Environmental Permit No. EP-326/2009
Àô¹Ò³\¥iÃÒ½s¸¹No. EP-326/2009
ENVIRONMENTAL IMPACT ASSESSMENT
ORDINANCE
(CHAPTER 499)
Section 10
Àô¹Ò¼vÅTµû¦ô±ø¨Ò
(²Ä499³¹)
²Ä 10 ±ø
ENVIRONMENTAL PERMIT TO CONSTRUCT
AND OPERATE
A DESIGNATED PROJECT
«Ø³y¤ÎÀç¿ì«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ
A³¡(³\¥iÃÒ¥Dn³¡¤À)
Pursuant to Section 10 of the Environmental Impact Assessment Ordinance
(EIAO), the Director of Environmental Protection (the Director) grants this
environmental permit to the Hutchison Telephone Company Limited (hereinafter referred to as the "Permit Holder") to construct
and operate the designated project described in Part B subject to the
conditions specified in Part C. The issue of this environmental permit is based
on the documents, approvals or permissions described below:
®Ú¾Ú¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò)²Ä10±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø(¸pªø)±N¥»Àô¹Ò³\¥iÃҧ天©M°O¹q°T¦³¤½¥q(¤UºÙ¡¨³\¥iÃÒ«ù¦³¤H¡¨)¡A¥H«Ø³y¤ÎÀç¿ìB³¡©Ò»¡©úªº«ü¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦uC³¡©Ò¦C©úªº±ø¥ó¡C¥»Àô¹Ò³\¥iÃÒ¬O¨Ì¾Ú¤U¦C¤å¥ó¡B§åã©Î³\¥i¦Óñµo¡G
|
Application No. ¥Ó½Ð®Ñ½s¸¹¡G |
AEP-326/2008 |
||
|
Document in the
Register: µn°O¥U¤Wªº¤å¥ó¡G |
(1) Project
Profile ¡V ¡§Proposed Installation of (Register
No. PP-370/2008) ¤uµ{¶µ¥Ø²¤¶ ¡V ¡§p¹º©ó¤¸®Ô¤j´Å¤s¤s³»297¸¹¦w¸Ë¬y°Ê¹q¸Ü¦¬µo¯¸¡¨ (µn°O¥U½s¸¹¡GPP-370/2008) (2)
Application for Environmental Permit submitted
by the Permit Holder on ³\¥iÃÒ«ù¦³¤H©ó2008¦~12¤ë22¤é´£¥æªºÀô¹Ò³\¥iÃҥӽР(¥Ó½Ð®Ñ½s¸¹
AEP-326/2008) |
||
|
Director¡¦s
Permission to Apply Directly for Environmental Permit ¸pªøã³\ª½±µ¥Ó½ÐÀô¹Ò³\¥iÃÒ |
Letter Reference : (18) in EP2/N6/Q/122 «H¥óÀɸ¹ : (18) in EP2/N6/Q/122 Date : ¤é´Á : 2008¦~11¤ë27¤é |
||
January 2009 |
|
|
||
Date ¤é´Á |
(WONG Hon-meng) Principal Environmental
Protection Officer (Strategic Assessment) for Director of
Environmental Protection Àô¹Ò«OÅ@¸p¸pªø (º®uÀô¹Ò«OÅ@¥D¥ô(µ¦²¤µû¦ô)¶Àº~©ú¥N¦æ) |
|||
PART B (DESCRIPTIONS OF DESIGNATED PROJECT)
B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)
Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to
as the ¡§Permit¡¨):
¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ(¤UºÙ¡§³\¥iÃÒ¡¨)A³¡ ©Ò´£zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú:
Title of
Designated Project «ü©w¤uµ{¶µ¥Øªº¦WºÙ |
Proposed Installation of p¹º©ó¤¸®Ô¤j´Å¤s¤s³»297¸¹¦w¸Ë¬y°Ê¹q¸Ü¦¬µo¯¸ [This
designated project is hereinafter referred to as ¡§the Project¡¨] [³o«ü©w¤uµ{¶µ¥Ø¤UºÙ¡§¤uµ{¶µ¥Ø¡¨] |
Nature of
Designated Project |
Earthworks and building works
in a conservation area ©ó¦ÛµM«O¨|°Ï¤º¶i¦æ¤g¤ì¤u¨Æ¤Î«Ø¿v¤uµ{ |
Location of
Designated Project «ü©w¤uµ{¶µ¥Øªº¦aÂI |
Tai Tong Hill Top 297, Yuen
Long ¤¸®Ô¤j´Å¤s¤s³»297¸¹ Figure
1 attached to this Permit shows the location of the Project. |
Scale and Scope
of Designated Project(s) «ü©w¤uµ{¶µ¥Øªº³W¼Ò©M½d³ò |
The
Project is to construct and operate a mobile communications radio base station,
which comprises an equipment platform, two antenna poles with the height of about 7.5m and 6.5m, the electricity supply and the
telecommunication lines. ¤uµ{¶µ¥Ø¬°«Ø³y¤ÎÀç¿ì¤@©Ò¬y°Ê¹q¸Ü¦¬µo¯¸¡A¨ä¥]¬A¤@Ó³]³Æ°ò¥x¡B¨â¤ä°ª¬ù7.5¦Ì¤Î6.5¦Ìªº¤Ñ½u±ì¡B¹q¤O¨ÑÀ³¤Î¹q¸Ü½u¡C |
C³¡ (³\¥iÃÒ±ø¥ó)
1.
General Conditions
¤@¯ë±ø¥ó
1.1 The
Permit Holder and any person working on the Project shall comply with all conditions
set out in this Permit. Any non-compliance by any person may constitute a
contravention of the Environmental Impact Assessment Ordinance (Cap. 499) and
may become the subject of appropriate action being taken under the Ordinance.
³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó±q¨Æ¤uµ{¶µ¥Øªº¤H¤h¥²¶·²Å¦X¥»³\¥iÃÒ¸ü¦Cªº¥þ³¡±ø¥ó¡C¥ô¦ó¤H¤h¦p¦³¤£²Å¦X¥»³\¥iÃÒªº±¡ªp¡A¥i¯à¹H¤ÏÀô¹Ò¼vÅTµû¦ô±ø¨Ò(¡uÀôµû±ø¨Ò¡v)(²Ä499³¹)ªº³W©w¡A¦Ó·í§½¥i®Ú¾ÚÀôµû±ø¨Ò±Ä¨ú¾A·í¦æ°Ê¡C
1.2
The Permit Holder shall
ensure full compliance with all legislation from time to time in force
including without limitation to the Noise Control Ordinance (Cap. 400), Air Pollution
Control Ordinance (Cap. 311), Water Pollution Control Ordinance (Cap. 358) and
Waste Disposal Ordinance (Cap. 354). This Permit does not of itself constitute
any ground of defence against any proceedings instituted under any legislation
or imply any approval under any legislation.
³\¥iÃÒ«ù¦³¤H¶·¸g±`½T«O§¹¥þ²Å¦X²{¦æªk¨Òªº³W©w¡A¥]¬A¦ý¤£©ó¾¸µºÞ¨î±ø¨Ò(²Ä400³¹)¡FªÅ®ð¦Ã¬VºÞ¨î±ø¨Ò(²Ä311³¹)¡F¤ô¦Ã¬VºÞ¨î±ø¨Ò(²Ä358³¹)¡F¤Î¼oª«³B¸m±ø¨Ò(²Ä354³¹)¡C¥»³\¥iÃÒ¥»¨¤£·|(a)´N®Ú¾Ú¥ô¦óªk¨Ò´£°_ªºªk«ßµ{§Çºc¦¨¥ô¦ó§ÜÅG²z¥Ñ¡A©Î(b)®Ú¾Ú¥ô¦óªk¨ÒÀq¥Ü¥ô¦ó§åã¡C
1.3
The Permit Holder shall make
copies of this Permit together with all documents referred to in this Permit or
the documents referred to in Part A of the
Permit readily available at all times for inspection by the Director or his
authorised officers at all sites/offices covered by this Permit. Any reference
to the Permit shall include all documents referred to in the Permit and also
the relevant documents in the Register.
³\¥iÃÒ«ù¦³¤H¶·¦L»s¥»³\¥iÃÒªº½Æ¥»¡A³s¦P¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó©Î¥»³\¥iÃÒA³¡©Òz¤å¥ó¡A¥H¨Ñ¸pªø©ÎÀò±ÂÅv¤Hû¥ô¦ó®É¶¡¤º¦b¥»³\¥iÃÒ©Ò²[»\ªº©Ò¦³¤u¦a / ¿ì¨Æ³B¬d¾\¡C¤Z´£z¥»³\¥iÃÒ¡A¶·¥]¬A¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Îµn°O¥U¤ºªº¬ÛÃö¤å¥ó¡C
1.4
The Permit Holder shall give
a copy of this Permit to the person(s) in charge of the site(s) and ensure that
such person(s) fully understands all conditions and all requirements
incorporated by the Permit. The
site(s) refers to site(s) of construction and operation of the Project and
shall mean the same hereafter.
³\¥iÃÒ«ù¦³¤H¶·§â¥»³\¥iÃÒªº½Æ¥»¥æ¤©¦³Ãö¤u¦aªºt³d¤H¡A¨Ã½T«O³o¨Ç¤H¤h§¹¥þ©ú¥Õ¥»³\¥iÃÒªº©Ò¦³±ø¥ó»P³W©w¡C¤u¦a¬O«ü«Ø³y¤ÎÀç¿ì¤uµ{¶µ¥Øªº¤u¦a¡A¤U¤å©Ò´£¤Îªº¤u¦a¥çÄݦP¤@·N«ä¡C
1.5
The Permit Holder shall
display conspicuously a copy of this Permit on the Project site(s) at all
vehicular site entrances/exits or at a convenient location for public
information at all times. The Permit Holder shall ensure that the most updated
information about the Permit, including any amended permit, is displayed at
such locations. If the Permit Holder surrenders a part or the whole of the
Permit, the notice he sends to the Director shall also be displayed at the same
locations as the original Permit. The suspended, varied or cancelled Permit
shall be removed from display at the Project site(s).
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº¤u¦aªº©Ò¦³¨®½ø¶i¥X¤f©Î¤@³B¤è«K¦aÂI¡AÅã²´¦a®i¥Ü¥»³\¥iÃÒªº½Æ¥»¡A¥H¨Ñ¤½²³¦b¥ô¦ó®É¶¡¤º¾\Äý¡C³\¥iÃÒ«ù¦³¤H¶·½T«O¦b³o¨Ç¦aÂI®i¥ÜÃö©ó¥»³\¥iÃÒ(¥]¬A¥ô¦ó¸g×qªº³\¥iÃÒ)ªº³Ì·s¸ê®Æ¡C³\¥iÃÒ«ù¦³¤H¦p¥æ¦^³\¥iÃÒªº³¡¤À©Î¥þ³¡¡A¥²¶·§â¨ä°e¥æ¸pªøªº³qª¾®Ñ¡A¦b³Æ¦³ì¦³³\¥iÃÒªº¬Û¦P¦aÂI®i¥Ü¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Øªº¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
1.6
The Permit Holder shall construct
and operate the Project in accordance with the project descriptions in Part B
of this Permit.
³\¥iÃÒ«ù¦³¤H¶·¨Ì¾Ú¥»³\¥iÃÒB³¡ªº¤uµ{¶µ¥Ø»¡©ú¡A«Ø³y¤ÎÀç¿ì¤uµ{¶µ¥Ø¡C
1.7
The
Permit Holder shall ensure that the Project is designed, constructed and
operated in accordance with the information and recommendations described in
the Project Profile (Register No. PP-370/2008) in the
Register, and the information and mitigation measures described in this Permit.
Where recommendations referred to in the documents of the Register are not
expressly referred to in this Permit, such recommendations are nevertheless to
be implemented unless expressly excluded or impliedly amended in this Permit.
³\¥iÃÒ«ù¦³¤H¶·½T«O¤uµ{¶µ¥Øªº³]p¡B«Ø³y¤ÎÀç¿ì¡A«ö·Ó¤Uz¸ê®Æ¤Î±¹¬I¿ì²z¡Gµn°O¥U¤ºªº¤uµ{¶µ¥Ø²¤¶(µn°O¥U½s¸¹¡GPP-370/2008)©Ò»¡©úªº¸ê®Æ¤Î«Øij¡F¥H¤Î¥»³\¥iÃÒ©Ò»¡©úªº¸ê®Æ¤Î½w¸Ñ±¹¬I¡Cµn°O¥U¤ºªº¤å¥ó©Òz«Øij¦p¨S¦³¦b¥»³\¥iÃÒ©ú½Tªí¥Ü¡A«h¤´¶·¹ê¬I³o¨Ç«Øij¡A°£«DÀò¥»³\¥iÃÒ©ú½TÁÅ°£©ÎÀq¥Ü×q¡C
1.8
The
Permit Holder shall notify the Director in writing the commencement date of
construction of the Project no later than two weeks prior to the commencement
of construction of the Project. The Permit Holder shall notify the Director in
writing immediately if there is any change of the commencement date of the
construction.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦2Ó¬P´Á¥H®Ñ±¤è¦¡§â«Ø³y¤uµ{ªº¬I¤u¤é´Á³qª¾¸pªø¡C¬I¤u¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¥²¶·¥ß§Y¥H®Ñ±¤è¦¡³qª¾¸pªø¡C
1.9
For
the purpose of this Permit, ¡§commencement of construction¡¨ does not include
works related to site clearance and preparation or other works as agreed by the
Director.
¬°°õ¦æ¥»³\¥iÃÒ¡A¡u«Ø³y¤uµ{ªº®i¶}¡v¤£¥]¬A¦³Ãö¤u¦a²M²z¤Î¹w³Æªº¤uµ{¡A©Î¸pªø¦P·Nªº¨ä¥L¤uµ{¡C
2.
Specific Conditions
¯S©w±ø¥ó
2.1
The Permit
Holder shall construct and operatethe Project only at the
location as indicated in Figure 1 of this Permit.
³\¥iÃÒ«ù¦³¤H¥u¥i¦b¥»³\¥iÃÒ¹Ï 1©Ò¥Ü¦aÂI«Ø³y¤ÎÀç¿ì¥»¤uµ{¶µ¥Ø¡C
2.2
No haul road shall be formed for the construction of the
Project. Construction materials, equipments, wastes, surplus excavated
materials and materials alike arising from the Project shall be transported to
and away from the Project site
by the helicopter.
¤£±o¬°«Ø³y¥»¤uµ{¶µ¥Ø·f«Ø¹B®Æ¸ô¡C¤uµ{©Ò»Ýªº«Ø³y§÷®Æ¡B¾¹§÷¤Î¤uµ{¶µ¥Ø²£¥Íªº¼oª«¡B¹L³Ñªº«õ¥Xª«®Æ©ÎÃþ¦üª«®Æ¶·¥Hª½ª@¾÷¹B©¹¤Î·hÂ÷¤u¦a¡C
2.3
No tree shall be felled for the Project.
¤£±o´N¤uµ{¶µ¥Ø¬å¥ï¾ð¤ì¡C
2.4
The antenna poles of the Project shall be painted or coated in ¡§Antique¡¨ (B.S. 10B25 or Pantone 462U) or similar subdue colour to
match with the surrounding environment.
¤uµ{¶µ¥Øªº¤Ñ½u±ì¶·ìp¤W©Î¶î¥H¡§¥j¡¨(B.S. 10B25©Î±m³q(Pantone)462U)¦â¨t©Î¬ÛY¬X©MªºÃC¦â¡A¥H°t¦X©P³òªºÀô¹Ò¡C
Notes :
µù
1. This Permit consists of three parts, namely, PART A (Main Permit), PART
B (Description of Designated Project) and PART C (Permit Conditions). Any
person relying on this Permit should obtain independent legal advice on the
legal implications under the Ordinance, and the following notes are for general
information only.
¥»³\¥iÃÒ¦@¦³3³¡¡A§YA³¡(³\¥iÃÒ¥Dn³¡¤À)¡FB³¡(«ü©w¤uµ{¶µ¥Øªº»¡©ú)¤ÎC³¡(³\¥iÃÒ±ø¥ó)¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´NÀôµû±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤Uzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C
2. If there is a breach of any conditions of this Permit, the Director or
his authorized officer may, with the consent of the Secretary for the
Environment, order the cessation of associated work until the remedial action
is taken in respect of the resultant environmental damage, and in that case the
Permit Holder shall not carry out any associated works without the permission
of the Director or his authorized officer.
¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤Hû¥i¦bÀô¹Ò§½§½ªøªº¦P·N¤U°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤Hû¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C
3. The Permit Holder may apply under Section 13 of the Ordinance to the
Director for a variation of the conditions of this Permit. The Permit Holder
shall replace the original permit displayed on the construction site by the
amended permit.
³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀôµû±ø¨Ò(¸Ó¡u±ø¨Ò¡v)²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·¥H¸g×qªº³\¥iÃÒ´À´«¦b¤uµ{¶µ¥Øªº¤u¦a¤º®i¥Üªºì¦³³\¥iÃÒ¡C
4. A person who assumes the responsibility for the whole or a part of the
designated project may, before he assumes responsibility of the designated
project, apply under Section 12 of the Ordinance to the Director for a further
environmental permit.
©Ó¾á¤uµ{¶µ¥Ø¾ã¶µ©Î³¡¤À¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á³d¥ô¤§«e¡A¥i®Ú¾Ú¸Ó±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C
5. Under Section 14 of the Ordinance, the Director may with the consent of
the Secretary for the Environment, suspend, vary or cancel this Permit. The
suspended, varied or cancelled Permit shall be removed from display at the
construction site.
®Ú¾Ú¸Ó±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦bÀô¹Ò§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®ø¥»³\¥iÃÒ¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªºÀô¹Ò³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Øªº¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
6.
If this Permit
is cancelled or surrendered during construction of the Project, another
environmental permit must be obtained under the Ordinance before the
construction or operation of the Project could be continued. It is an offence
under Section 26(1) of the Ordinance to construct or operate a designated
project listed in Part I of Schedule 2 of the Ordinance without a valid
environmental permit.
¦p¥»³\¥iÃÒ¦b¤uµ{¶µ¥Ø«Ø³y´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~Äò¶i¦æ¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾Ú¸Ó±ø¨Ò³W©w¨ú±o¥t¤@¥÷Àô¹Ò³\¥iÃÒ¡C®Ú¾Ú¸Ó±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³¦³®ÄÀô¹Ò³\¥iÃÒªº±¡ªp¤U«Ø³y©ÎÀç¿ì¸Ó±ø¨Òªþªí2©Ò¦C©úªº«ü©w¤uµ{¶µ¥Ø¡A§YÄݹHªk¡C
7. Any person who constructs or operates the
Project contrary to the conditions in the Permit, and is convicted of an
offence under the Ordinance, is liable: -
¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤U«Ø³y©ÎÀç¿ì¤uµ{¶µ¥Ø¡A®Ú¾Ú¸Ó±ø¨Ò¡A§YÄݹHªk¡G
(i)
on
a first conviction on indictment to a fine of $2 million and to imprisonment
for 6 months;
¤@¸g´`¤½¶Dµ{§Çº¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6Ó¤ë¡F
(ii)
on
a second or subsequent conviction on indictment to a fine of $5 million and to
imprisonment for 2 years;
¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F
(iii)
on
a first summary conviction to a fine at level 6 and to imprisonment for 6
months;
¤@¸g´`²©öµ{§Çº¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6Ó¤ë¡F
(iv)
on
a second or subsequent summary conviction to a fine of $1 million and to imprisonment
for 1 year; and
¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¥H¤Î
(v)
in
any case where the offence is of a continuing nature, the court or magistrate
may impose a fine of $10,000 for each day on which he is satisfied the offence
continued.
¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄݳsÄò©Ê½è¡Aªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ³sÄòªº¨C¤@¤Ñ¥t³B»@´Ú10,000¤¸¡C
8. The Permit Holder may appeal against any condition of this Permit under
Section 17 of the Ordinance within 30 days of receipt of this Permit.
³\¥iÃÒ«ù¦³¤H¥i¦b±µÀò¥»³\¥iÃÒ«á30¤Ñ¤º¡A®Ú¾Ú¸Ó±ø¨Ò²Ä17±ø´N¥»³\¥iÃÒªº¥ô¦ó±ø¥ó´£¥X¤W¶D¡C
9. The Notes are for general reference only and that the Permit Holder
should refer to the EIA Ordinance for details and seek independent legal
advice.