CONTENTS
1.
INTRODUCTION
2.
DESCRIPTION OF DESIGNATED PROJECT
3.
EIAO REQUIREMENTS AND APPROACH TO
ASSESSMENT
4.
TERRESTRIAL ECOLOGICAL ASSESSMENT
9.
CULTURAL HERITAGE
IMPACT ASSESSMENT
10.
LANDSCAPE / VISUAL
IMPACT ASSESSMENT
11.
MARINE ECOLOGY
12.
FISHERIES
13.
Hazard to Life
15.
ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
16.
CONCLUSIONS AND
RECOMMENDATIONS
Appendix A Subtidal
Survey Field Report
Appendix B Terrestrial
and Intertidal Baseline Survey Report
Appendix C Construction
Noise Assessment
Appendix D Structural
Borne Noise Assessment
Appendix E Field
Records of Building Heritage Survey
Appendix F Construction
and Demolition Material Management Plan (C&DMMP)
Appendix G Estimation
on Pollutants and Sediment Loads
Appendix H Water
Quality Modelling Methodology
Appendix I Water
Quality Modelling Result
Appendix J Implementation
Schedule
2.1 Outline
Layout Plan for Intake Shaft Locations
2.1a Layout
Plan for Intake Shaft Locations (Sheet 3 of 3)
2.1b Layout
Plan for Intake Shaft Locations (Sheet 2 of 3)
2.1c Layout
Plan for Intake Shaft Locations (Sheet 1 of 3)
2.2 Horizontal
and Vertical Alignment of the Hong Kong West Drainage Tunnel
2.3-1 Land
Requirement Plan – Shaft B2 (P) (Sheet 1 of 35)
2.3-2 Land
Requirement Plan – Shaft BR3 (Sheet 2 of 35)
2.3-3 Land
Requirement Plan – Shaft BR4 (P) (Sheet 3 of 35)
2.3-4 Land
Requirement Plan – Shaft BR5 (P) (Sheet 4 of 35)
2.3-5 Land
Requirement Plan – Shaft BR6 (P) (Sheet 5 of 35)
2.3-6 Land
Requirement Plan – Shaft BR7 (P) (Sheet 6 of 35)
2.3-7 Land
Requirement Plan – Shaft DG1 (P) (Sheet 7 of 35)
2.3-8 Land
Requirement Plan – Eastern Portal (Sheet 8 of 35)
2.3-9 Land
Requirement Plan – Shaft E5 (A) (P) & E5 (B) (P) (Sheet 9 of 35)
2.3-10 Land Requirement Plan –
Shaft E7 (P) (Sheet 10 of 35)
2.3-11 Land Requirement Plan –
Shaft GL1 (P) (Sheet 11 of 35)
2.3-12 Land Requirement Plan –
Shaft HKU1 (P) (Sheet 12 of 35)
2.3-13 Land Requirement Plan –
Shaft HR1(P) (Sheet 13 of 35)
2.3-14 Land Requirement Plan –
Shaft M3(P) (Sheet 14 of 35)
2.3-15 Land Requirement Plan –
Shaft MA13 (P) & MA14 (P) (Sheet 15 of 35)
2.3-16 Land Requirement Plan –
Shaft MA15 (P) (Sheet 16 of 35)
2.3-17 Land Requirement Plan –
Shaft MA17 (P) (Sheet 17 of 35)
2.3-18 Land Requirement Plan –
Shaft MB16 (P) (Sheet 18 of 35)
2.3-19 Land Requirement Plan –
Shaft MBD2 (P) (Sheet 19 of 35)
2.3-20 Land Requirement Plan –
Shaft P5 (P) (Sheet 20 of 35)
2.3-21 Land Requirement Plan –
Shaft PFLR1 (P) (Sheet 21 of 35)
2.3-22 Land Requirement Plan –
Shaft RR1 (P) (Sheet 22 of 35)
2.3-23 Land Requirement Plan –
Shaft THR2 (P) (Sheet 23 of 35)
2.3-24 Land Requirement Plan –
Shaft TP4 (P) (Sheet 24 of 35)
2.3-25 Land Requirement Plan –
Shaft TP5 (P) (Sheet 25 of 35)
2.3-26 Land Requirement Plan –
Shaft TP789 (P) (Sheet 26 of 35)
2.3-27 Land Requirement Plan –
Shaft W0 (P) (Sheet 27 of 35)
2.3-28 Land Requirement Plan –
Shaft W1 (P) (Sheet 28 of 35)
2.3-29 Land Requirement Plan –
Shaft W3 (P) (Sheet 29 of 35)
2.3-30 Land Requirement Plan –
Shaft W5 (P) (Sheet 30 of 35)
2.3-31 Land Requirement Plan – Shaft W8 (Sheet 31
of 35)
2.3-32 Land Requirement Plan –
Shaft W10 (Sheet 32 of 35)
2.3-33 Land Requirement Plan –
Shaft W11 (Sheet 33 of 35)
2.3-34 Land Requirement Plan –
Shaft W12 (P) (Sheet 34 of 35)
2.3-35 Land Requirement Plan –
Western Portal (Sheet 35 of 35)
2.4 Proposed
Drainage Tunnel Alignment with Country Park Boundary
2.4A Proposed
Drainage Tunnel Alignment with Country Park Boundary (Sheet 1 of 2)
2.4B Proposed
Drainage Tunnel Alignment with Country Park Boundary(Sheet 2 of 2)
2.5 Key
Plan of Tunnel Alignment Options (Scheme 1)
2.6 Layout
of Tunnel Alignment Scheme 1 – Option 1 (Preferred Option A(1))
2.7 Layout
of Tunnel Alignment Scheme 1 – Option 3 (Preferred Option A(2))
2.8 Layout
of Tunnel Alignment Scheme 1 – Option 9 (Preferred Option B(1))
2.9 Layout
of Tunnel Alignment Scheme 1 – Option 11 (Preferred Option B(2))
2.10 Layout
of Tunnel Alignment Scheme 1 – Option 21 (Preferred Option C(1))
2.11 Layout
of Tunnel Alignment Scheme 1 – Option 23 (Preferred Option C(2))
2.12 Layout
of Tunnel Alignment Scheme 1 – Option 29 (Preferred Option C(3))
2.13 Photo
taken at the proposed intakes and both portals
2.15 Proposed
Works and Temporary Works Area Western Outlet Portal
2.16 Layout
of Temporary Cofferdam
2.17 Typical
Intake Structure Layout and Sections
2.18 Perspective
View of By-pass Falility on Intake Structures
4.1a Overlay
of Habitats with Permanent and Temporary Works Area at the Intake Points
4.1b Overlay
of Habitats with Permanent and Temporary Works Area at the Intake Points
4.1c Overlay
of Habitats with Permanent and Temporary Works Area at the Intake Points
4.3 Cross
Section – Across Basin
5.1 Locations
of Sensitive Receivers around Eastern Portal
5.2 Locations
of Sensitive Receivers around Western Portal
5.3 Locations
of Sensitive Receivers around Intake B2(P)
5.4 Locations
of Sensitive Receivers around Intake BR3(P)
5.5 Locations
of Sensitive Receivers around Intake BR4(P)
5.6 Locations
of Sensitive Receivers around Intake BR5(P)
5.7 Locations
of Sensitive Receivers around Intake BR6(P)&BR7(P)
5.8 Locations
of Sensitive Receivers around Intake DG1(P)
5.9 Locations
of Sensitive Receivers around Intake E5(A)(P)&E5(B)(P)
5.10 Locations
of Sensitive Receivers around Intake E7(P)
5.11 Locations
of Sensitive Receivers around Intake GL1(P)
5.12 Locations
of Sensitive Receivers around Intake HKU1(P)
5.13 Locations
of Sensitive Receivers around Intake HR1
5.14 Locations
of Sensitive Receivers around Intake M3(P)
5.15 Locations
of Sensitive Receivers around Intake M13(P), M14(P), M15(P)
5.16 Locations
of Sensitive Receivers around Intake MA17(P)
5.17 Locations
of Sensitive Receivers around Intake MB16
5.18 Locations
of Sensitive Receivers around Intake MBD2
5.19 Locations
of Sensitive Receivers around Intake P5(P)
5.20 Locations
of Sensitive Receivers around Intake PFLR1(P)
5.21 Locations
of Sensitive Receivers around Intake RR1(P)
5.22 Locations
of Sensitive Receivers around Intake THR2 (P)
5.23 Locations
of Sensitive Receivers around Intake TP4(P)&TP5(P)
5.24 Locations
of Sensitive Receivers around Intake TP789(P)
5.25 Locations
of Sensitive Receivers around Intake W0(P)
5.26 Locations
of Sensitive Receivers around Intake W1
5.27 Locations
of Sensitive Receivers around Intake W3(P)
5.28 Locations
of Sensitive Receivers around Intake W5(P)
5.29 Locations
of Sensitive Receivers around Intake W8
5.30 Locations
of Sensitive Receivers around Intake W10
5.31 Locations
of Sensitive Receivers around Intake W11(P)
5.32 Locations
of Sensitive Receivers around Intake W12(P)
5.33 Proposed
Full Enclosure Noise Barrier at Eastern Portal
5.34 Proposed
Full Enclosure Noise Barrier at Western Portal
5.35 Influence
Zone of Structural Borne Noise at main Tunnel Near Shaft Thur2(P) and E7(P)
5.36 Influence
Zone of Structural Borne Noise at main Tunnel Near Shaft W1 and BR7
5.37 Influence
Zone of Structural Borne Noise at main Tunnel Near Shaft BR7(P), BR6(P) and
BR5(P)
5.38 Influence
Zone of Structural Borne Noise at main Tunnel Near Shaft HR1
5.39 Influence
Zone of Structural Borne Noise at main Tunnel Near Shaft W0
5.40 Influence
Zone of Structural Borne Noise at main Tunnel Near Shaft W3
5.41 Influence
Zone of Structural Borne Noise at main Tunnel Near Shaft W5
6.1a Locations
of weather stations as at 31 December 2002
6.1b Annual
Wind Roses for Automatic Weather Stations in 2002
6.1c Annual
Wind Roses for Automatic Weather Stations in 2002
6.1d Annual
Wind Roses for Automatic Weather Stations in 2002
7.1 Catchment
area for the proposed drainage channel (Part 1 of 2)
7.1 Catchment
area for the proposed drainage channel (Part 2 of 2)
7.2 Water
Quality Sensitive Receivers
7.3 Proposed
Works and Temporary Works Area Western Outlet Portal
7.4 Layout
of Temporary Cofferdam
7.5a Layout
of Stilling Basin & Armor Rock
7.5b Sections
and Details of Temporary Cofferdam and Slit Curtain
7.7 Typical
Intake Structure Layout and Sections
7.8 Perspective
view of By-pass Falility on Intake Structures
7.9 A
typical plan and long-section of the intake sites showing the collection area
9.2 View
of Haw Par Mansions from the works area to the east
9.3 View
of the terrace wall of the former Haw Par Mansion Gardens from the works area
to the east
9.4 View
of the gateway to the former Haw Par Mansion Gardens from the east
9.6 View
of the northern block of the Former Explosives Magazine taken from the northwest
9.7 View
of the sidewall of the central block of the Former Explosives Magazine taken
from the west
9.8 View
of the southern block of the Former Explosives Magazine taken from the west
9.10 View
of the side of Hop Yat Church taken from the north
9.11 View
of the façade of Hop Yat Church taken from the east
9.13 View
of the façade of the Cathedral of the Immaculate Conception taken from the east
9.18 DSD
Standard Site Hoarding
Landscape Resources (Country
Parks and Special Areas) (382403/LR/001)
Location of Project on
Hong Kong Island (Drawing no. 382403/S/L/001)
Legend for Landscape and
Visual Mitigation Measures (Drawing no. 382403/S/L/002)
Landscape Design Proposal
Shaft B2(P) (Drawing no. 382403/S/L/003)
Landscape Design Proposal
Shaft BR3 (Drawing no. 382403/S/L/004)
Landscape Design Proposal
Shaft BR4(P) (Drawing no. 382403/S/L/005)
Landscape Design Proposal
Shaft BR5(P) (Drawing no. 382403/S/L/006)
Landscape Design Proposal
Shaft BR6(P) (Drawing no. 382403/S/L/007)
Landscape Design Proposal Shaft
BR7(P) (Drawing no. 382403/S/L/008)
Landscape Design Proposal
Shaft DG1 (Drawing no. 382403/S/L/009)
Landscape Design Proposal
Eastern Portal (Drawing no. 382403/S/L/010)
Landscape Design Proposal
Shaft E5(A)(P) (Drawing no. 382403/S/L/011-1)
Landscape Design Proposal
Shaft E5(B)(P) (Drawing no. 382403/S/L/011-2)
Landscape Design Proposal
Shaft E7 (P) (Drawing no. 382403/S/L/012)
Tree Impact Assessment
Shaft B2(P) (Drawing no. 382403/S/TI/003)
Tree Impact Assessment
Shaft B3 (Drawing no. 382403/S/TI/004)
Tree Impact Assessment
Shaft B4(P) (Drawing no. 382403/S/TI/005)
Tree Impact Assessment
Shaft BR5(P) (Drawing no. 382403/S/TI/006)
Tree Impact Assessment
Shaft B6(P) (Drawing no. 382403/S/TI/007)
Tree Impact Assessment
Shaft B7(P) (Drawing no. 382403/S/TI/008)
Tree Impact Assessment
Shaft DG1 (Drawing no. 382403/S/TI/009)
Tree Impact Assessment
Eastern Portal (Drawing no. 382403/S/TI/010)
Tree Impact Assessment
Shaft E5(A)(P) (Drawing no. 382403/S/TI/011-1)
Tree Impact Assessment
Shaft E5(B)(P) (Drawing no. 382403/S/TI/011-2)
Tree Impact Assessment Shaft E7(P) (Drawing no.
382403/S/TI/012)
Tree Impact Assessment
Shaft GL1 (Drawing no. 382403/S/TI/013)
Tree Impact Assessment
Shaft HKU1(P) (Drawing no. 382403/S/TI/014)
Tree Impact Assessment
Shaft HR1 (Drawing no. 382403/S/TI/015)
Tree Impact Assessment
Shaft M3(P) (Drawing no. 382403/S/TI/016)
Tree Impact Assessment
Shaft MA13(P) & MA14(P) (Drawing no. 382403/S/TI/017)
Tree Impact Assessment
Shaft MA15(P) (Drawing no. 382403/S/TI/018)
Tree Impact Assessment
Shaft MA17(P) (Drawing no. 382403/S/TI/019)
Tree Impact Assessment
Shaft MB16(P) (Drawing no. 382403/S/TI/020)
Tree Impact Assessment
Shaft MBD2 (Drawing no. 382403/S/TI/021)
Tree Impact Assessment
Shaft P5(P) (Drawing no. 382403/S/TI/022)
Tree Impact Assessment
Shaft PFLR1(P) (Drawing no. 382403/S/TI/023)
Tree Impact Assessment
Shaft RR1(P) (Drawing no. 382403/S/TI/024)
Tree Impact Assessment
Shaft THR2(P) (Drawing no. 382403/S/TI/025)
Tree Impact Assessment
Shaft TP4(P) (Drawing no. 382403/S/TI/026)
Tree Impact Assessment
Shaft TP5(P) (Drawing no. 382403/S/TI/027)
Tree Impact Assessment
Shaft TP789(P) (Drawing no. 382403/S/TI/028)
Tree Impact Assessment
Shaft W0(P) (Drawing no. 382403/S/TI/029)
Tree Impact Assessment
Shaft W1(P) (Drawing no. 382403/S/TI/030)
Tree Impact Assessment
Shaft W3(P) (Drawing no. 382403/S/TI/031)
Tree Impact Assessment
Shaft W5(P) (Drawing no. 382403/S/TI/032)
Tree Impact Assessment
Shaft W10 (Drawing no. 382403/S/TI/034)
Tree Impact Assessment
Shaft W11 (Drawing no. 382403/S/TI/035)
Tree Impact Assessment
Shaft W12(P) (Drawing no. 382403/S/TI/036)
Landscape Design Proposal
Shaft GL1(P) (Drawing no. 382403/S/L/013)
Landscape Design Proposal
Shaft HKU1(P) (Drawing no. 382403/S/L/014)
Landscape Design Proposal
Shaft HR1 (Drawing no. 382403/S/L/015)
Landscape Design Proposal
Shaft M3(P) (Drawing no. 382403/S/L/016)
Landscape Design Proposal
Shaft MA13(P) & MA14(P) (Drawing no. 382403/S/L/017)
Landscape Design Proposal
Shaft MA15(P) (Drawing no. 382403/S/L/018)
Landscape Design Proposal
Shaft MA17(P) (Drawing no. 382403/S/L/019)
Landscape Design Proposal
Shaft MB16(P) (Drawing no. 382403/S/L/020)
Landscape Design Proposal
Shaft MBD2 (Drawing no. 382403/S/L/021)
Landscape Design Proposal
Shaft P5(P) (Drawing no. 382403/S/L/022)
Landscape Design Proposal
Shaft PFLR1(P) (Drawing no. 382403/S/L/023)
Landscape Design Proposal
Shaft RR1(P) (Drawing no. 382403/S/L/024)
Landscape Design Proposal
Shaft THR2(P) (Drawing no. 382403/S/L/025)
Landscape Design Proposal
Shaft TP4(P) (Drawing no. 382403/S/L/026)
Landscape Design Proposal
Shaft TP5(P) (Drawing no. 382403/S/L/027)
Landscape Design Proposal
Shaft TP789(P) (Drawing no. 382403/S/L/028)
Landscape Design Proposal
Shaft W0(P) (Drawing no. 382403/S/L/029)
Landscape Design Proposal
Shaft W1(P) (Drawing no. 382403/S/L/030)
Landscape Design Proposal
Shaft W3(P) (Drawing no. 382403/S/L/031)
Landscape Design Proposal
Shaft W5 (P) (Drawing no. 382403/S/L/032)
Landscape Design Proposal
Shaft W8 (Drawing no. 382403/S/L/033)
Landscape Design Proposal
Shaft W10 (Drawing no. 382403/S/L/034)
Landscape Design Proposal
Shaft W11 (Drawing no. 382403/S/L/035)
Landscape Design Proposal
Shaft W12(P) (Drawing no. 382403/S/L/036)
Landscape Design Proposal
Western Portal (Drawing no. 382403/S/L/037)
Typical Architectural
Design Proposal for Intake (Drawing no. 382403/S/L/103)
Eastern Portal
Architectural Design Proposals (Drawing no. 382403S/L/104)
Eastern Portal
Architectural Design Proposals (Drawing no. 382403S/L/105)
Photomontage View A: Key
View Point to Proposed Eastern Tunnel Portal (382403/PM/001)
Photomontage View B: Key
View Point to Proposed Western Tunnel Portal (382403/PM/002)
Photomontage View C: Key
View Point to Proposed Western Tunnel Portal (382403/PM/003)
Photomontage View D: Key
View Point to Proposed Western Tunnel Portal (382403/PM/004)
Existing Key Photo
Viewpoints (Sheet 1 of 6) (Drawing no. 382403/P/001)
Existing Key Photo
Viewpoints (Sheet 2 of 6) (Drawing no. 382403/P/002)
Existing Key Photo
Viewpoints (Sheet 3 of 6) (Drawing no. 382403/P/003)
Existing Key Photo
Viewpoints (Sheet 4 of 6) (Drawing no. 382403/P/004)
Existing Key Photo
Viewpoints (Sheet 5 of 6) (Drawing no. 382403/P/005)
Existing Key Photo
Viewpoints (Sheet 6 of 6) (Drawing no. 382403/P/006)
11.1 Marine
Ecology Study Area
11.2 Recognised
Sites of Marine Conservation Importance
11.3 Distribution
of Chinese White Dolphin in the Study Area
11.4 Distribution
of Finless Porpoise in the Study Area
11.5 The
locations of the five dive sites with Western Buffer WCZ surveyed by Binnie in
1995
12.2 Site
of Fisheries Importance
12.3 Fishing
Areas within South of Hong Kong Sector
12.4
Fishing grids with Assessment Area