Environmental
Impact Assessment (EIA) Ordinance, Cap. 499
Project Title : Water Reclamation Facilities for
Yuen Long, Sai Kung and
1.
All
measures described in the Project Profile (No. PP-390/2009) submitted by the Applicant on 24 June 2009 shall be fully implemented;
2. The reclaimed water quality of
this Project shall meet the requirements set out in Table 1 below.
Table 1: Reclaimed Water Quality
Water quality parameter |
Unit |
Reclaimed Water Quality of this Project |
||||
Make-up water |
Ground and facility washing |
Toilet flushing |
Polymer preparation |
Landscape irrigation |
||
pH |
- |
6-9 |
6-9 |
6-9 |
6.2-8.3 |
6-9 |
Colour |
HU |
N.S. |
N.S. |
N.S. |
< 20 |
N.S. |
Turbidity |
NTU |
¡Ø 2 |
¡Ø 2 |
¡Ø 2 |
¡Ø 2 |
¡Ø 2 |
Total Suspended Solids (TSS) |
mg/L |
¡Ø 10 |
¡Ø 10 |
¡Ø 10 |
¡Ø 5 |
¡Ø 10 |
Biochemical Oxygen Demand (BOD5) |
mg/L |
¡Ø 10 |
¡Ø 10 |
¡Ø 10 |
¡Ø 10 |
¡Ø 10 |
E. Coli |
No./100mL |
Not Detectable |
Not Detectable |
Not Detectable |
Not Detectable |
Not Detectable |
Total Residual Chlorine (TRC) |
mg/L |
¡Ù 1 |
¡Ù 1 |
¡Ù 1 |
N.S. |
¡Ø 1 |
Total Dissolved Solids (TDS) |
mg/L |
N.S. |
N.S. |
N.S. |
< 200 |
N.S. |
3. Surplus reclaimed water shall be
directed back to the sewage treatment works.
Note
Under Section 17 of the EIA
Ordinance, the Applicant may appeal to the Appeal Board against any of the
above conditions within 30 days of the receipt of this notice of the Director¡¦s
decision.
Environmental Protection
Department
July 2009