Environmental Permit No.
EP-520/2016
環境許可證編號EP-520/2016
ENVIRONMENTAL
IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
Section 10
環境影響評估條例
(第499章)
第10條
ENVIRONMENTAL PERMIT TO CONSTRUCT A DESIGNATED PROJECT
建造及營辦指定工程項目的環境許可證
PART A (MAIN PERMIT)
A部 (許可證主要部分)
Pursuant to Section 10 of the
Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental
Protection (the Director) grants this environmental permit to the Civil Engineering and Development Department (hereinafter referred to as the "Permit
Holder") to construct the designated project described in Part B subject
to the conditions specified in Part C. The issue of this environmental permit
is based on the documents, approvals or permissions described below:-
根據《環境影響評估條例》(環評條例)第10條的規定,環境保護署署長(署長)將本環境許可證批予土木工程拓展署 (下稱許可證持有人)以建造B部所說明的指定工程項目,但須遵守C部所列明的條件。本環境許可證的發出,乃以下表所列的文件、批准或許可作為根據:-
Application No. 申請書編號 |
AEP- 520/2016 |
Document in
the Register |
(1) Project
Profile –Landslip Prevention and Mitigation Works at
Feature Nos. 11SW-A/R94 and 11SE-A/FR218, Caine Lane, Mid-Levels (Register
No.: PP-541/2016)
工程項目簡介 – 半 山 區 堅 巷 人 造 斜 坡 編 號11SW-A/R94 及 11SW-A/FR218 防 治 山 泥 傾
瀉 工 程 (登記冊編號: PP-541/2016) (2) The Director’s
letter of permission to apply directly for environmental permit dated 26 July
2016 [Ref.: (15) in EP2/H4/Q/18 ]. 署長於2016年7月26日發出批准直接申請環境許可證的信件 [檔案編號:(15) in EP2/H4/Q/18] (3)
Application for Environmental Permit submitted on
1 August 2016 (Application No.
AEP-520/2016) 於2016年8月1日提交的環境許可證的申請 (申請書編號 AEP- 520/2016) |
8 August 2016
Date 日期 |
|
(Ken Y. K. WONG) Principal Environmental Protection
Officer for Director of
Environmental Protection 環境保護署署長 (首席環境保護主任 黃耀光 代行) |
PART B ( DESCRIPTION OF DESIGNATED PROJECT)
B部 (指定工程項目的說明)
Hereunder is the
description of the designated project(s) mentioned in Part
A of this environmental permit (hereinafter referred to as the
“Permit”):-
下列為本環境許可證(下稱“許可證”)A部所提及的指定工程項目的說明:
Title of
Designated Project(s) 指定工程項目的名稱 |
Landslip Prevention and Mitigation Works at
Feature Nos. 11SW-A/R94 and 11SE-A/FR218, Caine Lane, Mid-Levels [This designated project is hereinafter referred to as "the
Project"] 半 山 區 堅
巷 人 造
斜 坡 編
號11SW-A/R94 及
11SW-A/FR218 防 治 山 泥
傾 瀉 工
程 |
Nature of
Designated Project(s) 指定工程項目的性質 |
Upgrading
two substandard Government man-made slopes, Feature Nos. 11SW-A/R94 and
11SW-A/FR218, which will involve earthworks partly within the existing
boundary of a Declared Monument (Old Pathological Institute). 鞏固兩幅不合標準的政府人造斜坡,包括人造斜坡編號11SW-A/R94及11SW-A/FR218。而部份工程將會在法定古蹟 (舊病理學院) 的範圍內進行。 |
Location of
Designated Project(s) 指定工程項目的地點
|
The
Project is located at the south and the northwest of Hong Kong Museum of
Medical Science (HKMMS) (also known as Old Pathological Institute), Caine
Lane, Mid-Levels. The location of this Project is
shown in Figure 1 attached to this
Permit. 工程項目位於半山區堅巷香港醫學博物館 (又名舊病理學院)南面及西北面。工程項目的位置見載於本許可證夾附的圖一。 |
Scale and
Scope of Designated Project(s) 指定工程項目的規模和範圍 |
The project mainly comprises:- (a)
installation of dowel
bars at the back of an existing masonry wall with concrete thickening and
excavation (next to the Main Building of the HKMMS); and (b)
installation of soil
nails on the front face of another masonry wall (next to the Annex Block of
the HKMMS) The scope of works is shown in Figure 2 of this Permit.
The full details are given in the Project Profile (Register No.: PP-541/2016) 擬建工程主要包括: (a)
於香港醫學博物館大樓附近的人造斜坡背面安裝接頭插筋並加厚牆身和回填; 及 (b)
於香港醫學博物館小屋附近的人造斜坡正面安裝泥釘。 工程項目的範圍見載於圖二,而有關工程的詳細資料已在工程項目簡介內列明 (登記冊編號:PP-541/2016)。 |
C部 (許可證條件)
1
General Conditions
一般條件
1.1
The Permit Holder and any person working on the
Project shall comply with all conditions set out in this Permit. Any
non-compliance by any person may constitute a contravention of the
Environmental Impact Assessment Ordinance (EIAO) (Cap. 499) and may become the
subject of appropriate action being taken under the EIAO.
許可證持有人及任何從事工程項目的人士必須完全符合本許可證載列的全部條件。任何人士如有不符合本許可證的情況,可能違反《環境影響評估條例》(第499章)的規定,而當局可根據條例採取適當行動。
1.2
The Permit Holder shall ensure full compliance with all
legislation from time to time in force including, without limitation to, the
Air Pollution Control Ordinance (Cap. 311), Waste Disposal Ordinance (Cap.
354), Water Pollution Control Ordinance (Cap. 358), Noise Control Ordinance
(Cap. 400) and Dumping at Sea Ordinance (Cap. 466). This Permit does not of itself constitute any ground of defence
against any proceedings instituted under any legislation or any approval under
any legislation.
許可證持有人須經常確保完全符合現行法例的規定,包括但不限於《空氣污染管制條例 》(第311章)、《廢物處置條例》(第354章)、《水污染管制條例》(第358章)、《噪音管制條例》(第400章)及《海上傾倒物料條例》(第466章)。本許可證本身不會就根據任何法例提起的法律程序構成任何抗辯理由,或根據任何法例構成任何批准。
1.3
The Permit Holder shall make copies of this Permit
together with all documents referred to in this Permit and the documents
referred to in Part A of the Permit readily available at
all times for inspection by the Director or his authorised officers at all
sites/offices covered by this Permit. Any reference to the Permit shall include
all documents referred to in the Permit and also the relevant documents in the
Register.
許可證持有人須印製本許可證的複本,連同本許可證所述的所有文件及本許可證A部所述文件,以供署長或獲授權人員任何時間內在本許可證所涵蓋的所有工地/辦事處查閱。凡提述本許可證,須包括本許可證所述的所有文件及登記冊內的相關文件。
1.4
The Permit Holder shall give a copy of this Permit to
the person(s) in charge of the site(s) and ensure that such person(s) fully
understands all conditions and all requirements incorporated in the Permit. The
site(s) refers to site(s) of construction of the Project
and shall mean the same hereafter.
許可證持有人須把本許可證的一份複本交予有關工地的負責人,並確保這些人士完全明白本許可證的所有條件與規定。工地是指建造工程項目的工地,下文所提及的工地亦屬同一意思。
1.5
The Permit Holder shall display conspicuously a copy
of this Permit on the Project site(s) at all vehicular site entrances/exits or
at a convenient location for public’s information at all times. The Permit Holder
shall ensure that the most updated information about the Permit, including any
amended Permit, is displayed at such locations. If the Permit Holder
surrenders a part or the whole of the Permit, the notice he sends to the
Director shall also be displayed at the same locations as the original
Permit. The suspended, varied or cancelled Permit shall be removed from
display at the Project site(s).
許可證持有人須在工程項目工地的所有車輛進出口或一處方便地點,顯眼地展示本許可證的複本,以供公眾在任何時間內閱覽。許可證持有人須確保在這些地點展示關於本許可證(包括任何經修訂的許可證)的最新資料。許可證持有人如交回許可證的部分或全部,必須把其送交署長的通知書,在備有原有許可證的各處相同地點展示。遭暫時吊銷、更改或取消的許可證必須從工程項目工地除下,不再展示。
1.6
The Permit Holder shall construct the Project in
accordance with the project description in Part B of this
Permit.
許可證持有人須依據本許可證B部的工程項目說明,建造本工程項目。。
1.7
The Permit Holder shall ensure that the Project is
designed and constructed in accordance with the
information and recommendations described in the Project
Profile (Register No. PP- 541/2016); the application document for environmental
permit; other relevant documents in the Register, the information and
mitigation measures described in this Permit, and mitigation measures to be
recommended in the submissions that shall be deposited with or approved by the
Director as a result of the permit conditions contained in this Permit, and
mitigation measures to be recommended under on going surveillance and
monitoring activities during all stages of the Project. Where recommendations
referred to in the documents of the Register are not expressly referred to in
this Permit, such recommendations are nevertheless to be implemented unless
expressly excluded or amended in this Permit.
許可證持有人須確保工程項目的設計及建造,按照下述資料及措施辦理:工程項目簡介(登記冊編號:PP-541/2016)所說明的資料及各項建議;環境許可證的申請文件;登記冊內的其他相關文件;本許可證所說明的資料及緩解措施;根據本許可證內載的條件須向署長存放或獲署長批准的文件內所建議的緩解措施;以及在工程項目各階段進行的持續監察及監測工作期間所建議的緩解措施。登記冊文件所述建議如沒有在本許可證明確表示,則仍須實施這些建議,除非獲本許可證明確豁除或修訂。
1.8
All submissions, as required under this Permit, shall be
rectified and resubmitted in accordance with the comments, if any, made by the
Director within one month of the receipt of the Director’s comments or
otherwise as specified by the Director.
所有按本許可證規定提交的文件,須在接獲署長的意見(如有者)後1個月內 (除非署長另行指定),根據署長的意見加以修正及重新提交。
1.9
All submissions approved by the Director, all
submissions deposited without comments by the Director, or all submissions
rectified in accordance with comments by the Director under this Permit shall
be construed as part of the permit conditions described in Part
C of this Permit. Any variation of the submissions shall be approved
by the Director in writing or as prescribed in the relevant permit conditions.
Any non-compliance with the submissions may constitute a contravention of the
Environmental Impact Assessment Ordinance (Cap. 499).
所有提交署長並獲批准的文件、所有提交署長存放而沒有收到署長意見的文件、或根據本許可證提交並已依照署長的意見作出修訂的所有文件,將詮釋為本許可證C部所述的許可證條件的一部分。對提交文件所作的任何修訂,均須獲得署長的書面批准,或符合有關許可證條件所述。凡與所提交的文件有不符合的情況,均可能構成違反《環境影響評估條例》(第499章)。
1.10 The Permit
Holder shall release all finalized submissions as required under this Permit,
to the public by depositing copies in the Environmental Impact Assessment
Ordinance Register Office, or in any other places or any internet websites as
specified by the Director, or by any other means as specified by the Director
for public inspection. For this purpose, the Permit Holder shall provide
sufficient copies of the submissions.
許可證持有人須把所有按本許可證規定提交的文件定稿公開給公眾人士知道,方法是把有關文件複本存放於環境影響評估條例登記冊辦事處,或署長指定的任何其他地方,或署長指定的任何互聯網網站,或署長指定的任何方法,以供公眾查閱。因此,許可證持有人須提供足夠數量的複本。
1.11 All submissions
to the Director required under this Permit shall be delivered either in person
or by registered mail to the Environmental Impact Assessment Ordinance Register
Office (currently at 27/F, Southorn Centre, 130
Hennessy Road, Wanchai, Hong Kong). Electronic copies
of all finalized submissions required under this Permit shall be prepared in
Hyper Text Markup Language (HTML) (version 4.0 or
later) and in Portable Document Format (PDF version 1.3 or later), unless
otherwise agreed by the Director and shall be submitted at the same time as the
hard copies.
本許可證規定向署長提交的所有文件,須親身送交或以掛號方式郵寄至環境影響評估條例登記冊辦事處(現址為:香港灣仔軒尼詩道130號修頓中心27樓)。所有按本許可證規定提交的文件定稿的電子版本,均須以超文本標示語言(HTML)(第4.0或較後版本)和便攜式文件格式(PDF)(第1.3或較後版本)製作,除非另獲署長同意,並須與硬複本同時提交。
1.12 The Permit
Holder shall notify the Director in writing the commencement date of
construction of the Project no later than 2 weeks prior to commencement of
construction of the Project. The
Permit Holder shall notify the Director in writing immediately if there is a
change of the commencement date of the construction.
許可證持有人須在工程項目施工前至少兩個星期,以書面通知署長工程展開的日期。如工程展開的日期有任何更改,許可證持有人必須立即以書面通知署長。
1.13 For the purpose
of this Permit, “commencement of construction” does not include works related
to site clearance and preparation or other works as agreed by the Director.
為執行本許可證,「建造工程的展開」不包括有關工地清理及預備的工程,或署長同意的其他工程。
2
Specific
Conditions
特定條件
Submission and Measures before
Commencement of Construction of the Project
工程項目施工前須提交的文件及採取的措施
Employment of Environmental Monitoring and
Audit (EM&A) Personnel
聘用環境監察及審核 (環監)人員
2.1
An Independent
Environmental Checker (IEC) shall be
employed by the Permit Holder before commencement of construction of the
Project. The IEC shall not be in any way an associated body of the Contractor
or the Environmental Team (ET) for the
Project. The IEC shall audit the implementation of
all mitigation measures recommended in the Project Profile (Register No. PP- 541/2016), and to certify in writing in the monthly monitoring report full
implementation of the mitigation measures during and upon completion of the
construction works.
在工程項目的建造工程展開前,許可證持有人須聘用一名獨立環境查核人。獨立環境查核人不得與工程項目的承辦商或環境小組有任何聯繫。獨立查核人須審核工程項目簡介(登記冊編號:PP-541/2016) 中建議的所有緩解措施的執行,及在每月的監測報告中以書面確認已執行於工程項目簡介中建議的所有緩解措施。
3. Environmental Monitoring and Audit
Requirements
環境監察及審核規定
3.1 All
environmental mitigation measures described in the Project Profile
(No.PP-541/2016) submitted with the application on 20 June 2016 shall be fully
implemented.
所有在2016年6月20日提交的工程項目簡介(登記編號:PP-541/2016)內描述的環境緩解措施,必需徹底執行。
3.2 Submit to
the Director three hard copies and one electronic copy of the following, as
defined in the Project Profile (No. PP-541/2016):-
按照經工程項目簡介(登記編號:PP-541/2016) 所訂明,向署長提交以下各項的3份硬複本及1份電子版本:-
(a) Monthly monitoring reports showing site audit information no later than
2 weeks after the end of the reporting month throughout the entire construction
period; and
在整個工程施工期間規定提交報告的月份結束後2星期內,提交每月環監報告包括工地監測資料;以及
(b) Final EM&A Report within one month after completion of the
construction works.
在建造工程完成後1個月內,提交最後的環監報告。
3.3 All
EM&A results submitted under this Permit shall be true, valid and correct.
根據本許可證提交的所有環監結果,均須為有效及真實無誤。
Notes:
註:
1. This
Permit consists of three parts, namely, Part A
(Main Permit), Part B (Description of Designated
Project) and Part C (Permit Conditions). Any person
relying on this Permit should obtain independent legal advice on the legal
implications under the EIAO, and the following notes are for general
information only.
本許可證共有3部,即A部 (許可證主要部分);B部 (指定工程項目的說明) 及C部 (許可證條件)。任何援引本許可證的人士須就環評條例的法律含意徵詢獨立法律意見,下述註解只供一般參考用。
2. If
there is a breach of any conditions of this Permit, the Director or his
authorized officer may, with the consent of the Secretary for the Environment,
order the cessation of associated work until the remedial action is taken in
respect of the resultant environmental damage, and in that case the Permit
Holder shall not carry out any associated works without the permission of the
Director or his authorized officer.
如違反本許可證的任何條件,署長或獲授權人員徵得環境局局長的同意後可勒令停止相關工程,直至許可證持有人為所造成的環境損害採取補救行動為止。在此情況下,許可證持有人未經署長或獲授權人員同意,不得進行任何相關工程。
3. The
Permit Holder may apply under Section 13 of the EIAO to the Director for a
variation of the conditions of this Permit. The Permit Holder shall replace the
original permit displayed on the Project site by the amended permit.
許可證持有人可根據環評條例第13條的規定向署長申請更改本許可證的條件。許可證持有人須把經修改的許可證替換在工程項目工地內展示的原有許可證。
4. A
person who assumes the responsibility for the whole or a part of the designated
project(s) may, before he assumes responsibility of the designated project(s),
apply under Section 12 of the EIAO to the Director for a further environmental
permit.
承擔工程項目整項或部分工程的責任的人,在承擔責任之前,可根據環評條例第12條的規定向署長申請新的環境許可證。
5. Under
Section 14 of the EIAO, the Director may with the consent of the Secretary for
the Environment, suspend, vary or cancel this Permit. The suspended, varied or cancelled
Permit shall be removed from display at the Project site.
根據環評條例第14條的規定,署長可在環境局局長的同意下暫時吊銷、更改或取消本許可證。遭暫時吊銷、更改或取消的許可證必須從工程項目工地除下,不再展示。
6. If
this Permit is cancelled or surrendered during construction of the
Project, another environmental permit must be obtained under the EIAO before
the Project could be continued. It
is an offence under Section 26(1) of the EIAO to construct a designated
project listed in Schedule 2 of the EIAO without a valid environmental permit.
如果本許可證在工程項目建造期間被取消或交回,則在繼續進行工程項目之前,必須先根據環評條例規定取得另一份環境許可證。根據環評條例第26(1)條的規定,任何人在沒有有效環境許可證的情況下建造環評條例附表2所列明的指定工程項目,即屬犯罪。
7. Any
person who constructs or
operates the Project contrary to the conditions in the Permit, and is convicted of
an offence under the EIAO, is liable:
如任何人在違反本許可證的條件下建造或營辦工程項目,根據環評條例,即屬犯罪-
(i)
on a first conviction on indictment to a fine of $2
million and to imprisonment for 6 months;
一經循公訴程序首次定罪,可處罰款200萬元及監禁6個月;
(ii)
on a second or subsequent conviction on indictment to
a fine of $5 million and to imprisonment for 2 years;
一經循公訴程序第二次或其後每次定罪,可處罰款500萬元及監禁2年;
(iii)
on a first summary conviction to a fine at level 6 and
to imprisonment for 6 months;
一經循簡易程序首次定罪,可處第6級罰款及監禁6個月;
(iv)
on a second or subsequent summary conviction to a fine
of $1 million and to imprisonment for 1 year; and
一經循簡易程序第二次或其後每次定罪,可處罰款100萬元及監禁1年;及
(v)
in any case where
the offence is of a continuing nature, the court or magistrate may impose a
fine of $10,000 for each day on which he is satisfied the offence continued.
在任何情況下如該罪行屬連續性質,法院或裁判官可就其信納該罪行連續的每一天另處罰款10,000元。
8. The
Permit Holder may appeal against any condition of this Permit under Section 17
of the EIAO within 30 days of receipt of this Permit.
許可證持有人可在接獲本許可證後30天內,根據環評條例第17條就本許可證的任何條件提出上訴。
9. The
Notes are for general reference only and that the Permit Holder should refer to
the EIAO for details and seek independent legal advice.
上述註解只供一般參考用,欲知有關詳情,許可證持有人須參閱環評條例及徵詢獨立法律意見。