Futher Environmental Permit No. FEP-02/074/2002

       新的環境許可證編號 FEP-02/074/2002

 

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
Sections 10 & 12


(
499 )
10 12

FURTHER ENVIRONMENTAL PERMIT TO OPERATE A DESIGNATED PROJECT

PART A (MAIN PERMIT)
A
( )

Pursuant to Sections 10 & 12 of the Environmental Impact Assessment Ordinance, the Director of Environmental Protection (the Director) grants this further environmental permit to the HIGHWAYS DEPARTMENT (the "Permit Holder") to operate the designated project described in Part B subject to the conditions described in or attached to Part C. The issue of this further environmental permit is based on the documents, approvals or permissions described below:

10 12 ( ) 路 政 署 (" ") B 部 C 部 -

Application No.

FEP-056/2002

Document in the Register :

(1)Kowloon-Canton Railway Corporation - West Rail Essential Public Infrastructure Works (EPIW) Associated with West Rail Stations in Yuen Long, Tin Shui Wai, Tuen Mun Centre and Eastern Access Road (December 1999) (register No. AEIAR-025/1999)[hereinafter referred to as the "EIA report"]

 

(2)The Director's letter of approval of the EIA Report dated 28 December 1999 [ref: (38) in Ax (3) to EP2/G/A/94 Pt.3]

 

(3)Environmental Permit No. EP-74/2000 issued on 9 August 2000

(1) - 西 西 (1999 12) ( AEIAR-025/1999) [ " "]

(2) 199912 28 [ 號:(38) in Ax (3) to EP2/G/A/94 Pt.3]

(3) 2000 8 9 號:EP-074/2000

 

 

 

 

 

___________________
Date

 

 

______________________________________
(Mr. Elvis W K AU)
Assistant Director of Environmental Protection
(Environmental Assessment and Noise)
for Director of Environmental Protection

(
( ) 區 偉 光 代 行)

 


PART B (DESCRIPTIONS OF DESIGNATED PROJECT)
B
( )

Hereunder is the description of the designated project mentioned in Part A of this further environmental permit:

A 部 :

Title of Designated Project

Essential Public Infrastructure Works Associated with West Rail Stations Eastern Access Road, Yuen Long
[This designated project is hereinafter referred to as "the Project"]

西
[
" "]

Nature of Designated Project

Road to connect West Rail Kam Tin Station.

西

Location of Designated Project

The locations of the road project are shown in Figure 1 in this Permit.

圖 1

Scale and Scope of Designated Project(s)

The Project involves the operation of primarily at-grade Eastern Access Road and two bridges over the two branches of the drainage channels. The extents and limit of the Project are shown in Fig. 1 of this permit and consist of the operation of a dual two-lane carriageway (the "Eastern Access Road, Yuen Long") of approximately 0.85 kilometres in length connecting the West Rail Kam Sheung Road Station and Kam Tin Bypass.

0.85 (" ") 西 圖 1


C ( )

1.

1.1   ( 499)

1.2   ( ) ( 400 ) ( 311) ( 358) ( 466) ( 354)

1.3   許 可 證 持 有 人 須 印 製 本 許 可 證 的 複 本 , 連 同 本 許 可 證 所 述 的 所 有 文 件 或 本 許 可 證 A 部 所 述 文 件 , 以 供 署 長 或 其 授 權 人 員 任 何 時 間 內 在 許 可 證 持 有 人 的 辦 事 處 查 閱。 凡 提 述 本 許 可 證 , 須 包 括 本 許 可 證 所 述 的 所 有 文 件 和 登 記 冊 內 的 相 關 文 件 。 

1.4   B 部

1.5  

1.6   ( ) ( )

1.7   C 部 證。

1.8   稿

1.9  

1.10 130 27

1.11 4

2. 提 交 的 文 件 或

2.1   間,許 文的

(a) 沿 ( / ) 3 60 圖 2 860 920

(b) 沿 ( 擬 建 ) 2.5 80 圖 2 1029 1109

(c) 沿 ( 擬 建 西 ) 3 100 圖 2 1109 1209

(d) 沿 擬 建 3 20 圖 2 1080 1110

(e) 沿 擬 建 西 1 3 55 圖 2 1100 1155

(f) 沿 5.5 60 圖 2 2

(g) 沿 西 3 30 圖 3 5

(h)                圖 3 沿 西 西 擬 建 5 55

(i)  沿 ( / ) 5.5 150 圖 3 1300 1450

2.2    在 工 程 項 目 營 辦 前 , 許 可 證 持 有 人 須 通 知 署 長 已 安 裝 合 適 的 隔 音 窗 及 空 調 設 備 , 作 為 間 接 技 術 補 救 措 施 , 以 保 障 受 影 響 的 噪 音 感 應 強 地 方 - 錦 光 幼 稚 園 、 信 義 會 錦 上 教 會 及 吳 家 村 的 村 屋 。 在 環 評 報 告 表 15.3a內 , 這 些 受 影 響 的 噪 音 感 應 強 地 方 的 代 號 分 別 為 NSR71 NSR89 NSR90

2.3   ( )

2.4   2.3 ( )

2.5   18.3.3


1.     3 A 部( 許 可 證 主 要 部 分) B 部( 指 定 工 程 項 目 的 說 明 ) C 部( 許 可 證 條 件)

2.     13

3.     12

4.      14

5.     26(1) 2 I

6.     -

(i) 200 6

(ii) 500 2

(iii) 6 6

(iv) 100 1

(v) 10,000

7.     30 17

 

 

 


圖 1 | 圖 2 | 圖 3