Environmental Impact Assessment (EIA) Ordinance, Cap.499
Application for Permission to Apply Directly for Environmental Permit
(Application No.: DIR-073/2002)
Project Title: Fill Bank at Tuen Mun Area 38
Conditions Imposed under Section 5(12) of the
Ordinance
for Permission to Apply Directly for
Environmental Permit
1.
All
measures described in the Project Profile submitted by the Applicant on 4
December 2002, together with those requirements mentioned in the following
conditions, shall be fully implemented.
2.
Hoarding
of at least 2.4m high shall be erected along the site boundary along Lung Mun
Road and adjacent to the River Trade Terminal, except at the site
entrance/exit. Hoarding of at least 2.4m high shall also be erected along the
western boundary adjacent to the Recovery Park of the fill bank before
occupation takes place at the Recovery Park.
3.
Main
haul roads shall be covered with concrete, bituminous materials, hardcores or
metal plates.
4.
Both
paved and unpaved roads within the project site shall be watered every 2 hours
so as to maintain the entire road surface wet during operation of the project.
5.
Tipping
halls at the seafront provided for transfer of public fill from trucks to
barges shall be of enclosed design with top and 3-sides enclosed to prevent spillage
of material into the water body.
6.
A
buffer zone of at least 20m shall be maintained between the public fill
stockpiling area of the fill bank and the site boundary next to the Container Freight
Station at River Trade Terminal, and Recovery Park Phase I and Phase II. Within
the buffer zone, stockpiling of material and loading / unloading activities are
prohibited.
7.
An
area of 100m x 100m in the north-eastern corner of the stockpiling area (Figure
1) shall be managed as a ˇ§truckload control zoneˇ¨. No more than 64 vehicle-trip
per hour, and 633 vehicle-trip per day shall be travelled to the control zone.
8.
Vehicle
travelling within the site shall not exceed a speed of 10 km per hour.
9.
All
belt conveyor systems used on-site shall be enclosed on top and 2 sides and
equipped with bottom plates to prevent spillage of material. Every transfer
point between two conveyors shall be totally enclosed. The vertical distance
between connecting belt conveyors and the material landing point shall be no
more than 1m.
10.
Hydroseeding
or earthy coloured geo-textile matting (e.g. green / grey / brown) shall be
provided on the slopes of the fill bank along the eastern, northern and western
sides as the slopes of each layer of platform are formed.
11.
A ˇ§Drainage
Layout Planˇ¨ shall be submitted to EPD for review and agreement before the
commencement of construction work.
Note
Under Section 17 of the EIA Ordinance, the Applicant may
appeal to the Appeal Board against any of the above conditions within 30 days
of the receipt of this notice of the Directorˇ¦s decision.
Environmental Protection Department
January 2003