

 

5.                    NOISE IMPACT ASSESSMENT                                                                                                               

 

6.                    Air Quality Assessment                                                                                                                  

 

7.                    WATER QUALITY ASSESSMENT                                                                                                          

 

8.                    WASTE MANAGEMENT                                                                                                                          

 

9.                    CULTURAL HERITAGE IMPACT ASSESSMENT                                                                                

 

10.                 LANDSCAPE / VISUAL IMPACT ASSESSMENT

 

11.                 MARINE ECOLOGY

 

12.                 FISHERIES

 

13.                 Hazard to Life

 

14.                 Environmental outcomes

 

15.                 ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS                                                

 

16.                 CONCLUSIONS AND RECOMMENDATIONS                                                                                      

 

                                                                                                                                          

 

APPENDICES

 

Appendix A                 Subtidal Survey Field Report

Appendix B                 Terrestrial and Intertidal Baseline Survey Report

Appendix C                 Construction Noise Assessment

Appendix D                 Structural Borne Noise Assessment

Appendix E                  Field Records of Building Heritage Survey

Appendix F                  Construction and Demolition Material Management Plan (C&DMMP)

Appendix G                 Estimation on Pollutants and Sediment Loads

Appendix H                 Water Quality Modelling Methodology

Appendix I                   Water Quality Modelling Result

Appendix J                  Implementation Schedule

 

 

 

FIGURES

 

2.1           Outline Layout Plan for Intake Shaft Locations

2.1a         Layout Plan for Intake Shaft Locations (Sheet 3 of 3)

2.1b         Layout Plan for Intake Shaft Locations (Sheet 2 of 3)

2.1c         Layout Plan for Intake Shaft Locations (Sheet 1 of 3)

2.2           Horizontal and Vertical Alignment of the Hong Kong West Drainage Tunnel

2.3-1        Land Requirement Plan – Shaft B2 (P) (Sheet 1 of 35)

2.3-2        Land Requirement Plan – Shaft BR3 (Sheet 2 of 35)

2.3-3        Land Requirement Plan – Shaft BR4 (P) (Sheet 3 of 35)

2.3-4        Land Requirement Plan – Shaft BR5 (P) (Sheet 4 of 35)

2.3-5        Land Requirement Plan – Shaft BR6 (P) (Sheet 5 of 35)

2.3-6        Land Requirement Plan – Shaft BR7 (P) (Sheet 6 of 35)

2.3-7        Land Requirement Plan – Shaft DG1 (P) (Sheet 7 of 35)

2.3-8        Land Requirement Plan – Eastern Portal (Sheet 8 of 35)

2.3-9        Land Requirement Plan – Shaft E5 (A) (P) & E5 (B) (P) (Sheet 9 of 35)

2.3-10      Land Requirement Plan – Shaft E7 (P) (Sheet 10 of 35)

2.3-11      Land Requirement Plan – Shaft GL1 (P) (Sheet 11 of 35)

2.3-12      Land Requirement Plan – Shaft HKU1 (P) (Sheet 12 of 35)

2.3-13      Land Requirement Plan – Shaft HR1(P) (Sheet 13 of 35)

2.3-14      Land Requirement Plan – Shaft M3(P) (Sheet 14 of 35)

2.3-15      Land Requirement Plan – Shaft MA13 (P) & MA14 (P) (Sheet 15 of 35)

2.3-16      Land Requirement Plan – Shaft MA15 (P) (Sheet 16 of 35)

2.3-17      Land Requirement Plan – Shaft MA17 (P) (Sheet 17 of 35)

2.3-18      Land Requirement Plan – Shaft MB16 (P) (Sheet 18 of 35)

2.3-19      Land Requirement Plan – Shaft MBD2 (P) (Sheet 19 of 35)

2.3-20      Land Requirement Plan – Shaft P5 (P) (Sheet 20 of 35)

2.3-21      Land Requirement Plan – Shaft PFLR1 (P) (Sheet 21 of 35)

2.3-22      Land Requirement Plan – Shaft RR1 (P) (Sheet 22 of 35)

2.3-23      Land Requirement Plan – Shaft THR2 (P) (Sheet 23 of 35)

2.3-24      Land Requirement Plan – Shaft TP4 (P) (Sheet 24 of 35)

2.3-25      Land Requirement Plan – Shaft TP5 (P) (Sheet 25 of 35)

2.3-26      Land Requirement Plan – Shaft TP789 (P) (Sheet 26 of 35)

2.3-27      Land Requirement Plan – Shaft W0 (P) (Sheet 27 of 35)

2.3-28      Land Requirement Plan – Shaft W1 (P) (Sheet 28 of 35)

2.3-29      Land Requirement Plan – Shaft W3 (P) (Sheet 29 of 35)

2.3-30      Land Requirement Plan – Shaft W5 (P) (Sheet 30 of 35)

2.3-31      Land Requirement Plan – Shaft W8 (Sheet 31 of 35)

2.3-32      Land Requirement Plan – Shaft W10 (Sheet 32 of 35)

2.3-33      Land Requirement Plan – Shaft W11 (Sheet 33 of 35)

2.3-34      Land Requirement Plan – Shaft W12 (P) (Sheet 34 of 35)

2.3-35      Land Requirement Plan – Western Portal (Sheet 35 of 35)

2.4           Proposed Drainage Tunnel Alignment with Country Park Boundary

2.4A        Proposed Drainage Tunnel Alignment with Country Park Boundary (Sheet 1 of 2)

2.4B         Proposed Drainage Tunnel Alignment with Country Park Boundary(Sheet 2 of 2)

2.5           Key Plan of Tunnel Alignment Options (Scheme 1)

2.6           Layout of Tunnel Alignment Scheme 1 – Option 1 (Preferred Option A(1))

2.7           Layout of Tunnel Alignment Scheme 1 – Option 3 (Preferred Option A(2))

2.8           Layout of Tunnel Alignment Scheme 1 – Option 9 (Preferred Option B(1))

2.9           Layout of Tunnel Alignment Scheme 1 – Option 11 (Preferred Option B(2))

2.10         Layout of Tunnel Alignment Scheme 1 – Option 21 (Preferred Option C(1))

2.11         Layout of Tunnel Alignment Scheme 1 – Option 23 (Preferred Option C(2))

2.12         Layout of Tunnel Alignment Scheme 1 – Option 29 (Preferred Option C(3))

2.13         Photo taken at the proposed intakes and both portals

2.14         Eastern Portal Layout

2.15         Proposed Works and Temporary Works Area Western Outlet Portal

2.16         Layout of Temporary Cofferdam

2.17         Typical Intake Structure Layout and Sections

2.18         Perspective View of By-pass Falility on Intake Structures

2.19         Western Portal Layout

2.20         Western Portal Section

4.1a         Overlay of Habitats with Permanent and Temporary Works Area at the Intake Points

4.1b         Overlay of Habitats with Permanent and Temporary Works Area at the Intake Points

4.1c         Overlay of Habitats with Permanent and Temporary Works Area at the Intake Points

4.2           Eastern Portal Layout

4.3           Cross Section – Across Basin   

5.1           Locations of Sensitive Receivers around Eastern Portal

5.2           Locations of Sensitive Receivers around Western Portal

5.3           Locations of Sensitive Receivers around Intake B2(P)

5.4           Locations of Sensitive Receivers around Intake BR3(P)

5.5           Locations of Sensitive Receivers around Intake BR4(P)

5.6           Locations of Sensitive Receivers around Intake BR5(P)

5.7           Locations of Sensitive Receivers around Intake BR6(P)&BR7(P)

5.8           Locations of Sensitive Receivers around Intake DG1(P)

5.9           Locations of Sensitive Receivers around Intake E5(A)(P)&E5(B)(P)

5.10         Locations of Sensitive Receivers around Intake E7(P)

5.11         Locations of Sensitive Receivers around Intake GL1(P)

5.12         Locations of Sensitive Receivers around Intake HKU1(P)

5.13         Locations of Sensitive Receivers around Intake HR1

5.14         Locations of Sensitive Receivers around Intake M3(P)

5.15         Locations of Sensitive Receivers around Intake M13(P), M14(P), M15(P)

5.16         Locations of Sensitive Receivers around Intake MA17(P)

5.17         Locations of Sensitive Receivers around Intake MB16

5.18         Locations of Sensitive Receivers around Intake MBD2

5.19         Locations of Sensitive Receivers around Intake P5(P)

5.20         Locations of Sensitive Receivers around Intake PFLR1(P)

5.21         Locations of Sensitive Receivers around Intake RR1(P)

5.22         Locations of Sensitive Receivers around Intake THR2 (P)

5.23         Locations of Sensitive Receivers around Intake TP4(P)&TP5(P)

5.24         Locations of Sensitive Receivers around Intake TP789(P)

5.25         Locations of Sensitive Receivers around Intake W0(P)

5.26         Locations of Sensitive Receivers around Intake W1

5.27         Locations of Sensitive Receivers around Intake W3(P)

5.28         Locations of Sensitive Receivers around Intake W5(P)

5.29         Locations of Sensitive Receivers around Intake W8

5.30         Locations of Sensitive Receivers around Intake W10

5.31         Locations of Sensitive Receivers around Intake W11(P)

5.32         Locations of Sensitive Receivers around Intake W12(P)

5.33         Proposed Full Enclosure Noise Barrier at Eastern Portal

5.34         Proposed Full Enclosure Noise Barrier at Western Portal

5.35         Influence Zone of Structural Borne Noise at main Tunnel Near Shaft Thur2(P) and E7(P)

5.36         Influence Zone of Structural Borne Noise at main Tunnel Near Shaft W1 and BR7

5.37         Influence Zone of Structural Borne Noise at main Tunnel Near Shaft BR7(P), BR6(P) and BR5(P)

5.38         Influence Zone of Structural Borne Noise at main Tunnel Near Shaft HR1

5.39         Influence Zone of Structural Borne Noise at main Tunnel Near Shaft W0

5.40         Influence Zone of Structural Borne Noise at main Tunnel Near Shaft W3

5.41         Influence Zone of Structural Borne Noise at main Tunnel Near Shaft W5

6.1a         Locations of weather stations as at 31 December 2002

6.1b         Annual Wind Roses for Automatic Weather Stations in 2002

6.1c         Annual Wind Roses for Automatic Weather Stations in 2002

6.1d         Annual Wind Roses for Automatic Weather Stations in 2002

7.1           Catchment area for the proposed drainage channel (Part 1 of 2)

7.1           Catchment area for the proposed drainage channel (Part 2 of 2)

7.2           Water Quality Sensitive Receivers

7.3           Proposed Works and Temporary Works Area Western Outlet Portal

7.4           Layout of Temporary Cofferdam

7.5a         Layout of Stilling Basin & Armor Rock

7.5b         Sections and Details of Temporary Cofferdam and Slit Curtain

7.7           Typical Intake Structure Layout and Sections

7.8           Perspective view of By-pass Falility on Intake Structures

7.9           A typical plan and long-section of the intake sites showing the collection area

9.1           Plan showing the location of Haw Par Mansion and wall and gate of the Former Haw Par Mansion Gardens in relation to nearby works (Temporary Works Area of E4 and Eastern Portal Location)

9.2           View of Haw Par Mansions from the works area to the east

9.3           View of the terrace wall of the former Haw Par Mansion Gardens from the works area to the east

9.4           View of the gateway to the former Haw Par Mansion Gardens from the east

9.5           Plan showing the location of the Former Explosives Magazine and its relationship to nearby works (Temporary Works Area of W3)

9.6           View of the northern block of the Former Explosives Magazine taken from the northwest

9.7           View of the sidewall of the central block of the Former Explosives Magazine taken from the west

9.8           View of the southern block of the Former Explosives Magazine taken from the west

9.9           Plan showing the location of Hop Yat Church and its relationship to nearby works (Temporary Works Area of W8)

9.10         View of the side of Hop Yat Church taken from the north

9.11         View of the façade of Hop Yat Church taken from the east

9.12         Plan showing the location of the Cathedral of the Immaculate Conception in relation to nearby works (Temporary Works Area of W5)

9.13         View of the façade of the Cathedral of the Immaculate Conception taken from the east

9.14         View of the area between Haw Par Mansion and the works area showing the difference in elevation and intervening channeled stream and terrace wall. Taken from the works area to the east.

9.15         View of the wall of the former Haw Par Mansion Gardens taken from the works area and showing the proposed works area.

9.16         View of the stream bed area to the west of the Former Explosives Magazine where works will take place

9.17         View of the Cathedral of the Immaculate Conception from the east; taken from the proposed works area and showing the intervening development.

9.18         DSD Standard Site Hoarding

Landscape Resources (Country Parks and Special Areas) (382403/LR/001)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft B2(P) (Sheet 1 of 35) (Drawing no. 382403/V/003)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft BR3 (Sheet 2 of 35) (Drawing no. 382403/V/004)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft BR4(P) (Sheet 3 of 35) (Drawing no. 382403/V/005)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft BR5(P) (Sheet 4 of 35) (Drawing no. 382403/V/006)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft BR6(P) (Sheet 5 of 35) (Drawing no. 382403/V/007)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft BR7(P) (Sheet 6 of 35) (Drawing no. 382403/V/008)

Zone of Visual Influence (ZVI and Visual Sensitive Receivers (VSRs) Plan Shaft DG1(P) (Sheet 7 of 35) (Drawing no. 382403/V/009)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Eastern Portal (Sheet 8 of 35) (Drawing no. 382403/V/010)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft E5(A)(P) and E5(B)(P) (Sheet 9 of 35) (Drawing no. 382403/V/011)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft E7(P) (Sheet 10 of 35) (Drawing no. 382403/V/012)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft GL1(P) (Sheet 11 of 35) (Drawing no. 382403/V/013)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft HKU1(P) (Sheet 12 of 35) (Drawing no. 382403/V/014)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft HR1 (Sheet 13 of 35) (Drawing no. 382403/V/015)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft M3(P) (Sheet 14 of 35) (Drawing no. 382403/V/016)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft MA13(P) & MA14(P) (Sheet 15 of 35)

(Drawing no. 382403/V/017)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft MA15(P) (Sheet 16 of 35) (Drawing no. 382403/V/018)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft MA17(P) (Sheet 17 of 35) (Drawing no. 382403/V/019)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft MB16(P) (Sheet 18 of 35) (Drawing no. 382403/V/020)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft MBD2 (Sheet 19 of 35) (Drawing no. 382403/V/021)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft P5(P) (Sheet 20 of 35) (Drawing no. 382403/V/022)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft PFLR1(P) (Sheet 21 of 35) (Drawing no. 382403/V/023)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft RR1(P) (Sheet 22 of 35) (Drawing no. 382403/V/024)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft THR2(P) (Sheet 23 of 35) (Drawing no. 382403/V/025)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft TP4(P) (Sheet 24 of 35) (Drawing no. 382403/V/026)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft TP5(P) (Sheet 25 of 35) (Drawing no. 382403/V/027)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft TP789(P) (Sheet 26 of 35) (Drawing no. 382403/V/028)

Zone of Visual Influence (ZVI and Visual Sensitive Receivers (VSRs) Plan Shaft W0(P) (Sheet 27 of 35) (Drawing no. 382403/V/029)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft W1(P) (Sheet 28 of 35) (Drawing no. 382403/V/030)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft W3(P) (Sheet 29 of 35) (Drawing no. 382403/V/031)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft W5(P) (Sheet 30 of 35) (Drawing no. 382403/V/032)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft W8 (Sheet 31 of 35) (Drawing no. 382403/V/033)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft W10 (Sheet 32 of 35) (Drawing no. 382403/V/034)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft W11 (Sheet 33 of 35) (Drawing no. 382403/V/035)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Shaft W12(P) (Sheet 34 of 35) (Drawing no. 382403/V/036)

Zone of Visual Influence (ZVI) and Visual Sensitive Receivers (VSRs) Plan Western Portal (Sheet 35 of 35) (Drawing no. 382403/V/037)

Location of Project on Hong Kong Island (Drawing no. 382403/S/L/001)

Legend for Landscape and Visual Mitigation Measures (Drawing no. 382403/S/L/002)

Landscape Design Proposal Shaft B2(P) (Drawing no. 382403/S/L/003)

Landscape Design Proposal Shaft BR3 (Drawing no. 382403/S/L/004)

Landscape Design Proposal Shaft BR4(P) (Drawing no. 382403/S/L/005)

Landscape Design Proposal Shaft BR5(P) (Drawing no. 382403/S/L/006)

Landscape Design Proposal Shaft BR6(P) (Drawing no. 382403/S/L/007)

Landscape Design Proposal Shaft BR7(P) (Drawing no. 382403/S/L/008)

Landscape Design Proposal Shaft DG1 (Drawing no. 382403/S/L/009)

Landscape Design Proposal Eastern Portal (Drawing no. 382403/S/L/010)

Landscape Design Proposal Shaft E5(A)(P) (Drawing no. 382403/S/L/011-1)

Landscape Design Proposal Shaft E5(B)(P) (Drawing no. 382403/S/L/011-2)

Landscape Design Proposal Shaft E7 (P) (Drawing no. 382403/S/L/012)

Tree Impact Assessment Shaft B2(P) (Drawing no. 382403/S/TI/003)

Tree Impact Assessment Shaft B3 (Drawing no. 382403/S/TI/004)

Tree Impact Assessment Shaft B4(P) (Drawing no. 382403/S/TI/005)

Tree Impact Assessment Shaft BR5(P) (Drawing no. 382403/S/TI/006)

Tree Impact Assessment Shaft B6(P) (Drawing no. 382403/S/TI/007)

Tree Impact Assessment Shaft B7(P) (Drawing no. 382403/S/TI/008)

Tree Impact Assessment Shaft DG1 (Drawing no. 382403/S/TI/009)

Tree Impact Assessment Eastern Portal (Drawing no. 382403/S/TI/010)

Tree Impact Assessment Shaft E5(A)(P) (Drawing no. 382403/S/TI/011-1)

Tree Impact Assessment Shaft E5(B)(P) (Drawing no. 382403/S/TI/011-2)

Tree Impact Assessment Shaft E7(P) (Drawing no. 382403/S/TI/012)

Tree Impact Assessment Shaft GL1 (Drawing no. 382403/S/TI/013)

Tree Impact Assessment Shaft HKU1(P) (Drawing no. 382403/S/TI/014)

Tree Impact Assessment Shaft HR1 (Drawing no. 382403/S/TI/015)

Tree Impact Assessment Shaft M3(P) (Drawing no. 382403/S/TI/016)

Tree Impact Assessment Shaft MA13(P) & MA14(P) (Drawing no. 382403/S/TI/017)

Tree Impact Assessment Shaft MA15(P) (Drawing no. 382403/S/TI/018)

Tree Impact Assessment Shaft MA17(P) (Drawing no. 382403/S/TI/019)

Tree Impact Assessment Shaft MB16(P) (Drawing no. 382403/S/TI/020)

Tree Impact Assessment Shaft MBD2 (Drawing no. 382403/S/TI/021)

Tree Impact Assessment Shaft P5(P) (Drawing no. 382403/S/TI/022)

Tree Impact Assessment Shaft PFLR1(P) (Drawing no. 382403/S/TI/023)

Tree Impact Assessment Shaft RR1(P) (Drawing no. 382403/S/TI/024)

Tree Impact Assessment Shaft THR2(P) (Drawing no. 382403/S/TI/025)

Tree Impact Assessment Shaft TP4(P) (Drawing no. 382403/S/TI/026)

Tree Impact Assessment Shaft TP5(P) (Drawing no. 382403/S/TI/027)

Tree Impact Assessment Shaft TP789(P) (Drawing no. 382403/S/TI/028)

Tree Impact Assessment Shaft W0(P) (Drawing no. 382403/S/TI/029)

Tree Impact Assessment Shaft W1(P) (Drawing no. 382403/S/TI/030)

Tree Impact Assessment Shaft W3(P) (Drawing no. 382403/S/TI/031)

Tree Impact Assessment Shaft W5(P) (Drawing no. 382403/S/TI/032)

Tree Impact Assessment Shaft W10 (Drawing no. 382403/S/TI/034)

Tree Impact Assessment Shaft W11 (Drawing no. 382403/S/TI/035)

Tree Impact Assessment Shaft W12(P) (Drawing no. 382403/S/TI/036)

Landscape Design Proposal Shaft GL1(P) (Drawing no. 382403/S/L/013)

Landscape Design Proposal Shaft HKU1(P) (Drawing no. 382403/S/L/014)

Landscape Design Proposal Shaft HR1 (Drawing no. 382403/S/L/015)

Landscape Design Proposal Shaft M3(P) (Drawing no. 382403/S/L/016)

Landscape Design Proposal Shaft MA13(P) & MA14(P) (Drawing no. 382403/S/L/017)

Landscape Design Proposal Shaft MA15(P) (Drawing no. 382403/S/L/018)

Landscape Design Proposal Shaft MA17(P) (Drawing no. 382403/S/L/019)

Landscape Design Proposal Shaft MB16(P) (Drawing no. 382403/S/L/020)

Landscape Design Proposal Shaft MBD2 (Drawing no. 382403/S/L/021)

Landscape Design Proposal Shaft P5(P) (Drawing no. 382403/S/L/022)

Landscape Design Proposal Shaft PFLR1(P) (Drawing no. 382403/S/L/023)

Landscape Design Proposal Shaft RR1(P) (Drawing no. 382403/S/L/024)

Landscape Design Proposal Shaft THR2(P) (Drawing no. 382403/S/L/025)

Landscape Design Proposal Shaft TP4(P) (Drawing no. 382403/S/L/026)

Landscape Design Proposal Shaft TP5(P) (Drawing no. 382403/S/L/027)

Landscape Design Proposal Shaft TP789(P) (Drawing no. 382403/S/L/028)

Landscape Design Proposal Shaft W0(P) (Drawing no. 382403/S/L/029)

Landscape Design Proposal Shaft W1(P) (Drawing no. 382403/S/L/030)

Landscape Design Proposal Shaft W3(P) (Drawing no. 382403/S/L/031)

Landscape Design Proposal Shaft W5 (P) (Drawing no. 382403/S/L/032)

Landscape Design Proposal Shaft W8 (Drawing no. 382403/S/L/033)

Landscape Design Proposal Shaft W10 (Drawing no. 382403/S/L/034)

Landscape Design Proposal Shaft W11 (Drawing no. 382403/S/L/035)

Landscape Design Proposal Shaft W12(P) (Drawing no. 382403/S/L/036)

Landscape Design Proposal Western Portal (Drawing no. 382403/S/L/037)

Hong Kong West Drainage Tunnel Proposed Western Portal Architectural Design Proposal (Drawing no. 382403/S/L/101)

Hong Kong West Drainage Tunnel Proposed Western Portal Architectural Design Proposals (Drawing no. 382403/S/L/102)

Typical Architectural Design Proposal for Intake (Drawing no. 382403/S/L/103)

Eastern Portal Architectural Design Proposals (Drawing no. 382403S/L/104)

Eastern Portal Architectural Design Proposals (Drawing no. 382403S/L/105)

Photomontage View A: Key View Point to Proposed Eastern Tunnel Portal (382403/PM/001)

Photomontage View B: Key View Point to Proposed Western Tunnel Portal (382403/PM/002)

Photomontage View C: Key View Point to Proposed Western Tunnel Portal (382403/PM/003)

Photomontage View D: Key View Point to Proposed Western Tunnel Portal (382403/PM/004)

Existing Key Photo Viewpoints (Sheet 1 of 6) (Drawing no. 382403/P/001)

Existing Key Photo Viewpoints (Sheet 2 of 6) (Drawing no. 382403/P/002)

Existing Key Photo Viewpoints (Sheet 3 of 6) (Drawing no. 382403/P/003)

Existing Key Photo Viewpoints (Sheet 4 of 6) (Drawing no. 382403/P/004)

Existing Key Photo Viewpoints (Sheet 5 of 6) (Drawing no. 382403/P/005)

Existing Key Photo Viewpoints (Sheet 6 of 6) (Drawing no. 382403/P/006)

11.1         Marine Ecology Study Area

11.2         Recognised Sites of Marine Conservation Importance

11.3         Distribution of Chinese White Dolphin in the Study Area

11.4         Distribution of Finless Porpoise in the Study Area

11.5         The locations of the five dive sites with Western Buffer WCZ surveyed by Binnie in 1995

12.1         Fisheries Study Area

12.2         Site of Fisheries Importance

12.3         Fishing Areas within South of Hong Kong Sector

12.4              Fishing grids with Assessment Area

16.1         Drainage Master Plan