PROJECT DESCRIPTION

The Extension covers an area of around 50 hectares. The total net void capacity for waste is around 17 Mm3. The lifespan of the Extension is estimated to be around six years, with operations starting in 2013.

The design of the Extension includes:
A landfill liner and cap A landfill gas management system
A leachate management system A surface water management system
A groundwater management system Odour management and control system
Site infrastructure