Environmental Permit No. EP-464/2013

Àô¹Ò³\¥iÃÒ½s¸¹No. EP-464/2013 

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE

(CHAPTER 499)

SECTION 10

 

Àô¹Ò¼vÅTµû¦ô±ø¨Ò

(²Ä499³¹)

²Ä10±ø

 

ENVIRONMENTAL PERMIT TO CONSTRUCT AND OPERATE

A DESIGNATED PROJECT

«Ø³y¤ÎÀç¿ì«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ

 

 

PART A (MAIN PERMIT)

A³¡ (³\¥iÃÒ¥D­n³¡¤À)

 

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (the EIAO), the Director of Environmental Protection (the Director) grants this Environmental Permit to Drainage Services Department (hereinafter referred to as the ¡§Permit Holder¡¨) to construct and operate the designated project described in Part B subject to the conditions described in or attached to Part C. The issue of this Environmental Permit is based on the documents, approvals or permissions described below:

 

®Ú¾ÚÀô¹Ò¼vÅTµû¦ô±ø¨Ò²Ä10±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø(¸pªø)±N¥»Àô¹Ò³\¥iÃҧ天´ë°È¸p (¤UºÙ¡§³\¥iÃÒ«ù¦³¤H¡¨) ¥H«Ø³y¤ÎÀç¿ìB³¡©Ò»¡©úªº«ü©w¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦uC³¡©Ò¦C©úªº±ø¥ó¡C¥»Àô¹Ò³\¥iÃÒªºµo¥X¡A¤D¥H¤Uªí©Ò¦Cªº¤å¥ó¡B§å­ã©Î³\¥i§@¬°®Ú¾Ú¡G

 

 

Application No.

¥Ó½Ð®Ñ½s¸¹¡G

 

 

AEP-464/2013

 

 

 

 

Document in the Register:

µn°O¥U¤Wªº¤å¥ó¡G

 

 

(1) Upgrading and expansion of San Wai Sewage Treatment Works and expansion of Ha Tsuen Pumping Station:

Environmental Impact Assessment (EIA) Report

Executive Summary

Environmental Monitoring and Audit (EM&A) Manual

(Register No. AEIAR-072/2003) [hereinafter referred to as the "EIA Report"]

 

·s³ò¦Ã¤ô³B²z¼t§ïµ½©MÂX«Ø¤Î·H§ø¦Ã¤ô¬¦©ÐÂX«Ø:

Àô¹Ò¼vÅTµû¦ô³ø§i

Àôµû¦æ¬FºK­n

Àô¹ÒºÊ¹î¤Î¼f®Ö­p¹º

(µn°O¥U½s¸¹¡GAEIAR-072/2003) [¤UºÙ¡uÀôµû³ø§i¡v

 

(2)    The Director¡¦s letter of approval of the EIA report dated 12 May 2003 in (18) in EP2/N6/F/32 Ax(7) Part IV

 

¸pªø©ó2003¦~5¤ë12¤éµo¥X¸ÓÀôµû³ø§iªº§å­ã«H¡AÀÉ®×½s¸¹ (18) in EP2/N6/F/32 Ax(7) Part IV

 

 

 

 

 

(3)  Application documents including all attachments for Environmental Permit received on 23 September 2013 (Application No.   AEP-464/2013)

 

©ó2013¦~9¤ë23±µ¦¬ªºÀô¹Ò³\¥iÃҥӽФδ£¥æªº©Ò¦³ªþ¥ó (¥Ó½Ð®Ñ½s¸¹ AEP-464/2013) [¤UºÙ ¡u¥Ó½Ð®Ñ¡v

 

 

 

 

 

 

 

 

    18 October 2013

 

 

 

 

Date

¤é´Á

 

(WONG Hon-meng)

Principal Environmental Protection Officer

(Strategic Assessment)

for Director of Environmental Protection

Àô¹Ò«OÅ@¸p¸pªø

­º®uÀô¹Ò«OÅ@¥D¥ô(µ¦²¤µû¦ô)¶Àº~©ú¥N¦æ

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

PART B (DESCRIPTIONS OF DESIGNATED PROJECT)

B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)

 

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as the ¡§Permit¡¨):

¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ(¤UºÙ ¡§³\¥iÃÒ¡¨)A³¡ ©Ò´£­zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú:

 

 

Title of Designated Projects

«ü©w¤uµ{¶µ¥Øªº¦WºÙ

 

 

Upgrading of San Wai Sewage Treatment Works (Phase 1)[this is referred hereafter as ¡§the Project¡¨]

 

·s³ò¦Ã¤ô³B²z¼t§ïµ½¤uµ{(²Ä¤@´Á) [¥»«ü©w¤uµ{¶µ¥Ø¤UºÙ¡u¤uµ{¶µ¥Ø¡v]

  

 

Nature of Designated Projects

«ü©w¤uµ{¶µ¥Øªº©Ê½è

 

 

Construction and Operation of a Sewage Treatment Works with an installed capacity of more than 15,000m3 per day.

 

¸Ë¸m¤ÎÀç¿ì¦Ã¤ô³B²z¯à¤O¶W¹L¨C¤Ñ15,000¥ß¤è¦Ìªº¦Ã¤ô³B²z¼t¡C

 

 

Location of Designated Project

«ü©w¤uµ{¶µ¥Øªº¦aÂI

 

North of the existing San Wai Sewage Treatment Works in Yuen Long. (The Location of the Project is shown in Figure 1 of this Permit.)

 

²{¦³¤¸®Ô·s³ò¦Ã¤ô³B²z¼t¤§¥_­±¡C

(¤uµ{¶µ¥Øªº¦aÂI¸ü©óÀô¹Ò³\¥iÃÒ ¹Ï1¡C)

 

 

Scale and Scope of Designated Project(s)

«ü©w¤uµ{¶µ¥Øªº³W¼Ò©M½d³ò

 

 

Expanding the treatment capacity of the existing San Wai Sewage Treatment Works to 200,000m3 per day and upgrading the sewage treatment level of the existing sewage treatment works to incorporate chemical treatment with disinfection.

 

ÂX«Ø²{¦³·s³ò¦Ã¤ô³B²z¼tªº³B²z®e¶q¦Ü¨C¤Ñ200,000¥ß¤è¦Ì¤Î³z¹L¥[¤J¤Æ¾Ç³B²z©M®ø¬r³]¬I§ï¶i²{¦³¦Ã¤ô³B²z¼tªº¦Ã¤ô³B²z¤ô¥­¡C

 

 

 


 

PART C (PERMIT CONDITIONS)

C³¡     (³\¥iÃÒ±ø¥ó)

 

1.          General Conditions

            ¤@¯ë±ø¥ó

 

1.1        The Permit Holder and any person working on the Project shall comply with all conditions set out in this Permit. Any non-compliance by any person may constitute a contravention of the Environmental Impact Assessment (EIA) Ordinance (Cap.499) and may become the subject of appropriate action being taken under the Ordinance.

³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó±q¨Æ¤uµ{¶µ¥Øªº¤H¤h¥²¶·§¹¥þ²Å¦X¥»³\¥iÃÒ¸ü¦Cªº¥þ³¡±ø¥ó¡C¥ô¦ó¤H¤h¦p¦³¤£²Å¦X¥»³\¥iÃÒªº±¡ªp¡A¥i¯à¹H¤Ï¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n¡]Àôµû±ø¨Ò¡^¡]²Ä499³¹¡^ªº³W©w¡A¦Ó·í§½¥i®Ú¾ÚÀôµû±ø¨Ò±Ä¨ú¾A·í¦æ°Ê¡C

 

1.2        The Permit Holder shall ensure full compliance with all legislation from time to time in force including without limitation to the Noise Control Ordinance (Cap.400), Air Pollution Control Ordinance (Cap.311), Water Pollution Control Ordinance (Cap.358) and Waste Disposal Ordinance (Cap.354). This Permit does not of itself (a) constitute any ground of defence against any proceedings instituted under any legislation or (b) imply any approval under any legislation.

³\¥iÃÒ«ù¦³¤H¶·¸g±`½T«O§¹¥þ²Å¦X²{¦æªk¨Òªº³W©w¡A¥]¬A¦ý¤£­­©ó¡m¾¸­µºÞ¨î±ø¨Ò¡n¡]²Ä400³¹¡^¡BªÅ®ð¦Ã¬VºÞ¨î±ø¨Ò¡n¡]²Ä311³¹¡^¡B¡m¤ô¦Ã¬VºÞ¨î±ø¨Ò ¡n¡]²Ä358³¹¡^¡B¤Î¡m¼oª«³B¸m±ø¨Ò¡n¡]²Ä354 ³¹¡^¡C  ¥»³\¥iÃÒ¥»¨­¤£·|´N(¥Ò)®Ú¾Ú¥ô¦óªk¨Ò´£°_ªºªk«ßµ{§Çºc¦¨¥ô¦ó§ÜÅG²z¥Ñ¡A©Î(¤A)®Ú¾Ú¥ô¦óªk¨ÒÀq¥Ü¥ô¦ó§å­ã¡C

 

1.3        The Permit Holder shall make copies of this Permit together with all documents referred to in this Permit or the documents referred to in Part A of the Permit readily available at all times for inspection by the Director or his authorized officers at all sites/offices covered by this Permit. Any reference to the Permit shall include all documents referred to in the Permit and also the relevant documents in the EIA Ordinance Register Office.

³\¥iÃÒ«ù¦³¤H¶·¦L»s¥»³\¥iÃÒªº½Æ¥»¡A³s¦P¥»³\¥iÃÒ©Ò­zªº©Ò¦³¤å¥ó©Î¥»³\¥iÃÒ A³¡ ©Ò­z¤å¥ó¡A¥H¨Ñ¸pªø©ÎÀò±ÂÅv¤H­û¥ô¦ó®É¶¡¤º¦b¥»³\¥iÃÒ©Ò²[»\ªº©Ò¦³¤u¦a / ¿ì¨Æ³B¬d¾\¡C¤Z´£­z¥»³\¥iÃÒ¡A¶·¥]¬A¥»³\¥iÃÒ©Ò­zªº©Ò¦³¤å¥ó¤Îµn°O¥U¤ºªº¬ÛÃö¤å¥ó¡C

 

1.4        The Permit Holder shall give a copy of this Permit to the person(s) in charge of the Project site(s) and ensure that such person(s) fully understands all conditions and all requirements incorporated by the Permit. The site(s) refers to site(s) of construction and / or operation of the Project and shall mean the same hereafter.

³\¥iÃÒ«ù¦³¤H¶·§â¥»³\¥iÃÒªº¤@¥÷½Æ¥»¥æ¤©¦³Ãö¤u¦aªº­t³d¤H¡A¨Ã½T«O³o¨Ç¤H¤h§¹¥þ©ú¥Õ¥»³\¥iÃÒªº©Ò¦³±ø¥ó»P³W©w¡C¤u¦a¬O«ü«Ø³y¤ÎÀç¿ì¤uµ{¶µ¥Øªº¤u¦a¡A¤U¤å©Ò´£¤Îªº¤u¦a¥çÄݦP¤@·N«ä¡C

 

1.5       The Permit Holder shall display conspicuously a copy of this Permit on the construction site(s) at all vehicular site entrances/exits or at a convenient location for public information at all times. The Permit Holder shall ensure that the most updated information about the Permit, including any amended permit, is displayed at such locations. If the Permit Holder surrenders a part or the whole of the Permit, the notice he sends to the Director shall also be displayed at the same locations as the original Permit. The suspended, varied or cancelled Permit shall be removed from display at the construction site(s).

³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø¤u¦aªº©Ò¦³¨®½ø¶i¥X¤f©Î¤@³B¤è«K¦aÂI¡AÅã²´¦a®i¥Ü¥»³\¥iÃÒªº½Æ¥»¡A¥H¨Ñ¤½²³¦b¥ô¦ó®É¶¡¤º¾\Äý¡C³\¥iÃÒ«ù¦³¤H¶·½T«O¦b³o¨Ç¦aÂI®i¥ÜÃö©ó¥»³\¥iÃÒ¡]¥]¬A¥ô¦ó¸g­×­qªº³\¥iÃÒ¡^ªº³Ì·s¸ê®Æ¡C³\¥iÃÒ«ù¦³¤H¦p¥æ¦^³\¥iÃÒªº³¡¤À©Î¥þ³¡¡A¥²¶·§â¨ä°e¥æ¸pªøªº³qª¾®Ñ¡A¦b³Æ¦³­ì¦³³\¥iÃÒªº¦U³B¬Û¦P¦aÂI®i¥Ü¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C

 

 

1.6     The Permit Holder shall construct and operate the Project as described in Part B of this Permit.

³\¥iÃÒ«ù¦³¤H¶·¨Ì¾Ú¥»³\¥iÃÒ B³¡ ªº¤uµ{¶µ¥Ø»¡©ú¡A«Ø³y¤ÎÀç¿ì¤uµ{¶µ¥Ø¡C

 

1.7      The Permit Holder shall ensure that the Project is designed, constructed and operated in accordance with the information and recommendations described in the EIA Report (Register no. AEIAR-072/2003); other relevant documents in the Register; and the information or mitigation measures described in this Permit, or mitigation measures to be recommended in submissions that shall be deposited with or approved by the Director as a result of permit conditions contained in this Permit; or mitigation measures to be recommended under on-going surveillance and monitoring activities during all stages of the Project. Where recommendations referred to in the documents of the Register are not expressly referred to in this Permit, such recommendations are nevertheless to be implemented unless expressly excluded or impliedly amended in this Permit.

³\¥iÃÒ«ù¦³¤H¶·½T«O¤uµ{¶µ¥Øªº³]­p¡B«Ø³y¤ÎÀç¿ì¡A«ö·Ó¤U­z¸ê®Æ¤Î±¹¬I¿ì²z¡GÀôµû³ø§i¡]µn°O¥U½s¸¹¡GAEIAR-072/2003¡^©Ò»¡©úªº¸ê®Æ¤Î¦U¶µ«Øij¡F¦s©ñ¦bÀô¹Ò¼vÅTµû¦ô±ø¨Òµn°O¥U¿ì¨Æ³B¥Ñ¸pªøµo¥XªºÀôµû³ø§i­ã³\¡F¥»³\¥iÃÒ©Ò»¡©úªº¸ê®Æ©Î½w¸Ñ±¹¬I¡F®Ú¾Ú¥»³\¥iÃÒ¤º¸üªº±ø¥ó¶·¦V¸pªø¦s©ñªº´£¥æ¤å¥ó©Ò«Øijªº½w¸Ñ±¹¬I¡F¥H¤Î¦b¤uµ{¶µ¥Ø¦U¶¥¬q¶i¦æªº«ùÄòºÊ¹î¤ÎºÊ´ú¤u§@©Ò«Øijªº½w¸Ñ±¹¬I¡Cµn°O¥U¤å¥ó©Ò­z«Øij¦p¨S¦³¦b¥»³\¥iÃÒ©ú½Tªí¥Ü¡A«h¤´¶·¹ê¬I³o¨Ç«Øij¡A°£«DÀò¥»³\¥iÃÒ©ú½TÁÅ°£©ÎÀq¥Ü­×­q¡C

 

1.8      All deposited submissions, as required under this Permit, shall be rectified in accordance with the comments, if any made by the Director within one month of the receipt of the Director's comments or otherwise specified by the Director.

©Ò¦³«ö¥»³\¥iÃÒ³W©w¦s©ñªº´£¥æ¤å¥ó¡A¶·¦b±µÀò¸pªøªº·N¨£¡]¦p¦³ªÌ¡^«á1­Ó¤ë¤º¡]°£«D¸pªø¥t¦æ«ü©w¡^¡A®Ú¾Ú¸pªøªº·N¨£¥[¥H­×¥¿¡C

 

1.9      All submissions approved by the Director, all submissions deposited without comments by the Director, and all submissions rectified in accordance with comments by the Director under this Permit shall be construed as part of the permit conditions described in Part C of this Permit. Any variation of the submissions shall be approved by the Director in writing or as prescribed in the relevant permit conditions. Any non-compliance with the submissions may constitute a contravention of the Environmental Impact Assessment Ordinance (Cap.499). All submissions or any variation of the submissions shall be certified by the Environmental Team (ET) Leader and verified by the Independent Environmental Checker (IEC) referred to in Conditions 2.1 and 2.2 below, before submitting to the Director under the Permit.

¸pªø§å­ãªº©Ò¦³´£¥æ¤å¥ó¡B¸pªø¨S¦³µ¹¤©·N¨£ªº©Ò¦³¦s©ñ¤å¥ó¡B©Î®Ú¾Ú¥»³\¥iÃÒ³W©w¥Ñ¸pªøµ¹¤©·N¨£­×¥¿ªº©Ò¦³´£¥æ¤å¥ó¡A§¡¶·¸àÄÀ¬°¥»³\¥iÃÒC³¡ »¡©úªº³\¥iÃÒ±ø¥óªº¤@³¡¤À¡C´£¥æ¤å¥ó¦p¦³¥ô¦ó­×­q¡A§¡¶·Àò¸pªøªº®Ñ­±§å­ã¡A©Î²Å¦X¦³Ãö³\¥iÃÒ±ø¥ó­q©úªº³W©w¡C¦p¦³¤£²Å¦X´£¥æ¤å¥óªº±¡ªp¡A¥i¯à¹H¤ÏÀôµû±ø¨Ò¡]²Ä499³¹¡^ªº³W©w¡C©Ò¦³´£¥æ¤å¥ó©Î´£¥æ¤å¥óªº¥ô¦ó­×­q¥»¡A§¡¶·¥Ñ¤U¤å±ø¥ó²Ä2.1¤Î2.2¶µ©Ò­zÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AµM«á¤~«ö¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æ¡C

 

1.10    The Permit Holder shall release all finalized submissions as required under this Permit, to the public by depositing copies in the Environmental Impact Assessment Ordinance Register Office, or in any other places, or any internet websites as specified by the Director for public inspection. For this purpose, the Permit Holder shall provide sufficient copies of the submissions.

³\¥iÃÒ«ù¦³¤H¶·§â©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w½Z¤½¶}µ¹¤½²³¤H¤hª¾¹D¡A¤èªk¬O§â¦³Ãö¤å¥ó½Æ¥»¦s©ñ©óÀô¹Ò¼vÅTµû¦ô±ø¨Òµn°O¥U¿ì¨Æ³B¡A©Î¸pªø«ü©wªº¥ô¦ó¨ä¥L¦a¤è¡A©Î¸pªø«ü©wªº¥ô¦ó¤¬Ápºôºô¯¸¡A©Î±Ä¨ú¸pªø«ü©wªº¥ô¦ó¤èªk¡A¥H¨Ñ¤½²³¬d¾\¡C¦]¦¹¡A³\¥iÃÒ«ù¦³¤H¶·´£¨Ñ¨¬°÷¼Æ¶qªº½Æ¥»¡C

 

 

 

 

1.11    All submissions to the Director required under this Permit shall be delivered either in person or by registered mail to the Environmental Impact Assessment Ordinance Register Office (currently at 27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong). Electronic copies of all finalized submissions required under this Permit shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF version 4.0 or later), unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies.

¥»³\¥iÃÒ³W©w¦V¸pªø´£¥æªº©Ò¦³¤å¥ó¡A¶·¿Ë¨­°e¥æ©Î¥H±¾¸¹¤è¦¡¶l±H¦ÜÀô¹Ò¼vÅTµû¦ô±ø¨Òµn°O¥U¿ì¨Æ³B¡]²{§}¬°¡G­»´äÆW¥J°a¥§¸Ö¹D130¸¹­×¹y¤¤¤ß27¼Ó¡^¡C©Ò¦³«ö¥»³\¥iÃÒ³W©w´£¥æªº¤å¥ó©w

½Zªº¹q¤lª©¥»¡A§¡¶·¥H¶W¤å¥»¼Ð¥Ü»y¨¥¡]HTML¡^¡]²Ä4.0©Î¸û«áª©¥»¡^©M«KÄ⦡¤å¥ó®æ¦¡¡]PDF¡^¡]²Ä4.0©Î¸û«áª©¥»¡^»s§@¡A°£«D¥tÀò¸pªø¦P·N¡A¨Ã¶·»Pµw½Æ¥»¦P®É´£¥æ¡C

 

1.12    The Permit Holder shall notify the Director in writing the commencement date of the construction of the Project no later than one month prior to the commencement of the construction of the Project. The Permit Holder shall notify the Director in writing immediately if there is any change of the commencement date of the construction.

³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A¦Ü¤Ö´£¦­1­Ó¤ë¥H®Ñ­±¤è¦¡§â«Ø³y¤uµ{ªº¬I¤u¤é´Á³qª¾¸pªø¡C¬I¤u¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¥²¶·¥ß§Y¥H®Ñ­±¤è¦¡³qª¾¸pªø¡C

 

1.13    For the purpose of this Permit, ¡§commencement of construction¡¨ does not include works related to site clearance and preparation or other works as agreed by the Director.

           ¬°°õ¦æ¥»³\¥iÃÒ¡A¡u«Ø³y¤uµ{ªº®i¶}¡v¤£¥]¬A¦³Ãö¤u¦a²M²z©M¹w³Æªº¤uµ{¡A©Î¸pªø¦P·Nªº¨ä¥L¤uµ{¡C

 

2.        Submissions or Measures before Commencement of the Construction of the Project

        ¤uµ{¶µ¥Ø«Ø³y¤uµ{®i¶}«e¶·´£¥æªº¤å¥ó©Î¶·±Ä¨úªº±¹¬I

 

Employment of Environmental and Audit (EM&A) Personnel

¸u¥ÎÀô¹ÒºÊ¹î¤Î¼f®Ö¡]ÀôºÊ¡^¤H­û

 

2.1      An Environmental Team (ET) shall be established by the Permit Holder no later than one month before the commencement of construction of the Project. The ET shall not be in any way an associated body of the Contractor or the Independent Environmental Checker (IEC) for the Project. The ET shall be headed by an ET Leader. The ET leader shall be a person who has at least 7 years of experience in environmental monitoring and auditing (EM&A) or environmental management. The ET and the ET Leader shall be responsible for the implementation of the EM&A programme in accordance with the EM&A requirements as contained in the EM&A Manual of the Project. The ET Leader shall keep a contemporaneous log-book of each and every instance or circumstance or change of circumstances, which may affect the compliance with the recommendations of the EIA Report (Register No. AEIAR-072/2003) and this Permit. The ET Leader shall notify the IEC within one working day of the occurrence of any such instance or circumstance or change of circumstances. The ET Leader¡¦s log-book shall be kept readily available for inspection by all persons assisting in supervision of the implementation of the recommendations of the EIA Report (Register No. AEIAR-072/2003) and this Permit or by the Director or his authorized officers. Failure to maintain records in the log-book, failure to discharge the duties of the ET Leader as defined in the EM&A Manual or failure to comply with this Condition would entitle the Director to require the Permit Holder by notice in writing to replace the ET Leader. Failure by the Permit Holder to make replacement, or further failure to keep contemporaneous records in the log-book despite the employment of a new ET Leader may render the Permit liable to suspension, cancellation or variation.

¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A³\¥iÃÒ«ù¦³¤H¶·¦Ü¤Ö´£¦­1­Ó¤ë¦¨¥ß¤@­ÓÀô¹Ò¤p²Õ¡CÀô¹Ò¤p²Õ¤£±o»P¤uµ{¶µ¥Øªº©Ó¿ì°Ó©Î¿W¥ßÀô¹Ò¬d®Ö¤H¦³¥ô¦óÁpô¡CÀô¹Ò¤p²Õ¶·¥Ñ¤@¦WÀô¹Ò¤p²Õ²Õªø±a»â¡CÀô

¹Ò¤p²Õ²Õªø¶·¦bÀô¹ÒºÊ¹î¤Î¼f®Ö (¡uÀôºÊ¡v) ©ÎÀô¹ÒºÞ²z¤è­±¦Ü¤Ö¦³7¦~¸gÅç¡CÀô¹Ò¤p²Õ¤ÎÀô¹Ò

 

 

¤p²Õ²Õªø¶·«ö¤uµ{¶µ¥ØªºÀôºÊ¤â¥U¤º¸üªºÀôºÊ³W©w¡A°õ¦æÀôºÊ­p¹º¡CÀô¹Ò¤p²Õ²Õªø¶·«O¦s¤@¥»°O

¿ý¥U¡A¦P®É°O¸ü¥i¯à·|¼vÅTÀôµû³ø§i (µn°O¥U½s¸¹¡GAEIAR-072/2003) ªº«Øij¤Î¥»³\¥iÃÒªº²Å¦X±¡ªpªº¨C©v¨Æ¥ó¡B¨CºØ±¡ªp©Î¨C¦¸±¡ªpÅܤơCÀô¹Ò¤p²Õ²Õªø¶·¦bµo¥Í¥ô¦óÃþ¦ü¨Æ¥ó¡B±¡ªp©Î±¡ªpÅܤƫá1­Ó¤u§@¤Ñ¤º³qª¾¿W¥ßÀô¹Ò¬d®Ö¤H¡C¦s©ñÀô¹Ò¤p²Õ²Õªøªº°O¿ý¥Uªº¦a¤è¡A¶·¥i¨Ñ¨ó§U·þ¾É°õ¦æÀôµû³ø§i (µn°O¥U½s¸¹¡GAEIAR-072/2003) ªº«Øij¤Î¥»³\¥iÃÒªº©Ò¦³¤H¤h¡B¸pªø©ÎÀò±ÂÅv¤H­ûÀH®É¬d¾\¡CÀô¹Ò¤p²Õ²Õªø¦p¥¼¯à¦b°O¿ý¥U«O¦s°O¿ý¡B¥¼¯à°õ¦æÀôºÊ¤â¥U©Ò¦C©úªºÀô¹Ò¤p²Õ²Õªø¾°È©Î¥¼¯à²Å¦X¥»±ø¥óªº³W©w¡A¸pªø¦³Åv¥H®Ñ­±­n¨D³\¥iÃÒ«ù¦³¤HºM´«Àô¹Ò¤p²Õ²Õªø¡C³\¥iÃÒ«ù¦³¤H¦p¥¼¯à¦w±Æ¤H¿ï´À¸É¡A©Î¦b¸u¥Î·sÀô¹Ò¤p²Õ²Õªø«á¤´¥¼¯à¦b°O¿ý¥U«O¦s¦P´Áªº°O¿ý¡A©Î·|¾É­P³\¥iÃÒ¾D¼È®É¦Q¾P¡B¨ú®ø©Î§ó§ï¡C

 

 

2.2      An Independent Environmental Checker (IEC) shall be employed by the Permit Holder no later than one month before commencement of construction of the Project. The IEC shall not be in any way an associated body of the Contractor or the ET for the Project. The IEC shall be a person who has at least 7 years of experience in EM&A or environmental management. The IEC shall be responsible for duties defined in the EM&A Manual and shall audit the overall EM&A performance, including the implementation of all environmental mitigation measures, submissions required in the EM&A Manual, and any other submissions required under this Permit. In addition, the IEC shall be responsible for verifying the environmental acceptability of permanent and temporary works, relevant design plans and submissions under this Permit. The IEC shall verify the log-book(s) mentioned in Condition 2.1 of this

Permit. The IEC shall notify the Director by fax, within one working day of receipt of notification from the ET Leader of each and every occurrence, change of circumstances or non-compliance with the EIA Report (Register No. AEIAR-072/2003) and this Permit, which might affect the monitoring or control of adverse environmental impacts from the Project. In the case where the IEC fails to so notify the Director of the same, fails to discharge the duties of the IEC as defined in the EM&A Manual or fails to comply with this Condition, the Director may require the Permit Holder by notice in writing to replace the IEC. Failure to replace the IEC as directed or further failure to so notify the Director despite employment of a new IEC may render the Permit liable to suspension, cancellation or variation. Notification by the Permit Holder is the same as notification by the IEC for the purpose of this Condition.

¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e¡A³\¥iÃÒ«ù¦³¤H¶·¦Ü¤Ö´£¦­1­Ó¤ë¸u¥Î¤@¦W¿W¥ßÀô¹Ò¬d®Ö¤H¡C¿W¥ßÀô¹Ò¬d®Ö¤H¤£±o»P¤uµ{¶µ¥Øªº©Ó¿ì°Ó©ÎÀô¹Ò¤p²Õ¦³¥ô¦óÁpô¡C¿W¥ßÀô¹Ò¬d®Ö¤H¶·¦bÀôºÊ©ÎÀô¹ÒºÞ²z¤è­±¦Ü¤Ö¦³7¦~¸gÅç¡C¿W¥ßÀô¹Ò¬d®Ö¤H¶·°õ¦æÀôºÊ¤â¥U©Ò¦C©úªºÂ¾°È¡A¥H¤Î¼f®Ö¾ãÅéÀôºÊ¤u§@ªºªí²{¡A¥]¬A¹ê¬I©Ò¦³Àô¹Ò½w¸Ñ±¹¬I¡B´£¥æÀôºÊ¤â¥U³W©wªº¤å¥ó¡A¥H¤Î´£¥æ¥»³\¥iÃÒ©Ò­n¨Dªº¨ä¥L¤å¥ó¡C¦¹¥~¡A¿W¥ßÀô¹Ò¬d®Ö¤H¶·®Ö¹ê¥Ã¤[¤ÎÁ{®É¤uµ{¦bÀô¹Ò¤Wªº¥i±µ¨üµ{«×¡B¬ÛÃöªº³]­p¹Ï«h©M®Ú¾Ú¥»³\¥iÃÒ´£¥æªº¤å¥ó¡A¨Ã¶·®Ö¹ê¥»³\¥iÃÒ±ø¥ó²Ä2.1¶µ©Ò­zªº°O¿ý¥U¡C¦b¨C¦¸¥X²{¨Æ¬G¡B±¡ªpÅܤƩΤ£²Å¦XÀôµû³ø§i (µn°O¥U½s¸¹¡GAEIAR-072/2003) ¤Î¥»³\¥iÃÒªº±¡ªp¡A¦Ó¥i¯à·|§«Ãª¤uµ{¶µ¥Ø©Ò³y¦¨¤£¨}Àô¹Ò¼vÅTªººÊ¹î©Î±±¨î¤u§@®É¡A¿W¥ßÀô¹Ò¬d®Ö¤H¶·¦b±µÀòÀô¹Ò¤p²Õ²Õªø³qª¾«á1­Ó¤u§@¤Ñ¤º¥H¶Ç¯u¤è¦¡³qª¾¸pªø¡C¿W¥ßÀô¹Ò¬d®Ö¤H¦p¥¼¯à³qª¾¸pªø¦³Ãö±¡ªp¡B¥¼¯à°õ¦æÀôºÊ¤â¥U©Ò¦C©úªº¿W¥ßÀô¹Ò¬d®Ö¤H¾°È©Î¥¼¯à²Å¦X¥»±ø¥óªº³W©w¡A¸pªø¥i¥H®Ñ­±­n¨D³\¥iÃÒ«ù¦³¤HºM´«¿W¥ßÀô¹Ò¬d®Ö¤H¡C¦p¥¼¯à«ö«ü¥ÜºM´«¿W¥ßÀô¹Ò¬d®Ö¤H¡A©Î¦b¸u¥Î·s¿W¥ßÀô¹Ò¬d®Ö¤H«á¤´¥¼¯à³qª¾¸pªø¦³Ãö±¡ªp¡A«h©Î·|¾É­P³\¥iÃÒ¾D¼È®É¦Q¾P¡B¨ú®ø©Î§ó§ï¡C¬°°õ¦æ¥»±ø¥ó¡A³\¥iÃÒ«ù¦³¤Hªº³qª¾µ¥¦P¿W¥ßÀô¹Ò¬d®Ö¤Hªº³qª¾¡C

 

3.     Submissions or Measures for the Construction of the Project

      ¤uµ{¶µ¥Ø«Ø³y´Á¶¡¶·±Ä¨úªº±¹¬I

 

3.1      The Permit Holder shall, within 4 weeks after the commencement of construction of the Project, inform the Director in writing the management organization of the main construction companies and/or any form of joint ventures associated with the construction of the Project.  The submitted information shall include at least an organization chart, names of responsible persons and their contact details.

                      

           ³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«á4­Ó¬P´Á¤º¡A§â¥D­n«Ø³y¤½¥q¤Î / ©Î¥H¥ô¦ó§Î¦¡©e¥ôªº¦XÀç¥ø·~ªººÞ²z¬[ºc¡A¥H®Ñ­±³qª¾¸pªø¡C´£¥æªº¸ê®Æ¶·¦Ü¤Ö¥]¬A¤@¥÷²Õ´¹Ï¡B­t³d¤Hªº©m¦W¤ÎÁpµ¸¸ê®Æ¡C

 

          

Measures to mitigate Water Quality Impacts

¤ô½è¼vÅT½w¸Ñ±¹¬I

 

3.2     Chemical toilets should be provided to collect sewage from workforce.  The chemical toilets should be cleaned on a regular basis.

¨Ï¥Î¤Æ¾Ç¾¯²M²zªº´Z©Ò¶·´£¨Ñ©ó¤u¦a¥H¦¬¶°¤u§@¤H­û²£¥Í¤§¦Ã¤ô¡C¦¹¨Ï¥Î¤Æ¾Ç¾¯²M²zªº´Z©Ò¶·©w´Á²M¬~¡C

 

4.      Measures for the Operation of the Project

          ¤uµ{¶µ¥ØÀç¿ì´Á¶¡¶·±Ä¨úªº±¹¬I

 

Measures to Mitigate Odour Impacts

®ð¨ý¼vÅT½w¸Ñ±¹¬I

 

4.1     All odour emissions from the odour sources shall be ventilated to a deodorization unit with a hydrogen sulphide (H2S) removal efficiency of at least 96% and an exhaust exit velocity of not less than 10m/s.

®ð¨ý·½ÄÀ¥Xªº®ðÅé±N¥Ñ³q­·¨t²Î¦¬¶°¦Ü°£¯ä¸Ë¸m¡A¦Ó°£¯ä¸Ë¸mªº²¸¤Æ²B¥h°£²v»Ý­n¹F¨ì96%¥H¤W¤Î±Æ®ð³t«×¤£¤Ö©ó10m/s¡C

 

Measures to Mitigate Noise Impacts

¾¸­µ¼vÅT½w¸Ñ±¹¬I

 

4.2   The Permit Holder shall implement the following measures to mitigate operational noise impacts.

(a)    All the noisy equipment should be housed underground or within building structures made of suitable materials (e.g. concrete). It should be a complete enclosure with minimal openings for which these openings should not be facing any noise sensitive receivers (NSRs); and

(b)    A silenced ventilation system incorporating silencers with a noise reduction of 10 dB(A) at the air intakes and discharge openings should be employed. Testing certificate and/or manufacturer¡¦s specifications of the silencers should be made available at the facilities for inspections.

³\¥iÃÒ«ù¦³¤H¶·±Ä¨ú¥H¤U±¹¬I¥H½w¸ÑÀç¿ì´Á¶¡ªº¾¸­µ¼vÅT¡C

(a)    ©Ò¦³°ª¾¸­µªº³]³Æ¶·¸m¤J¦a®w©Î¥H¾A·íª«®Æ(¦p²V¾®¤g)«Ø¦¨¤§«Ø¿vª«¤º¡C«Ø¿vª«À³§¹¥þ±K³¬¡A©Ò¦³³q­·¨t²Î±Æ®ð¸Ë¸m©M¥ô¦ó¥X¤J³q¹D¶·¸m©ó»·離ªþªñ¹ï¾¸­µ·PÀ³±jªº¦a¤è¡F¤Î

(b)    ¦b¦U¤J®ð¤f¤Î±Æ®ð¤f³B¶·¦w¸Ë¨ã®ø­µ¾¹ªºÀR­µ³q­·¨t²Î¡A¨ä´î­µ®Ä¯à¶·¹F10¤À¨©(A)¡C®ø­µ¾¹ªº´ú¸ÕÃҮѩΥͲ£°Ó³W®æ¶·©ñ¸m©óýv¤ô³B²z¼t¥H¨ÑÀˬd¡C

 

Measures to Mitigate Landscape and Visual Impacts

´ºÆ[¤Îµøı¼vÅT½w¸Ñ±¹¬I

 

4.3        A 5m wide planting reserve around the perimeter of the expanded sewage treatment works as shown in Figure 1should be provided to allow a continuous belt of trees to be planted as a visual screen.

¦býv¤ô³B²z¼tÂX«Ø©P³ò¶·¦p¹Ï1©Ò¥Ü³]5¦Ì¼eªº³s³e¾ð¤ì®âºØ°Ï¥H¹F­P«Ì½ª¦¡¾ðªLªº§@¥Î¡C

 

 

5.      Environmental Monitoring and Audit (EM&A) Requirements for the Construction and Operation of the Project

             Àô¹ÒºÊ¹î¤Î¼f®Ö³W©w

 

 

5.1  The EM&A programme shall be implemented in accordance with the procedures and requirements as set out in this EM&A Manual.  Any change to the programme shall be justified by the ET leader and verified by the IEC as conforming to the information and requirements contained in the EM&A Manual before submission to the Director for approval.

 

ÀôºÊ­p¹º¶·«ö·ÓÀôºÊ¤â¥U©Ò¸üµ{§Ç¤Î³W©w°õ¦æ¡CÀôºÊ­p¹º¦p¦³¥ô¦ó§ó§ï¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø´£¥X¥R¤À²z¥Ñ¡A¨Ã¥Ñ¿W¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú¨ä²Å¦XÀôºÊ¤â¥U©Ò¸ü¸ê®Æ¤Î³W©w¡AµM«á¤~´£¥æ¸pªø§å­ã¡C

 

         

5.2      Samples, measurements and necessary remedial actions shall be taken in accordance with the                                   

requirements of the EM&A Manual by:

(a)    conducting baseline environmental monitoring;

(b)    conducting impact monitoring;

(c)    carrying out remedial actions described in the Event/Action Plans of the EM&A Manual in accordance with the time frame set out in the Event/Action Plans, or as agreed by the Director, in case where specified criteria in the updated EM&A Manual are exceeded;

(d)    logging and keeping records of the details of (a) to (c) above for all parameters within 3 working days of the collection of data or completion of remedial action(s), for the purpose of preparing and submitting the monthly EM&A Reports and to make available the information for inspection on site.

         ¨ú¼Ë¡B´ú¶q¤Î±Ä¨ú¥²­nªº¸É±Ï¦æ°Ê®É¡A§¡¶·«ö·ÓÀôºÊ¤â¥Uªº³W©w¶i¦æ¡G

(a)      ¶i¦æÀô¹Ò°ò½uºÊ´ú¡F

(b)      ¶i¦æ¼vÅTºÊ´ú¡F

(c)       ¦p¶W¹OÀôºÊ¤â¥U¤º«ü©wªº¼Ð·Ç¡A«h«ö·ÓÀôºÊ¤â¥U¤ºªº¨Æ¥ó / ¦æ°Ê­p¹º©Ò­q©úªº®É­­©Î¸pªø¦P·Nªº®É­­¡A°õ¦æ¨Æ¥ó / ¦æ°Ê­p¹º©Ò»¡©úªº¸É±Ï¦æ°Ê¡F¥H¤Î

(d)       ¦b¦¬¶°¼Æ¾Ú©Î§¹¦¨¸É±Ï¦æ°Ê3­Ó¤u§@¤Ñ¤º¡A¶·°O¿ý¤Î³Æ¦s¤W¤å(a)¦Ü(c)¶µ¦U°Ñ¼Æªº¸Ô±¡¡A¥Î§@ÀÀ³Æ¨Ã´£¥æ¨C¤ëÀôºÊ³ø§i¡A¨Ã³Æ§´¦³Ãö¸ê®Æ¥H¨Ñ¦b¤u¦a¬d¾\¡C

 

 

5.3    Three hard copies and one electronic copy of the Baseline Monitoring Report shall be submitted to the Director at least 2 weeks before the commencement of construction of the Project.  The submission shall be certified by the ET Leader and verified by the IEC.  Additional copies of the submission shall be made available to the Director upon his request.

¦b¤uµ{¶µ¥Ø«Ø³y¤uµ{®i¶}«e¡A¶·¦Ü¤Ö´£¦­2­Ó¬P´Á¦V¸pªø´£¥æ°ò½uºÊ´ú³ø§iªº3¥÷µw½Æ¥»¤Î1¥÷¹q¤lª©¥»¡C¤å¥ó¦b´£¥æ¸pªø«e¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú²Å¦XÀôºÊ¤â¥U©Ò¸üªº³W©w¡C¦p¸pªø­n¨D¡A«h¶·´£¥æ°ò½uºÊ´ú³ø§iªºÃB¥~½Æ¥»¡C

                                                    

5.4    Three hard copies and one electronic copy of monthly EM&A Report shall be submitted to the       Director within 2 weeks after the end of the reporting month.  The EM&A Reports shall include a summary of all non-compliance (exceedances) of the environmental quality performance limits (Action and Limit Levels).  The submissions shall be certified by the ET Leader and verified by the IEC.  Additional copies of the submission shall be provided to the Director upon request by the Director.

¦b³W©w´£¥æ³ø§iªº¤ë¥÷µ²§ô«á2­Ó¬P´Á¤º¡A¶·¦V¸pªø´£¥æ¤uµ{¶µ¥Ø«Ø³y¶¥¬qªº¨C¤ëÀôºÊ³ø§iªº3¥÷µw½Æ¥»¤Î1¥÷¹q¤lª©¥»¡C¨C¤ëÀôºÊ³ø§i¶·¥]¬A¦UºØ¤£²Å¦X¡]¶W¥X¡^Àô¹Ò½è¯Àªí²{³W­­(¦æ°Ê¤Î·¥­­¤ô¥­)±¡ªpªººK­n¡C¤å¥ó¦b´£¥æ¸pªø«e¡A¶·¥ÑÀô¹Ò¤p²Õ²Õªø®ÖÃҤοW¥ßÀô¹Ò¬d®Ö¤H®Ö¹ê¡AÃÒ©ú²Å¦XÀôºÊ¤â¥U©Ò¸üªº³W©w¡C¦p¸pªø­n¨D¡A«h¶·´£¥æ¨C¤ëÀôºÊ³ø§iªºÃB¥~½Æ¥»¡C

 

5.5          All EM&A data submitted under this Permit shall be true, valid and correct.

®Ú¾Ú¥»³\¥iÃÒ´£¥æªº©Ò¦³ÀôºÊ¼Æ¾Ú¡A§¡¶·¦³®Ä¤Î¯u¹êµL»~¡C

 

 

6.   Electronic Reporting of EM&A Information

            ÀôºÊ¸ê®Æªº¹q¤l¶×³ø

 

6.1    To facilitate public inspection of the Baseline Monitoring Report and monthly EM&A Reports via the EIAO Internet Website and at the EIAO Register Office, electronic copies of these Reports shall be prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF version 4.0 or later), unless otherwise agreed by the Director and shall be submitted at the same time as the hard copies as described in Condition 5.3 and 5.4 above of this Permit.  For the HTML version, a content page capable of providing hyperlink to each section and sub-section of these Reports shall be included in the beginning of the document. Hyperlinks to all figures, drawings and tables in these Reports shall be provided in the main text from where the respective references are made.  All graphics in these Reports shall be in interlaced GIF format unless otherwise agreed by the Director.  The content of the electronic copies of these Reports must be the same as the hard copies.

¬°¤è«K¤½²³³z¹LÀôµû±ø¨Ò¤¬Ápºôºô¯¸¤Î¦bÀôµû±ø¨Òµn°O¥U¿ì¨Æ³B¬d¾\°ò½uºÊ´ú³ø§i¤Î¨C¤ëÀôºÊ³ø§i¡A¥H¶W¤å¥»¼Ð¥Ü»y¨¥¡]HTML¡^¡]²Ä4.0©Î¸û«áª©¥»¡^¤Î«KÄ⦡¤å¥ó®æ¦¡¡]PDF¡^¡]²Ä4.0©Î¸û«áª©¥»¡^»s§@ªº³ø§iªº¹q¤lª©¥»¡A°£«D¥tÀò¸pªø¦P·N¡A¶·»P¥»³\¥iÃÒ±ø¥ó²Ä5.3¤Î5.4¶µ©Ò»¡©úªºµw½Æ¥»¦P®É´£¥æ¡CÃö©óHTMLªºª©¥»¤è­±¡A¥i»P³ø§i¦U¸`¤Î¤p¸`§@¥X¶W¤å¥»³sµ²ªº¥Ø¿ý¶·¦b¤å¥ó¶}ºÝ¥[¤J¡C³ø§i¤º¦UÃþ¹Ïªí¶·¦b¸ü¦³¬ÛÃö¸ê®Æªº¥¿¤å¤º§@¥X¶W¤å¥»³sµ²¡C°£«D¥tÀò¸pªø¦P·N¡A³ø§i¤º©Ò¦³¹Ï§Î§¡¶·¥H¥æ¿ù¦s¨úªºGIF®æ¦¡¨î©w¡C³ø§iªº¹q¤lª©¥»¤º®e¡A¥²¶·»Pµw½Æ¥»ªº¤º®e¤@­P¡C 

 

6.2     The Permit Holder shall, within six weeks after the commencement of construction of the    Project, set up a dedicated Internet web site and notify the Director in writing the Internet address where the environmental monitoring data and project information is to be placed.  All environmental monitoring data described in Condition 6.1 above shall be made available to the public via the abovementioned dedicated Internet web site in the shortest possible time and in any event no later than 2 weeks after the relevant environmental monitoring data are collected or become available, unless otherwise agreed with the Director. 

³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«á6­Ó¬P´Á¤º¡A³]¥ß¯S©wºô¯¸¦s©ñ¤uµ{¶µ¥Ø¸ê®Æ¤Î¤W

¤å±ø¥ó²Ä5.1¶µ»¡©úªº©Ò¦³Àô¹ÒºÊ¹î¼Æ¾Ú©M³ø§i¤Î¥»³\¥iµý­n¨D´£¥æªº³ø§i¤Î­p¹ºªº³Ì²×ª©¥»¡A

¨Ã¥H®Ñ­±³qª¾¸pªø¤¬Ápºôºô§}©Ò¦b¡C°£«D¥tÀò¸pªø¦P·N¡A¤W¤å±ø¥ó²Ä6.1¶µ»¡©úªº©Ò¦³Àô¹ÒºÊ¹î¼Æ¾Ú¤Î³ø§i¡A§¡¶·ºÉ§Ö³z¹L¥Ñ³\¥iÃÒ«ù¦³¤H³]¥ßªº¯S©wºô¯¸¨Ñ¤½²³¾\Äý¡A¦b¥ô¦ó±¡ªp¤U§¡¤£±o¿ð©ó¦³Ãö¸ê®Æ¦b¦¬¶°©Î¥i¨Ñµo©ñ«áªº2­Ó¬P´Á¤º¤W¸ü¦Ü¸Ó¯S©wºô¯¸¡C

 

6.3     The Internet web site as described in Condition 6.2 above shall enable user-friendly public access to

the environmental monitoring data and project information including the Project Profile and this Environmental Permit.  The Internet web site shall have features capable of: 

(a)    providing access to all environmental monitoring data of this Project collected since the    commencement of construction;

(b)    providing access to all finalized submissions as required under this Permit;

(c)    searching by date;

(d)    searching by types of monitoring data (water quality, noise and air quality); and

(e)    hyperlinking to relevant monitoring data after searching;

or otherwise as agreed by the Director.

 

 

 

 

 

¤W¤å±ø¥ó²Ä6.2¶µ»¡©úªº¤¬Ápºôºô¯¸¡A¥²¶·¤è«K¥Î¤á¨Ï¥Î¡AÅý¤½²³®e©ö±µ¹FÀô¹ÒºÊ¹î¼Æ¾Ú¤Î¤uµ{¶µ¥Ø¸ê®Æ¡A·í¤¤¥]¬A¤uµ{¶µ¥Ø²¤¶¤Î¦¹Àô¹Ò³\¥iÃÒ¡C°£«D¥tÀò¸pªø¦P·N¡A¤¬Ápºôºô¯¸¶·¨ã³Æ³¡¥ó¡A´£¨Ñ¤U­z¥\¯à¡G

(a)    ±µ¹F¤uµ{®i¶}«á©Ò¦¬¶°ªº¥þ³¡Àô¹ÒºÊ¹î¼Æ¾Ú¡F

(b)    ±µ¹F©Ò¦³¥»³\¥iÃÒ¤º­n¨D´£¥æªº¤å¥ó¤Î­p¹ºªº³Ì²×ª©¥»

(c)    «ö¤é´Á·j´M¡F

(d)    «öºÊ¹î¼Æ¾ÚÃþ§O (¤ô½è¡B¾¸­µ¤ÎªÅ®ð½è¯À) ·j´M¡F¥H¤Î

(e)    ¦b·j´M«á»P¬ÛÃöªººÊ¹î¼Æ¾Ú§@¥X¶W¤å¥»³sµ²¡C

©Î¸pªø¦P·Nªº¨ä¥L¥\¯à¡C

 


 

Notes :

µù¡G

 

1.      This Permit consists of three parts, namely, PART A (Main Permit), PART B (Description of Designated Project) and PART C (Permit Conditions). Any person relying on this permit should obtain independent legal advice on the legal implications under the Ordinance, and the following notes are for general information only.

¥»³\¥iÃÒ¦@¦³3³¡¡A§YA³¡ (³\¥iÃÒ¥D­n³¡¤À)¡FB³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú) ¤ÎC³¡ (³\¥iÃÒ±ø¥ó)¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´N±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤U­zµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C

 

2.      If there is a breach of any conditions of this Permit, the Director or his authorized officer may, with the consent of the Secretary for the Environment, order the cessation of associated work until the remedial action is taken in respect of the resultant environmental damage, and in that case the Permit Holder shall not carry out any associated works without the permission of the Director or his authorized officer.

¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤H­û¥i¦bÀô¹Ò§½§½ªøªº¦P·N¤U°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤H­û¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C

 

3.      The Permit Holder may apply under Section 13 of the Environmental Impact Assessment Ordinance (the ¡§Ordinance¡¨) to the Director for a variation of the conditions of this Permit. The Permit Holder shall replace the original permit displayed on the Project site by the amended permit.

³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀô¹Ò¼vÅTµû¦ô±ø¨Ò²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»Àô¹Ò³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·±N¸g­×§ïªº³\¥iÃÒ¡A´À´«¦b«Ø³y¤u¦a¤º®i¥Üªº­ì¦³³\¥iÃÒ¡C

 

4.      A person who assumes the responsibility for the whole or a part of the Project may, before he assumes responsibility of the Project, apply under Section 12 of the Ordinance to the Director for a further environmental permit.

©Ó¾á«ü©w¤uµ{¶µ¥Øªº¾ã¶µ©Î³¡¤À¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á«ü©w¤uµ{¶µ¥Ø³d¥ô¤§«e¡A¥i®Ú¾Ú±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C

 

5.      Under Section 14 of the Ordinance, the Director may with the consent of the Secretary for the Environment, suspend, vary or cancel this Permit.  The suspended, varied or cancelled Permit shall be removed from display at the Project site.

®Ú¾Ú±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦bÀô¹Ò§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øÀô¹Ò³\¥iÃÒ¡C¸g¦Q¾Pªº³\¥iÃÒ¥²¶·±q§åµo¥«³õ°£¤U¡A¤£¦A®i¥Ü¡C

 

6.      If this Permit is cancelled or surrendered during construction of the Project, another environmental permit must be obtained under the Ordinance before the Project could be continued. It is an offence under Section 26(1) of the Ordinance to construct a designated project listed in Schedule 2 of the Ordinance without a valid environmental permit.

¦pªG¥»³\¥iÃÒ¦b¤uµ{¶µ¥ØÀç¿ì´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~ÄòÀç¿ì¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾Ú±ø¨Ò³W©w¨ú±oÀô¹Ò³\¥iÃÒ¡C®Ú¾Ú±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³Àô¹Ò³\¥iÃÒªº±¡ªp¤U«Ø³y©ÎÀç¿ì«ü©w¤uµ{¶µ¥Ø¡A§YÄݥǸo¡C

 

7.     Any person who constructs the Project contrary to the conditions in the Permit, and is convicted of an      

       offence under the Ordinance, is liable: -  

(i)        on a first conviction on indictment to a fine of $ 2 million and to imprisonment for 6 months;

(ii)       on a second or subsequent conviction on indictment to a fine of $ 5 million and to imprisonment for 2 years;

(iii)      on a first summary conviction to a fine at level 6 and to imprisonment for 6 months;                

(iv)      on a second or subsequent summary conviction to a fine of $1 million and to imprisonment for 1year; and

 

(v)       in any case where the offence is of a continuing nature, the court or magistrate may impose a fine of $10,000 for each day on which he is satisfied the offence continued.

 

 

¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤UÀç¿ì«ü©w¤uµ{¶µ¥Ø¡A®Ú¾ÚÀôµû±ø¨Ò¡A§YÄݥǸo¡X

(i)                 ¤@¸g´`¤½¶Dµ{§Ç­º¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6­Ó¤ë¡F

(ii)               ¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F

(iii)             ¤@¸g´`²©öµ{§Ç­º¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6­Ó¤ë¡F

(iv)              ¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¤Î

(v)                ¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄÝ«ùÄò©Ê½è¡A«hªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ«ùÄòªº¨C¤Ñ¥t³B»@´Ú10,000¤¸¡C

 

8.       The Permit Holder may appeal against any condition of this Permit under Section 17 of the Ordinance within 30 days of receipt of this Permit.

®Ú¾ÚÀôµû±ø¨Ò²Ä17±øªº³W©w¡A¥Ó½Ð¤H¥i¦b±µÀòÀô¹Ò³\¥iÃÒ«á30¤Ñ¤º¡A¦V¤W¶D©e­û·|´£¥X¤W¶D¡A¤Ï¹ï¸pªøªº¨M©w¡C

 

9.      The Notes are for general reference only and that the Permit Holder should refer to the EIA Ordinance for details and seek independent legal advice.

¤W­zµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡A±ýª¾¦³Ãö¸Ô±¡¡A³\¥iÃÒ«ù¦³¤H¶·°Ñ¾\Àôµû±ø¨Ò¤Î¼x¸ß¿W¥ßªk«ß·N¨£¡C

 

 

Environmental Permit No. EP-464/2013

Àô¹Ò³\¥iÃÒ½s¸¹No. EP-464/2013