TABLE OF CONTENTS

 

1.         introduction.. 1-1

1.1       Background

1.2       The Assignment

1.3       Objectives of the EIA Study

1.4       Structure of the EIA Report

  1-4

2.         consideration of alternatives

2.1       Introduction

2.2       Alignment Option Review and Selection

2.3       Construction Alternatives

3.         PROJECT DESCRIPTION

3.1       Scope of the Project

3.2       Northern Section in Tuen Mun

3.3       Sub-sea Tunnel

3.4       Southern Section at HKBCF / North Lantau

3.5       Works Areas

3.6       Sewage and Drainage

3.7       Project Programme

3.8       Concurrent Projects

3.9       Traffic Data and Assumptions

3.10     Environmental Conditions in the Absence of the Project

4.         Air Quality

4.1       Environmental Legislation and Guidelines

4.2       Existing Air Quality

4.3       Identification of Air Sensitive Receivers

4.4       Identification of Potential Air Quality Impacts

4.5       Concurrent Projects

4.6       Construction Phase Assessment Methodology

4.7       Operational Phase Assessment Methodology

4.8       Construction Air Quality Assessment

4.9       Operational Air Quality Assessment

4.10     Residual Impacts

4.11     Environmental Monitoring and Audit

4.12     References

5.         Noise

5.1       Environmental Legislation and Guidelines

5.2       Identification of Noise Sensitive Receivers

5.3       Baseline Conditions

5.4       Identification of Potential Noise Impacts

5.5       Concurrent Projects

5.6       Assessment Methodology

5.7       Construction Noise Impact Assessment

5.8       Operational Noise Impact Assessment

5.9       Mitigation Measures

5.10     Residual Impacts

5.11     Environmental Monitoring and Audit

6.         WATER QUALITY

6.1       Introduction

6.2       Environmental Legislation

6.3       Existing Environment

6.4       Assessment Criteria

6.5       Key Issues

6.6       Concurrent Projects

6.7       Assessment Methodology

6.8       Operational Phase Assessment

6.9       Construction Phase Assessment

6.10     Mitigation Measures

6.11     Residual Impacts

6.12     Cumulative Impacts

6.13     Model Sensitivity Test

6.14     Environmental Monitoring and Audit

6.15     References

7.         Terrestrial Ecology

7.1       Introduction

7.2       Environmental Legislation

7.3       Key Ecological Sensitive Receivers

7.4       Ecological Baseline

7.5       Literature Review

7.6       Scope of Field Surveys

7.7       Field Survey Methodologies

7.8       Field Survey Results

7.9       Evaluation of Ecological Importance

7.10     Ecological Impact Assessment Methodology

7.11     Construction Phase Impact Assessment

7.12     Operation Phase Impact Assessment

7.13     Mitigation Measures

7.14     Residual Impacts

7.15     Cumulative Impacts

7.16     Ecological Monitoring and Audit Requirements

7.17   References

8.         Marine Ecology

8.1       Background

8.2       Environmental Legislation

8.3       Key Ecological Sensitive Receivers

8.4       Objectives of the Ecological Impact Assessment

8.5       Ecological Baseline

8.6       Literature Review

8.7       Scope of Field Surveys

8.8       Field Survey Methodologies

8.9       Field Survey Results

8.10     Impact Assessment Methodology

8.11     Prediction and Evaluation of Construction Phase Impacts

8.12     Prediction and Evaluation of Operational Phase Impact

8.13     Summary of Impacts Evaluation

8.14     Mitigation Measures

8.15     Enhancement Measures

8.16     Residual Impacts for TM-CLKL

8.17     Cumulative Impacts

8.18     Ecological Monitoring and Audit Requirements

8.19     References

9.         Fisheries

9.1       Background

9.2       Relevant Legislation

9.3       Baseline Conditions

9.4       Key Issues

9.5       Impact Evaluation

9.6       Mitigation Measures

9.7       Cumulative Impacts

9.8       Residual Impacts

9.9       Environmental Monitoring and Audit

9.10     References

10.       Landscape and Visual

10.1     Introduction

10.2     Environmental Legislation, Standards and Guidelines

10.3     Assessment Methodology

10.4     Scope and Content of the Study

10.5     Review of Planning and Development Control Framework

10.6     Baseline Study

10.7     Landscape Impact Assessment

10.8     Visual Impact Assessment

10.9     Mitigation Measures

10.10   Residual Impacts

10.11   Conclusion

11.       Cultural Heritage IMPACT Assessment

11.1     Project Background

11.2     Environmental Legislation

11.3     Objectives of the Cultural Heritage Impact Assessment

11.4     Assessment Methodology

11.5     Terrestrial Archaeology Impact Assessment

11.6     Built Heritage Impact Assessment

11.7     Marine Archaeological Impact Assessment

11.8     Mitigation Measures

11.9     Residual Impacts

11.10   Environmental Monitoring and Audit Requirements

11.11   References

12.       WASTE MANAGEMENT

12.1     Introduction

12.2     Environmental Legislation and Standards

12.3     Assessment Methodology

12.4     Construction Phase Waste Management Assessment

12.5     Operational Phase Waste Management Assessment

12.6     Mitigation Measures

12.7     Waste Disposal Recommendations

12.8     Residual Impacts

12.9     Monitoring and Audit Requirements

13        Land Contamination

13.1     Background

13.2     Environmental Legislation and Standards

13.3     Assessment Methodology

13.4     Survey Findings

13.5     Impact Assessment

13.6     Mitigation Measures

13.7     Residual Impacts

13.8     Environmental Monitoring and Audit

14.       LandFiLL Gas hazard

14.1     Background

14.2     The Assignment

14.3     Purpose and Structure of Section

14.4     Environmental Legislation, Policies, Plans, Standards and Criteria

14.5     History and General Description of the Pillar Point Valley Landfill

14.6     Potential Landfill Gas Hazards

14.7     Landfill Gas Hazard Assessment Criteria and Methodology

14.8     Source

14.9     Pathway

14.10   Target

14.11   Assessment of Potential Risk

14.12   Recommended Protection Measures

14.13   Conclusions

15.       ENVIRONMENTAL MONITORING AND AUDIT

15.1     Introduction

15.2     EM&A Requirements

15.3     EM&A Responsibilities

15.4     Reporting

15.5     Implementation Schedules

16.       SUMMARY OF ENVIRONMENTAL OUTCOMES

16.1     Overview

16.2     Alignment Selection

16.3     Integrated Protection Measures

16.4     Mitigation and Enhancement Measures

16.5     Summary of Key Findings and Recommendations

 

 

APPENICES

 

Appendix A

 

Appendix A1  

Environmental Mitigation Implementation Schedule

Appendix A2  

Concurrent Projects Summary

Appendix A3  

Traffic Data and Assumptions

Appendix A3.1 

Location Plan for EIA Traffic Forecasts (Lantau)

Appendix A3.2 

Location Plan for EIA Traffic Forecasts (Airport)

Appendix A3.3 

Location Plan for EIA Traffic Forecasts (Tuen Mun)

Appendix A3.4 

Location Plan for EIA Traffic Forecasts (Toll Plaza)

 

 

Appendix B

 

Appendix B1  

Vehicle Class Details

Appendix B2  

Implementation Schedule of Vehicle Emission Standards in Hong Kong

Appendix B3  

Details of Adjustments on Exhaust Technology Fractions in Each Vehicle Class

Appendix B4  

Vehicle Population

Appendix B5  

Trips per Vehicle-Mile-Travelled (VMT)

Appendix B6  

Hourly Temperature and Relative Humidity Profile

Appendix B7a  

Emission Inventories for Years 2014, 2016, 2021 and 2031

Appendix B7b 

Composite Emissions Factors for Roads of HKLR and HKBCF

Appendix B8  

Justifications for the Estimation of Surface Roughness Length

Appendix B9  

Emissions from Tunnel Portals and Ventilation Buildings

Appendix B10  

Construction Phase Modelling Results

Appendix B11  

Details of Sensitivity Analysis of Emission Inventory

Appendix B12  

Predicted Hourly NO2 and RSP Results from Open Roads from Caline4 Modelling

Appendix B13  

Predicted Maximum Hourly, 24-hour and Annual Average NO2 and RSP concentrations from ISCST3 Modelling

 

 

Appendix C

 

Appendix C1  

Traffic Information for Noise Assessment

Appendix C2  

Construction Noise Plant Inventory

Appendix C3  

Predicted Traffic Noise Result

Appendix C4  

Noise Model Impact Files

 

 

Appendix D

 

Appendix D1  

Sediment Testing Results for TM-CLKL, HKBCF and HKLR

Appendix D2  

Summary of Proposed Simulations for Water Quality Modelling for the TM-CLKL, HKBCF and HKLR

Appendix D3  

Calculation of Loss Coefficients for Bridge Piers

Appendix D4  

Pollution Loading Inventory

Appendix D5  

Cumulative Dredging and Sediment Loss Rates

Appendix D6  

Water Quality Mitigation – Silt Curtain Application

Appendix D7  

2026 Hydrodynamic and Water Quality Modelling Results

Appendix D7a 

2026 Hydrodynamic Modelling Results (with & without project)

Appendix D7b 

2026 Water Quality Modelling Results

Appendix D7c 

Comparison of Monthly Average of Key Water Quality Parameters

Appendix D8  

2011 Construction Plumes Modelling Results

Appendix D8a 

2011 - Sediment Plumes and Sedimentation Contours for Unmitigated Scenario (P0M0)

Appendix D8b 

2011 - Sediment Plumes and Sedimentation Contours for Mitigated Scenario (Option 1) (P0M1)

Appendix D8c 

2011 - Sediment Plumes and Sedimentation Contours for Mitigated Scenario (Option 1) with Concurrent Projects (P1M1)

Appendix D8d 

2011 - Time History Plots of SS for the Three Scenarios (P0M0, P0M1 and P1M1)

Appendix D9  

2012 Construction Plumes Modelling Results

Appendix D9a 

2012 - Sediment Plumes and Sedimentation Contours for Unmitigated Scenario (P0M0)

Appendix D9b 

2012 - Sediment Plumes and Sedimentation Contours for Mitigated Scenario (Option 1) (P0M1)

Appendix D9c 

2012 - Sediment Plumes and Sedimentation Contours for Mitigated Scenario (Option 1) with Concurrent Projects (P1M1)

Appendix D9d 

2012 - Time History Plots of SS for the Three Scenarios (P0M0, P0M1 and P1M1)

Appendix D10 

2013 Construction Plumes Modelling Results

Appendix D10a 

2013 - Sediment Plumes and Sedimentation Contours for Unmitigated Scenario (P0M0)

Appendix D10b 

2013 - Sediment Plumes and Sedimentation Contours for Mitigated Scenario (Option 1) (P0M1)

Appendix D10c 

2013 - Sediment Plumes and Sedimentation Contours for Mitigated Scenario (Option 1) with Concurrent Projects (P1M1)

Appendix D10d 

2013 - Time History Plots of SS for the Three Scenarios (P0M0, P0M1 and P1M1)

Appendix D11  

Summary of Construction Phase SS Elevation, Contaminant Release, DO depletion and Sedimentation for unmitigated and mitigated (Option 1) scenarios for 2011, 2012 and 2013

Appendix D12 

Construction Plumes Modelling Results for Extra Mitigation Scenario (Option 2) (P0M2)

Appendix D12a 

2011 - Sediment Plume and Sedimentation Contours and Time-history for Mitigated Scenario (Option 2) (P0M2)

Appendix D12b 

2012 - Sediment Plume and Sedimentation Contours and Time-history for Mitigated Scenario (Option 2) (P0M2)

Appendix D12c 

2013 - Sediment Plume and Sedimentation Contours and Time-history for Mitigated Scenario (Option 2) (P0M2)

Appendix D12d 

Summary of Construction Phase SS Elevation, Contaminant Release, DO depletion and Sedimentation for mitigated (Option 2) (P0M2) scenarios

Appendix D13 

Construction Plumes Modelling Results for Sensitivity Test (Option 1) (PxM1)

Appendix D13a 

2011 - Sediment Plumes and Sedimentation Contour for Mitigated Scenario (Option 1) with Concurrent Projects (PxM1)

Appendix D13b 

Summary of Construction Phase SS Elevation

Appendix D14a 

2011 (Sequence B) – Sediment Plume and Sedimentation Contour and Time-history for Mitigated Scenarios (POM1)

Appendix D14b 

Summary of Construction Phase SS Elevation, Contaminant Release, DO depletion and Sedimentation for Mitigated (Sequence B) Scenarios

Appendix D15 

Model Verification

Appendix D15a 

Time History Plot for WHM and WHM-RG1

Appendix D15b 

Time History Plot for 2010 (Baseline) – 3rd Production (P3) and 4th Production (P4)

Appendix D15c 

Time History Plot for 2011 (Sequence B) – Spin Up (S1) and Production (P1)

 

 

Appendix E

 

Appendix E1  

Ecological Baseline Survey of Avifauna under HZMB Study

Appendix E2  

Ecological Baseline Survey of Avifauna under TMWB Study

Appendix E3  

Ecological Baseline Survey of Avifauna under TM-CLKL Study

Appendix E4  

Ecological Baseline Survey of Mammal under HZMB Study

Appendix E5  

Ecological Baseline Survey of Mammal under TMWB Study

Appendix E6  

Ecological Baseline Survey of Mammal under TM-CLKL Study

Appendix E7  

Ecological Baseline Survey of Herpetofauna under HZMB Study

Appendix E8  

Ecological Baseline Survey of Herpetofauna under TMWB Study

Appendix E9  

Ecological Baseline Survey of Herpetofauna under TM-CLKL Study

Appendix E10 

Ecological Baseline Survey of Dragonflies under HZMB Study

Appendix E11  

Ecological Baseline Survey of Dragonflies under TMWB Study

Appendix E12 

Ecological Baseline Survey of Dragonflies under TM-CLKL Study

Appendix E13 

Ecological Baseline Survey of Butterflies under HZMB Study

Appendix E14 

Ecological Baseline Survey of Butterflies under TMWB Study

Appendix E15 

Ecological Baseline Survey of Butterflies under TM-CLKL Study

Appendix E16 

Ecological Baseline Survey of Freshwater and Estuarine Fish under HZMB Study

Appendix E17 

Ecological Baseline Survey of Freshwater and Estuarine Fish under TM-CLKL Study

Appendix E18 

Ecological Baseline Survey of Aquatic (Stream) Fauna under HZMB Study

Appendix E19 

Ecological Baseline Survey of Aquatic (Stream) Fauna under TM-CLKL Study

Appendix E20 

Ecological Baseline Survey of Plant Species under HZMB Study

Appendix E21 

Ecological Baseline Survey of Plant Species under TMWB Study

Appendix E22 

Ecological Baseline Survey of Plant Species under TM-CLKL Study

 

 

Appendix F

 

Appendix F1  

Tuen Mun – Chek Lap Kok Link – Ecological Investigation, Final Survey Report for Chinese White Dolphin

Appendix F2  

Hong Kong - Zhuhai - Macao Bridge, Hong Kong Section and North Lantau Highway Connection, Ecological Baseline Survey - Marine Benthic Macrofauna

Appendix F3  

Tuen Mun – Chek Lap Kok Link – Investigation, Interim Results of Ecological Survey - Benthic Macro-infauna

Appendix F4  

Hong Kong - Zhuhai - Macao Bridge, Hong Kong Section and North Lantau Highway Connection, Ecological Baseline Survey - Intertidal

Appendix F5  

Tuen Mun Western Bypass – Investigation, Intertidal Survey Results - Intertidal Invertebrates

Appendix F6  

Tuen Mun - Chek Lap Kok Link – Investigation, Interim Results of Ecological Survey - Intertidal Epifauna (Quantitative Quadrat)

Appendix F7  

Not Use

Appendix F8  

Not Use

Appendix F9  

Hong Kong - Zhuhai - Macao Bridge, Hong Kong Section and North Lantau Highway Connection, Ecological Baseline Survey - Horseshoe Crabs Horseshoe Crab Survey Results

Appendix F10  

Tuen Mun - Chek Lap Kok Link – Investigation, Interim Results of Ecological Survey - Horseshoe Crabs

Appendix F11 

Field Diving Surveys of Corals for the Hong Kong – Zhuhai – Macau Bridge

Appendix F12  

Marine Ecological Survey Report - The Tuen Mun to Chek Lap Kok Link Road

Appendix F13 

Seabed Features and Cable Alignments

 

 

Appendix I

 

Appendix I1  

Built Heritage Catalogue

Appendix I2  

Marine Geophysical Report

 

 

Appendix K

 

Appendix K  

Preliminary Site Appraisal Checklist

 

 

Appendix L

 

Appendix L1  

Landfill Gas Monitoring Records

Appendix L2  

Groundwater Monitoring Records

Appendix L3  

EPD/TR8/97 Landfill Gas Hazard Assessment Guidance Note, Chapter 8

 

 

Figures

Figure 2.1            Previous Alignment Options for TM-CLKL

Figure 2.2            Previous Short-Listed Alignment Options for TM-CLKL

Figure 2.3            Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities – Tentative

Figure 2.4            Overview of Northern Connection Options

Figure 2.5            Southern Connection Options S1 – Viaduct

Figure 2.5a          Southern Connection Option S1A – Tunnel

Figure 2.6            Overview of Main Crossing Options

Figure 3.1            General Layout of TM-CLKL

Figure 3.2a          Layout Plan of Northern Landfall

Figure 3.2b          Layout Plan of Southern Landfall

Figure 3.3a          Northern Landfall – General Layout

Figure 3.3b          Northern Landfall – Section B - B

Figure 3.3c          Northern Landfall – Section D - D

Figure 3.4a          Northern Viaduct Connection, Slip Roads and Toll Plaza

Figure 3.4b          Traffic Flows at Toll Plaza

Figure 3.5a          Geological Section (Sheet 1 of 3)

Figure 3.5b          Geological Section (Sheet 2 of 3)

Figure 3.5c          Geological Section (Sheet 3 of 3)

Figure 3.6a          Southern Landfall – General Layout

Figure 3.6b          Southern Landfall – Section A - A

Figure 3.6c          Southern Landfall – Section C - C

Figure 3.7            Southern Viaduct Connection and Slip Roads

Figure 3.8a          Proposed Works Areas for TM-CLKL (Tuen Mun Side)

Figure 3.8b          Proposed Works Areas for TM-CLKL (Lantau Side)

Figure 3.9a          Indicative Construction Programme in Tuen Mun

Figure 3.9b          Indicative Construction Programme in North Lantau

Figure 3.9c          Portions of Works in Tuen Mun

Figure 3.9d          Portions of Works in North Lantau

Figure 4.1            Site Layout Plan of TM-CLKL

Figure 4.2            Representative Air Sensitive Receivers (Sheet 1 of 3)

Figure 4.3           Representative Air Sensitive Receivers (Sheet 2 of 3)

Figure 4.4           Representative Air Sensitive Receivers (Sheet 3 of 3)

Figure 4.5            Road Network

Figure 4.6            Potential Emission Sources of Concurrent Projects

Figure 4.7            Classification of Road Types

Figure 4.8            Location of Nearby Core Stations

Figure 4.9            Location of MM5 Meteorological Data

Figure 4.10a        Hourly Averaged TSP Concentraction at 1.5M above Ground Level at Lantau for Scenario 1

Figure 4.10b        24 Hour Averaged TSP Concentration at 1.5M above Ground Level at Lantau for Scenario 1

Figure 4.10c        Annual Averaged TSP Concentration at 1.5M above Ground Level at Lantau for Scenario 1

Figure 4.10d        Hourly Averaged TSP Concentration at 1.5M above Ground Level at Tuen Mun for Scenario 1

Figure 4.10e        24 Hour Averaged TSP Concentration at 1.5M above Ground Level at Tuen Mun for Scenario 1

Figure 4.10f        Annual Averaged TSP Concentration at 1.5M above Ground Level at Tuen Mun for Scenario 1

Figure 4.11a        Hourly Averaged TSP Concentration at 1.5M above Ground Level at Lantau for Scenario 2

Figure 4.11b        24 Hour Averaged TSP Concentration at 1.5M above Ground Level at Lantau for Scenario 2

Figure 4.11c        Annual Averaged TSP Concentration at 1.5M above Ground Level at Lantau for Scenario 2

Figure 4.11d        Hourly Averaged TSP Concentration at 1.5M above Ground Level at Tuen Mun for Scenario 2

Figure 4.11e        24 Hour Averaged TSP Concentration at 1.5M above Ground Level at Tuen Mun for Scenario 2

Figure 4.11f        Annual Averaged TSP Concentration at 1.5M above Ground Level at Tuen Mun for Scenario 2

Figure 4.12a        Hourly Averaged NO2 Concentration at 1.5M above Ground Level at Lantau

Figure 4.12b        Hourly Averaged NO2 Concentration at 1.5M above Ground Level at Tuen Mun

Figure 4.13a        Daily Averaged NO2 Concentration at 1.5M above Ground Level at Lantau

Figure 4.13b        Daily Averaged NO2 Concentration at 1.5M above Ground Level at Tuen Mun

Figure 4.13c        Daily Averaged RSP Concentration at 1.5M above Ground Level at Lantau

Figure 4.13d        Daily Averaged RSP Concentration at 1.5M above Ground Level at Tuen Mun

Figure 4.14a        Annual Averaged NO2 Concentration at 1.5M above Ground Level at Lantau

Figure 4.14b        Annual Averaged NO2 Concentration at 1.5M above Ground Level at Tuen Mun

Figure 4.14c        Annual Averaged RSP Concentration at 1.5M above Ground Level at Lantau

Figure 4.14d       Annual Averaged RSP Concentration at 1.5M above Ground Level at Tuen Mun

Figure 5.1            Representative Noise Sensitive Receivers

Figure 5.2            Proposed Layout Plan of Southern Connection – Key Plan

Figure 5.3            Indicative Construction Programme in North Lantau (Sheet 1 of 2)

Figure 5.4            Indicative Constrcution Programme in North Lantau (Sheet 2 of 2)

Figure 5.5            Representative Existing NSR Identified at Pak Mong Village

Figure 5.6            Proposed Noise Mitigation Measure

Figure 6.1            Location Plan for TM-CLKL, HKBCF and HKLR

Figure 6.2a          Envisaged Programme of Reclamation and Sediment Loss Rates for TM-CLKL+HKBCF+HKLR (Sequence A)

Figure 6.2b          Envisaged Programme of Reclamation and Sediment Loss Rates for TM-CLKL+HKBCF+HKLR (Sequence B)

Figure 6.2d          Overall Programme for TM-CLKL + HKBCF + HKLR – Maximum Daily Production Rate (bulked volume, m3/day)(Sequence A)

Figure 6.2e          Overall Programme for TM-CLKL + HKBCF + HKLR – Daily No. of Plant Trips (Sequence A)

Figure 6.2f          Overall Programme for TM-CLKL + HKBCF + HKLR – Maximum Daily Production Rate (bulked volume, m3/day)(Sequence B)

Figure 6.2g          Overall Programme for TM-CLKL + HKBCF + HKLR – Daily No. of Plant Trips (Sequence B)

Figure 6.5a           Management Frameworks for Dredged/Excavated Sediment

Figure 6.5b          Location of Water Quality Model Output Points and Associated EPD Stations

Figure 6.6            Key Area of Seabed Disturbance

Figure 6.7          Location of Water Quality and Ecological Sensitive Receivers

Figure 6.8            Monitoring Stations used for the Management of Contaminated Mud Pits at East of Sha Chau (2000-2005)

Figure 6.9            Sediment Sampling Locations for TM-CLKL, HZMB and others (Indicative)

Figure 6.10          Coverage of Western Harbour Model

Figure 6.11          Comparison of Original and Refined Model Grids

Figure 6.12a         Assumed Ultimate Coastline when TMCLKL + HKBCF + HKLR is completed (2026)

Figure 6.12b        Indicative Location of Box Culverts for Discharges of Storm Waters and Treated Effluent (HKBCF + HKLR)

Figure 6.13          Main Flow Channel in Western Harbour

Figure 6.14        Indicative Location of Box Culverts for Discharges of Storm Waters from TM-CLKL

Figure 6.15          Predicted 2026 Wet Season Salinity Profiles at WSR 27 and WSR 43

Figure 6.16          2011 Dry Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Unmitigated Scenario)

Figure 6.17          2011 Dry Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Mitigated Scenario)

Figure 6.18          2011 Wet Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Unmitigated Scenario)

Figure 6.19          2011 Wet Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Mitigated Scenario)

Figure 6.20          2012 Dry Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Unmitigated Scenario)

Figure 6.21          2012 Dry Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Mitigated Scenario)

Figure 6.22          2012 Wet Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Unmitigated Scenario)

Figure 6.23          2012 Wet Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Mitigated Scenario)

Figure 6.24          2013 Dry Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Unmitigated Scenario)

Figure 6.25          2013 Dry Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Mitigated Scenario)

Figure 6.26          2013 Wet Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Unmitigated Scenario)

Figure 6.27          2013 Wet Season Predicted Maximum Sediment Plumes and Dolphin Density in North Lantau Waters (Mitigated Scenario)

Figure 6.26          2011 (Sequence B) Dry Season Predicted Maximum Sediment Plumes and Doplhin Density in North Lantau Waters (Mitigated Scenario)

Figure 6.27          2011 (Sequence B) Wet Season Predicted Maximum Sediment Plumes and Doplhin Density in North Lantau Waters (Mitigated Scenario)

Figure 7.1            Areas Surveyed for Avifauna, Mammals, Herpetofauna, Stream Infauna and Insects During September 2003 to May 2004 Under HZMB Study

Figure 7.2a          Areas Surveyed for Avifauna, Mammals, Herpetofauna, Stream Infauna and Insects During September 2003 to May 2004 Under HZMB Study

Figure 7.2b          Stream and Tributaries Surveyed Between September 2003 to May 2004 Under HZMB Study

Figure 7.3            Areas Surveyed for Avifauna, Mammals, Herpetofauna and Insects During September 2003 to May 2004 Under TMWB Study

Figure 7.4a          North Lantau Areas Surveyed for Avifauna, Mammals, Herpetofauna, Insects and Stream Fauna Under TM-CLKL Study

Figure7.4b           Tuen Mun Areas Surveyed for Avifauna, Mammals, Herpetofauna, Insects and Stream Fauna Under TM-CLKL Study

Figure 7.5a          Key Plan of Habitat Map within Study Area

Figure 7.5b          Habitat Map of Tai Ho Wan, North Lantau

Figure 7.5c          Habitat Map of Tai Ho Wan, North Lantau

Figure 7.5d          Habitat Map of Tai Ho Wan, North Lantau

Figure 7.5e          Habitat Map of Pillar Point, Tuen Mun

Figure 7.5f          Habitat Map of Pillar Point, Tuen Mun

Figure 7.6a          Location of Species of Conservation Interest Recorded in North Lantau between 2003 to 2009

Figure 7.6b          Location of Species of Conservation Interest Recorded in Tuen Mun between 2003 to 2009

Figure 7.7            Photographs of Faunal Species of Conservation Interest Present within the Study Area

Figure 7.8a          Photographs of Habitats Present within the Study Area

Figure 7.8b          Photographs of Habitats Present within the Study Area

Figure 7.9            Photographs of Floral Species of Conservation Interest Present within the Study Area

Figure 7.10          Streams and Tributaries in North Lantau

Figure 7.11          Height of Avifauna Flightline Recorded and Proposed Viaducts of Southern Connection of TM-CLKL

Figure 8.1a          Key Marine Ecological Sensitive Receivers Around the Study Area

Figure 8.1b          Sighting Density of Chinese White Dolphin in waters around Lantau Island during 2002-08

Figure 8.1c          Habitat Map – Coastline along North Lantau

Figure 8.1d          Habitat Map – Coastline along Tuen Mun

Figure 8.2a          Photographs of Habitats and Species of Conservation Interest Present in the Wider Study Area

Figure 8.2b          Photographs of Habitats and Species of Conservation Interest Present in the Wider Study Area

Figure 8.2c          Photographs of Habitats and Species of Conservation Interest Present in the Wider Study Area

Figure 8.3            Layout of Transect Lines of Chinese White Dolphin Servey in Northeast and Northwest Lantau Survey Area

Figure 8.4a          Survey Stations for Benthic, Coral, Horseshoe Crab, Seagrass and Intertidal Surveys Under HZMB Study (2003-2004)

Figure 8.4b          Location of Coral Surveys Under HZMB Study

Figure 8.5a          Survey Staions for Benthic, Horeshoe Crab, Seagrass and Intertidal Survey Under TM-CLKL Study (2008-2009)

Figure 8.5b          Survey Stations for Coral (Spot Dive and REA) Survey Under TM-CLKL Study (2008-2009)

Figure 8.6            Intertidal Survey Locations at Pillar Point Under TMWB Study (2008-2009)

Figure 8.7            Sampling Locations under HKLR Verification Survey for Ecological Baseline

Figure 8.8            Sampling Locations under HKLR Supplementary Ecological Survey

Figure 8.9            Locations of Hard and Soft Coral Surveyed Under TM-CLKL Coral Study (2008-2009)

Figure 9.1            Distribution of Key Fisheries Sensitive Receivers

Figure 9.2            Distribution of Fisheries Production

Figure 9.3            Distribution of Fishing Operations

Figure 9.4            Distribution of Overall Fisheries Production

Figure 9.5            2011 Dry Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Unmitigated Scenario)

Figure 9.6            2011 Dry Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Mitigated Scenario)

Figure 9.7            2011 Wet Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Unmitigated Scenario)

Figure 9.8            2011 Wet Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Mitigated Scenario)

Figure 9.9            2012 Dry Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Unmitigated Scenario)

Figure 9.10          2012 Dry Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Mitigated Scenario)

Figure 9.11          2012 Wet Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Unmitigated Scenario)

Figure 9.12          2012 Wet Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Mitigated Scenario)

Figure 9.13          2013 Dry Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Unmitigated Scenario)

Figure 9.14          2013 Dry Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Mitigated Scenario)

Figure 9.15          2013 Wet Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Unmitigated Scenario)

Figure 9.16          2013 Wet Season Predicted Maximum Sediment Plumes and Fisheries Production in North Lantau Waters (Mitigated Scenario)

Figure 9.17          Premanently and Temporarily Affected Marine Areas

Figure 10.1         Landscape and Visual Impact Study Area

Figure 10.1.1      Review of Planning Framework Plan (Sheet 1 of 2)

Figure 10.1.2      Review of Planning Framework Plan (Sheet 2 of 2)

Figure 10.2.1.1   Baseline Landscape Resources with Development Proposal Overlaid (Sheet 1 of 5)

Figure 10.2.1.2   Baseline Landscape Resources with Development Proposal Overlaid (Sheet 2 of 5)

Figure 10.2.1.3   Baseline Landscape Resources with Development Proposal Overlaid (Sheet 3 of 5)

Figure 10.2.1.4   Baseline Landscape Resources with Development Proposal Overlaid (Sheet 4 of 5)

Figure 10.2.1.5   Baseline Landscape Resources with Development Proposal Overlaid (Sheet 5 of 5)

Figure 10.2.1A   Baseline Landscape Resources Photos (Sheet 1 of 4)

Figure 10.2.1B   Baseline Landscape Resources Photos (Sheet 2 of 4)

Figure 10.2.1C   Baseline Landscape Resources Photos (Sheet 3 of 4)

Figure 10.2.1D   Baseline Landscape Resources Photos (Sheet 4 of 4)

Figure 10.2.2.1   Broadbrush Tree Survey Plan (Sheet 1 of 2)

Figure 10.2.2.2   Broadbrush Tree Survey Plan (Sheet 2 of 2)

Figure 10.3.1.1   Baseline Landscape Character Areas with Development Proposal Overlaid (Sheet 1 of 5)

Figure 10.3.1.2   Baseline Landscape Character Areas with Development Proposal Overlaid (Sheet 2 of 5)

Figure 10.3.1.3    Baseline Landscape Character Areas with Development Proposal Overlaid (Sheet 3 of 5)

Figure 10.3.1.4    Baseline Landscape Character Areas with Development Proposal Overlaid (Sheet 4 of 5)

Figure 10.3.1.5    Baseline Landscape Character Areas with Development Proposal Overlaid (Sheet 5 of 5)

Figure 10.3.1A    Baseline Landscape Character Areas Photos (Sheet 1 of 2)

Figure 10.3.1B    Baseline Landscape Character Areas Photos (Sheet 2 of 2)

Figure 10.4.1.1    Baseline Key VSRs and Viewpoint at Local Level with Development Proposal Overlaid During Construction (Sheet 1 of 2)

Figure 10.4.1.2    Baseline Key VSRs and Viewpoint at Local Level with Development Proposal Overlaid During Construction (Sheet 2 of 2)

Figure 10.4.1.3    Baseline Key VSRs and Viewpoints at Local Level with Development Proposal Overlaid During Operation (Sheet 1 of 2)

Figure 10.4.1.4    Baseline Key VSRs and Viewpoints at Local Level with Development Proposal Overlaid During Operation (Sheet 2 of 2)

Figure 10.4.1.A   Baseline Key VSRs Photo at Local Level (Sheet 1 of 9)

Figure 10.4.1.B   Baseline Key VSRs Photo at Local Level (Sheet 2 of 9)

Figure 10.4.1.C   Baseline Key VSRs Photo at Local Level (Sheet 3 of 9)

Figure 10.4.1.D   Baseline Key VSRs Photo at Local Level (Sheet 4 of 9)

Figure 10.4.1.E   Baseline Key VSRs Photo at Local Level (Sheet 5 of 9)

Figure 10.4.1.F    Baseline Key VSRs Photo at Local Level (Sheet 6 of 9)

Figure 10.4.1.G   Baseline Key VSRs Photo at Local Level (Sheet 7 of 9)

Figure 10.4.1.H   Baseline Key VSRs Photo at Local Level (Sheet 8 of 9)

Figure 10.4.1.I    Baseline Key VSRs Photo at Local Level (Sheet 9 of 9)

Figure 10.4.1J     Baseline Viewpoints from VSRs at Local Level (Sheet 1 of 3)

Figure 10.4.1K    Baseline Viewpoints from VSRs at Local Level (Sheet 2 of 3)

Figure 10.4.1L    Baseline Viewpoints from VSRs at Local Level (Sheet 3 of 3)

Figure 10.4.2.1    Baseline Key VSRs and Viewpoints at Strategic and District Level with Development Proposal Overlaid

Figure 10.4.2.A   Baseline Key VSRs Photo at Strategic and District Level (Sheet 1 of 2)

Figure 10.4.2.B   Baseline Key VSRs Photo at Strategic and District Level (Sheet 2 of 2)

Figure 10.4.2.C   Baseline Viewpoints From VSRs at Strategic and District Level (Sheet 1 of 2)

Figure 10.4.2.D   Baseline Viewpoints From VSRs at Strategic and District Level (Sheet 2 of 2)

Figure 10.5.1       Key Plan of Section

Figure 10.5.2       Sections

Figure 10.6.1.1    Residual Impacts on Landscape Resources with Mitigation Measures in Year 10 (Sheet 1 of 2)

Figure 10.6.1.2    Residual Impacts on Landscape Resources with Mitigation Measures in Year 10 (Sheet 2 of 2)

Figure 10.6.2.1    Residual Impacts on Landscape Character Areas with Mitigation Measures in Year 10 (Sheet 1 of 2)

Figure 10.6.2.2    Residual Impacts on Landscape Character Areas with Mitigation Measures in Year 10 (Sheet 2 of 2)

Figure 10.6.3.1    Residual Impacts on VSRs at Local Level with Mitigation Measures in Year 10 (Sheet 1 of 2)

Figure 10.6.3.2    Residual Impacts on VSRs at Local Level with Mitigation Measures in Year 10 (Sheet 2 of 2)

Figure 10.6.4       Residual Impacts on VSRs at Strategic and District Level with Mitigation Measures in Year 10

Figure 10.7          Key Plan of Photomontage and Model View Viewpoints

Figure 10.7.1       View Point Location Plan of Photo No. G01

Figure 10.7.1A    View Point No. G01 Photomontage from Tuen Mun Promenade

Figure 10.7.2       View Point Location Plan of Photo No. G02

Figure 10.7.2A    View Point No. G02 Photomontage from Butterfly Beach (Sheet 1 of 2)

Figure 10.7.2B    View Point No. G02 Photomontage from Butterfly Beach (Sheet 2 of 2)

Figure 10.7.3       View Point Location Plan of Photo No. G03

Figure 10.7.3A    View Point No. G03 Photomontage from Golden Beach

Figure 10.7.4       View Point Location Plan of Photo No. G04

Figure 10.7.4A    View Point No. G04 Photomontage from Tung Chung Cable Car

Figure 10.7.5       View Point Location Plan of Photo No. G05

Figure 10.7.5A    View Point No. G05 Photomontage from Tung Chung Residential Area (Sheet 1 of 2)

Figure 10.7.5B    View Point No. G05 Photomontage from Tung Chung Residential Area (Sheet 2 of 2)

Figure 10.7.6       View Point Location Plan of Photo No. G06

Figure 10.7.6A    View Point No. G06 Photomontage from Asia World Expo (Sheet 1 of 2)

Figure 10.7.6B    View Point No. G06 Photomontage from Asia World Expo (Sheet 2 of 2)

Figure 10.7.7       View Point Location Plan of Photo No. G07

Figure 10.7.7A    View Point No. G07 Photomontage from the Ground Level of the Planned Theme Park / Recreation Use

Figure 10.7.8       View Point Location Plan of Photo No. G08

Figure 10.7.8A    View Point No. G08 Photomontage from Villages of Tai Ho

Figure 10.7.9       View Point Location Plan of Photo No. G09

Figure 10.7.9A    View Point No. G09 Photomontage from Siu Ho Wan Railway Depot

Figure 10.7.10     View Point Location Plan of Photo No. G10

Figure 10.7.10A  View Point No. G10 Photomontage from Planed Theme Park / Major Recreational Uses

Figure 10.7.11     View Point Location Plan of Photo No. G11

Figure 10.7.11A  View Point No. G11 Photomontage from Planned lantau Logistics Park

Figure 10.8.1       Aesthetic Design Treatment on Viaduct (Sheet 1 of 2)

Figure 10.8.2       Aesthetic Design Treatment on Viaduct (Sheet 2 of 2)

Figure 10.9.1       Landscape Plan (Sheet 1 of 13)

Figure 10.9.2       Landscape Plan (Sheet 2 of 13)

Figure 10.9.3       Landscape Plan (Sheet 3 of 13)

Figure 10.9.4       Landscape Plan (Sheet 4 of 13)

Figure 10.9.5       Landscape Plan (Sheet 5 of 13)

Figure 10.9.6       Landscape Plan (Sheet 6 of 13)

Figure 10.9.7       Landscape Plan (Sheet 7 of 13)

Figure 10.9.8       Landscape Plan (Sheet 8 of 13)

Figure 10.9.9       Landscape Plan (Sheet 9 of 13)

Figure 10.9.10     Landscape Plan (Sheet 10 of 13)

Figure 10.9.11     Landscape Plan (Sheet 11 of 13)

Figure 10.9.12     Landscape Plan (Sheet 12 of 13)

Figure 10.9.13     Landscape Plan (Sheet 13 of 13)

Figure 11.1          The Geology and Topography Map in Northern Landing Area

Figure 11.1a        Location of Northern Landing

Figure 11.1b        Location of Southern Landing

Figure 11.2a        Archaeological Map (1905-1909)

Figure 11.2b        The Geology and Topography Map in Northern Landing Area

Figure 11.2c        Section of the 1866 Map PF the San on District Showing the Project Study Area

Figure 11.2d        1896 Map of Hong Kong Showing the Project Study Area

Figure 11.3a        Potential Archaeological Area in the Project Area

Figure 11.3b        Areas of Archaeological Potential Relative to the Project Layout

Figure 11.4a        Location of Heritage Features at Tuen Mun Side

Figure 11.4b        Retaining Walls Arrangement at Existing Grave

Figure 11.5          Location of Heritage Features at North Lantau Side

Figure 11.6          1856 French Chart Canal Nord Du Lantau

Figure 11.7          British Admiralty Chart 1878

Figure 11.8          British Admiralty Chart 1889

Figure 11.9          1819 San on Yuen Cartogram from the Directory of San on County

Figure11.10         Images of Maritihe Activity in the Vicinity of Tung Chung

Figure 11.11        Images of Tung Chung Walled City and Shek She Fort

Figure 11.12        Identification of Data Gap and Area Requiring Mai Survey

Figure 11.13        Side Scan Sonar Data Showing Sonar Contacts SC003, SC004 & SC005

Figure 11.14        Location of Sonar Contact

Figure 11.15        Side Scan Sonar Data Showing Sonar Contacts TH_4 & 5

Figure 11.16        Key Areas of Seabed Disturbance

Figure 11.17a      Utility Location Plan (Sheet 1 of 2)

Figure 11.17b      Utility Location Plan (Sheet 2 of 2)

Figure 12.1          Demarcation of Sediment Type

Figure 13.1          Geological Map

Figure 13.2          Geological Plan (Sheet 1 of 3)

Figure 13.3          Geological Plan (Sheet 2 of 3)

Figure 13.4          Geological Plan (Sheet 3 of 3)

Figure 13.5          Vertical Alignment of Proposed Subsea Tunnel (Sheet 1 of 3)

Figure 13.6          Vertical Alignment of Proposed Subsea Tunnel (Sheet 2 of 3)

Figure 13.7          Vertical Alignment of Proposed Subsea Tunnel (Sheet 3 of 3)

Figure 13.8          Location of Northern Landing

Figure 13.9          Location of Southern Landing

Figure 13.10        Location of Works Area 4

Figure 13.11        Location of Works Area 5

Figure 13.12        Location of Works Area 6

Figure 13.13        Location of Works Area 23

Figure 13.14        Location of Works Area 18 & 19

Figure 13.15        Historic Photographs at Northern Landing

Figure 13.16        Historic Photographs at Southern Landing

Figure 13.17        Historic Photographs at Works Area 4

Figure 13.18        Historic Photographs at Works Area 5

Figure 13.19        Historic Photographs at Works Area 6

Figure 13.20        Historic Photographs at Works Area 23

Figure 13.21        Interface between Pillar Point Valley Landfill & Toll Plaza

Figure 14.1          Location of Pillar Point Valley Landfill

Figure 14.2          Landfill Gas Monitoring Locations

Figure 14.3          Ground Water Monitoring Locations

Figure 14.4          Geological Map

Figure 14.5          Vertical Profile of The Toll Plaza and Road Networks

Figure 14.6          Typical Design for Services Passing through the Consultation Zone and the Service Termination

Figure 14.7          Subfloor Venting

Figure 14.8          Passive Trench Vent (Outline)

Figure 14.9          Typical Design of Remote Cut-off Trench Barrier

Figure 14.10        Open Conduit Protection by Water Seal (Longitudinal-section)

Figure 14.11        Vented Manhole (Cross-section)

Figure 14.12        Typical Detail of Collar Seal (Cross-section)

Figure 14.13        Above Ground Service Entry

Figure 14.14        Vented Gas Interceptor Cavity (Cross-section)