Environmental Permit No. FEP-01/497/2015
環境許可證編號FEP-01/497/2015
ENVIRONMENTAL
IMPACT ASSESSMENT ORDINANCE
(CHAPTER
499)
環境影響評估條例
(第499章)
第10及 12條
FURTHER ENVIRONMENTAL PERMIT TO DECOMMISSION A DESIGNATED PROJECT
解除指定工程項目運作的新的環境許可證
A部
(許可證主要部分)
Pursuant to
Sections 10 & 12 of the Environmental Impact Assessment
Ordinance (the EIAO), the Director of Environmental Protection (the Director)
grants this further environmental permit to Leighton
Contractors (Asia) Limited (hereinafter referred to as the “Permit Holder”) to decommission the
designated project described in Part B subject to the
conditions specified in Part C. The issue of this further environmental permit is based on the documents, approvals or
permissions described below:
根據《環境影響評估條例》(環評條例)第10及12條的規定,環境保護署署長(署長)將本新的環境許可證批予禮頓建築(亞洲)有限公司(下稱“許可證持有人”) 以執行B部所說明的指定工程項目的解除運作,但須遵守C部所列明的條件。本新的環境許可證是依據下列文件、批准或許可而簽發:
Application
No. 申請書編號: |
FEP-169/2016 |
|
|||||
Document in the
Register: 登記冊上的文件: |
(1)
Decommissioning
of West Portion of the Middle Ash Lagoon at Tsang Tsui, Tuen Mun - Environmental
Impact Assessment (EIA) Report, EIA Executive Summary and Environmental
Monitoring and Audit (EM&A) Manual (Register No. AEIAR-186/2015)
[hereinafter referred to as the "EIA Report"] 屯門曾咀煤灰湖(中湖)西面部分的解除運作工程–環境影響評估(環評)報告、環評行政摘要及環境監察及審核手冊(登記冊編號:AEIAR-186/2015) [下稱 「環評報告」] |
|
|||||
|
(2)
The Director’s letter of approval of the
EIA report dated 28.1.2015
referenced (13) in EP2/N4/G/107 Pt.2 署長於2015年1月28日發出批准環評報告的信件,檔案編號 : (13)
in EP2/N4/G/107 Pt.2 |
|
|||||
|
(3)
Application for environmental permit received on 10.3.2015
(Application No. AEP-497/2015) 於2015年3月10日收到的環境許可證申請(申請書編號 AEP-497/2015) |
|
|||||
|
(4)
Environmental
permit
issued on 25.3.2015
(Environmental Permit No. EP-497/2015) 於2015年3月25日簽發的環境許可證申請(環境許可證編號 EP-497/2015) |
|
|||||
|
(5)
Application for further environmental permit submitted on 11.7.2016 (Application No. FEP-169/2016) 於2016年7月11日提交的新的環境許可證申請(申請書編號 FEP-169/2016) |
|
|||||
|
|
|
|
|
|
||
|
1
August
2016 2016年8月 1 日 |
|
|
||||
|
Date 日期 |
|
(C F WONG) Principal Environmental Protection Officer for Director of Environmental Protection 環境保護署署長 (首席環境保護主任黃傳輝代行) |
|
|||
PART B
(DESCRIPTIONS OF DESIGNATED PROJECTS)
B部 (指定工程項目的說明)
Hereunder is the
description of the designated projects mentioned in Part A
of this further environmental permit:
(hereinafter referred to as the “Permit”)
下列為本新的環境許可證(下稱”許可證”)A部所提述的指定工程項目的說明:
Title of
Designated Projects 指定工程項目的名稱 |
Decommissioning
of West Portion of the Middle Ash Lagoon at Tsang
Tsui, Tuen Mun [This Designated Project is hereafter referred as
“the Project”] 屯門曾咀煤灰湖(中湖)西面部分的解除運作工程 [本指定工程項目下稱「工程項目」] |
Nature of
Designated Projects |
Decommissioning of a Waste Disposal Facility for Pulverised Fuel
Ash 解除處置粉狀的燃燒灰的廢物處置設施的運作。 |
Location of
Designated Project 指定工程項目的地點 |
West Portion of the Middle Ash Lagoon at Tsang Tsui, Tuen Mun. The
location of the Project is shown in Figure
1 of this Permit. 屯門曾咀煤灰湖(中湖)西面部分。圖1顯示工程的位置。 |
Scale
and Scope of Designated Project(s) 指定工程項目的規模和範圍 |
Decommissioning of West Portion of the
Middle Ash Lagoon at Tsang Tsui, Tuen Mun as indicated in Figure 1. 解除如圖1所示的屯門曾咀煤灰湖(中湖)西面部分的運作。 |
C部 (許可證條件)
1. General
Conditions
一般條件
1.1
The Permit Holder and any person working
on the Project shall comply with all conditions set out in this Permit. Any
non-compliance by any person may constitute a contravention of the
Environmental Impact Assessment Ordinance (EIAO) (Cap.499) and may become the
subject of appropriate action being taken under the (EIAO).
許可證持有人及任何從事工程項目的人士必須完全符合本許可證載列的全部條件。任何人士如有不符合本許可證的情況,可能違反《環境影響評估條例》(環評條例)(第499章)的規定,而當局可根據環評條例採取適當行動。
1.2
The Permit Holder shall ensure full
compliance with all legislation from time to time in force including without
limitation to the Noise Control Ordinance (Cap.400), Air Pollution Control
Ordinance (Cap.311), Water Pollution Control Ordinance (Cap.358) and Waste
Disposal Ordinance (Cap.354),
Dangerous Goods (General) Ordinance (Cap. 295), Occupational Safety and Health
Ordinance (Cap. 509) and Factories and Industrial Undertakings Ordinance (Cap.
59).
This Permit does not of itself constitute any ground of defense against any
proceedings instituted under any legislation or imply any approval under any
legislation.
許可證持有人須經常確保完全符合現行法例的規定,包括但不限於《噪音管制條例》(第400章)、《空氣污染管制條例 》(第311章)、《水污染管制條例》(第358章)、《廢物處置條例》(第354章)、《危險品(一般)規例》(第295章)、《職業安全及健康條例》(第509章)及《工廠及工業經營條例》(第59章)。本許可證本身不會就根據任何法例提起的法律程序構成任何抗辯理由,或根據任何法例默示任何批准。
1.3
The Permit Holder shall make copies of
this Permit together with all documents referred to in this Permit and the documents referred to in Part A of the Permit readily available at all times for
inspection by the Director or his authorized officers at all sites/offices
covered by this Permit. Any reference to the Permit shall include all documents
referred to in the Permit and also the relevant documents in the EIAO Office.
許可證持有人須印製本許可證的複本,連同本許可證所述的所有文件及本許可證A部所述文件,以供署長或獲授權人員任何時間內在本許可證所涵蓋的所有工地/辦事處查閱。凡提述本許可證,須包括本許可證所述的所有文件及環評條例登記冊辦事處內的相關文件。
1.4
The Permit Holder shall give a copy of
this Permit to the person(s) in charge of the Project site(s) and ensure that
such person(s) fully understands all conditions and all requirements
incorporated in
the Permit. The site(s) refers to site(s) of the Project and shall mean the
same hereafter.
許可證持有人須把本許可證的一份複本交予工程項目工地的負責人,並確保這些人士完全明白本許可證的所有條件與規定。工地是指工程項目的工地,下文所提及的工地亦屬同一意思。
1.5
The Permit Holder shall display
conspicuously a copy of this Permit on the site(s) at all vehicular site
entrances/exits or at a convenient location for public information at all
times. The Permit Holder shall ensure that the most updated information about
the Permit, including any amended permit, is displayed at such locations. If
the Permit Holder surrenders a part or the whole of the Permit, the notice he
sends to the Director shall also be displayed at the same locations as the
original Permit. The suspended, varied or cancelled Permit shall be removed
from display at the site(s).
許可證持有人須在工地所有車輛進出口或一處方便地點,顯眼地展示本許可證的複本,以供公眾在任何時間內閱覽。許可證持有人須確保在這些地點展示關於本許可證(包括任何經修訂的許可證)的最新資料。許可證持有人如交回許可證的部分或全部,必須把其送交署長的通知書,在備有原有許可證的各處相同地點展示。遭暫時吊銷、更改或取消的許可證必須從工地除下,不再展示。
1.6
The Permit Holder shall decommission the
Project as described in Part B of this Permit.
許可證持有人須解除本許可證B部說明的工程項目的運作。
1.7
The Permit Holder shall ensure that the
Project is decommissioned in accordance with the information and
recommendations described in the EIA Report (Register no. AEIAR-186/2015); the application documents including all
attachments (Application No. AEP-497/2015), other
relevant documents in the Register; and the information or mitigation measures
described in this Permit, and mitigation measures to be recommended in
submissions that shall be deposited with or approved by the Director as a
result of permit conditions contained in this Permit; and mitigation measures
to be recommended under on-going surveillance and monitoring activities during
all stages of the Project. Where recommendations referred to in the documents
of the Register are not expressly referred to in this Permit, such
recommendations are nevertheless to be implemented unless expressly excluded or
impliedly amended in this Permit.
許可證持有人須確保工程項目按照下述資料解除運作:環評報告(登記冊編號:AEIAR-186/2015);申請文件包括所有附件(申請編號:AEP-497/2015)、登記冊內的其他相關文件;本許可證所說明的資料或緩解措施;根據本許可證內載的條件須向署長存放或獲署長批准的提交文件所建議的緩解措施;以及在工程項目各階段進行的持續監察及監測工作所建議的緩解措施。登記冊文件所述建議如沒有在本許可證明確表示,則仍須實施這些建議,除非獲本許可證明確豁除或默示修訂。
1.8
All deposited submissions, as required under this
Permit, shall be rectified and resubmitted in accordance with the comments, if
any, made by the Director within one
month of the receipt of the Director's comments or otherwise specified by the
Director.
所有按本許可證規定提交的存放文件,須在接獲署長的意見(如有者)後1個月內(除非署長另行指定),根據署長的意見加以修正及重新提交。
1.9
All submissions approved by the Director,
all submissions deposited without comments by the Director, or all submissions rectified in
accordance with comments by the Director under this Permit shall be construed
as part of the permit conditions described in Part C
of this Permit. Any variation of the submissions shall be approved by the
Director in writing or as prescribed in the relevant permit conditions. Any
non-compliance with the submissions may constitute a contravention of the EIAO (Cap. 499). All submissions or any
variation of the submissions shall be certified by the Environmental Team (ET)
Leader and verified by the Independent Environmental Checker (IEC) referred to
in Conditions 2.1 and 2.2 below, before submission to the Director under this
Permit.
署長批准的所有提交文件、署長沒有給予意見的所有存放文件、或根據本許可證規定由署長給予意見修正的所有提交文件,均須詮釋為本許可證C 部說明的許可證條件的一部分。提交文件如有任何修訂,均須獲署長的書面批准,或符合有關許可證條件訂明的規定。如有不符合提交文件的情況,則可能違反環評條例(第499章)的規定。所有提交文件或提交文件的任何修訂本,均須由下文條件第2.1及2.2項提及的環境小組組長核證並由獨立環境查核人核實,然後才按本許可證規定向署長提交。
1.10
The Permit Holder shall release all
finalized submissions as required under this Permit, to the public by
depositing copies in the EIAO
Register Office, or in any other places, or any internet websites as specified
by the Director, or by any other means
as specified by the Director for public inspection. For this purpose, the
Permit Holder shall provide sufficient copies of the submissions.
許可證持有人須把所有按本許可證規定提交的文件定稿公開給公眾人士知道,方法是把有關文件複本存放於環評條例登記冊辦事處,或署長指定的任何其他地方,或署長指定的任何互聯網網站,或署長指定的任何方法,以供公眾查閱。因此,許可證持有人須提供足夠數量的複本。
1.11
All submissions to the Director required
under this Permit shall be delivered either in person or by registered mail to
the EIAO Register Office (currently at
27/F, Southorn Centre, 130 Hennessy Road, Wanchai, Hong Kong). Electronic
copies of all finalized submissions required under this Permit shall be
prepared in Hyper Text Markup Language (HTML) (version 4.0 or later) and in
Portable Document Format (PDF version 4.0 or later), unless otherwise agreed by
the Director and shall be submitted at the same time as the hard copies.
本許可證規定向署長提交的所有文件,須親身送交或以掛號方式郵寄至環評條例登記冊辦事處(現址為:香港灣仔軒尼詩道130號修頓中心27樓)。所有按本許可證規定提交的文件定稿的電子版本,均須以超文本標示語言(HTML)(第4.0或較後版本)和便攜式文件格式(PDF)(第4.0或較後版本)製作,除非另獲署長同意,並須與硬複本同時提交。
1.12
The Permit Holder shall notify the Director
in writing the commencement date of the decommissioning works of the Project no
later than one month prior to the commencement of the decommissioning works of
the Project. The Permit Holder shall notify the Director in writing immediately
if there is any change of the commencement date.
許可證持有人須在工程項目的解除運作工程展開前,至少提早1個月以書面方式把工程項目解除運作工程的展開日期通知署長。展開日期如有任何更改,許可證持有人必須立即以書面方式通知署長。
1.13
For the purpose of this Permit,
“commencement of decommissioning works” does not include works related to site
clearance and preparation or other works as agreed by the Director.
為執行本許可證,「解除運作工程的展開」不包括有關工地清理和預備的工程,或署長同意的其他工程。
2. Specific
Conditions
特定條件
2.1 An Environmental Team (ET) shall be established by the Permit Holder
no later than two weeks before commencement of decommissioning of the Project.
The ET shall not be in any way an associated body of the Contractor or the Independent Environmental Checker (IEC) for the Project. The ET shall be headed by
an ET Leader. The ET leader shall be a person who has at least 7 years of
experience in environmental monitoring and auditing (EM&A) or environmental
management. The ET and the ET Leader shall be responsible for the
implementation of the EM&A programme in accordance with the requirements as
contained in the EM&A Manual of the Project. In addition, the ET
Leader shall be responsible for certifying the environmental acceptability of
permanent and temporary works, relevant design plans and submissions under this
Permit. The ET Leader shall keep a contemporaneous log-book of each and
every instance or circumstance or change of circumstances which may affect the
environmental impact assessment and each and every non-compliance with the
recommendations of the approved EIA Report (Register No. AEIAR-186/2015) and this Permit. The ET Leader shall notify the
IEC within one working day of the occurrence of any such instance or
circumstance or change of circumstances. The ET Leader’s log-book shall be kept
readily available for inspection by all persons assisting in supervision of the
implementation of the recommendations of the approved EIA Report (Register No.
AEIAR-186/2015) and this Permit or by the
Director or his authorized officers. Failure to maintain records in the
log-book, failure to discharge the duties of the ET Leader as defined in the
EM&A Manual or failure to comply with this Condition would entitle the
Director to require the Permit Holder by notice in writing to replace the ET
Leader. Failure by the Permit Holder to make replacement, or further failure to
keep contemporaneous records in the log-book despite the employment of a new ET
Leader may render the Permit liable to suspension, cancellation or variation.
在工程項目的解除運作工程展開前,許可證持有人須至少提早2星期成立一個環境小組。環境小組不得與工程項目的承辦商或獨立環境查核人有任何聯繫。環境小組須由一名環境小組組長帶領。環境小組組長須在環境監察及審核 (「環監」) 或環境管理方面至少有7年經驗。環境小組及環境小組組長須按工程項目的環監手冊內載的規定,執行環監計劃。此外,環境小組組長須核證永久及臨時工程在環境上的可接受程度、相關的設計圖則和根據本許可證提交的文件。環境小組組長須保存一本記錄冊,同時記載可能會影響環境影響評估的每宗事件、每種情況或每次情況變化以及每次不符合核准環評報告(登記冊編號:AEIAR-186/2015)的建議及本許可證的情況。環境小組組長須在發生任何類似事件、情況或情況變化後1個工作天內通知獨立環境查核人。存放環境小組組長的記錄冊的地方,須可供協助督導執行核准環評報告 (登記冊編號:AEIAR-186/2015) 的建議及本許可證的所有人士、署長或獲授權人員隨時查閱。環境小組組長如未能在記錄冊保存記錄、未能執行環監手冊所列明的環境小組組長職務或未能符合本條件的規定,署長有權以書面要求許可證持有人撤換環境小組組長。許可證持有人如未能安排人選替補,或在聘用新環境小組組長後仍未能在記錄冊保存同期的記錄,或會導致許可證遭暫時吊銷、取消或更改。
2.2 An IEC shall be
employed by the Permit Holder no later than two weeks before the commencement of decommissioning of the Project.
The IEC shall not be in any way an associated body of the Contractor or the ET
for the Project. The IEC shall be a person who has at least 7 years of
experience in EM&A or environmental management. The IEC shall be
responsible for duties defined in the EM&A Manual of the Project and shall audit
the overall EM&A programme, including the implementation of all
environmental mitigation measures, submissions required in the EM&A Manual,
and any other submissions required under this Permit. In addition, the IEC shall
be responsible for verifying the environmental acceptability of permanent and
temporary works, relevant design plans and submissions under this Permit. The
IEC shall verify the log-book(s) mentioned in Condition 2.1 of this Permit. The
IEC shall notify the Director by fax, within one working day of receipt of
notification from the ET Leader of each and every occurrence, change of
circumstances or non-compliance with the approved EIA Report (Register No.
AEIAR-186/2015) and this Permit, which might affect the
monitoring or control of adverse environmental impacts from the Project.
In case the IEC fails to so notify the Director of the same, fails to discharge
the duties of the IEC as defined in the EM&A Manual or fails to comply with
this Condition, the Director may require the Permit Holder by notice in writing
to replace the IEC. Failure to replace the IEC as directed or further failure
to so notify the Director despite employment of a new IEC may render the Permit
liable to suspension, cancellation or variation. Notification by the Permit
Holder is the same as notification by the IEC for the purpose of this
Condition.
在工程項目的解除運作工程展開前,許可證持有人須至少提早2星期聘用一名獨立環境查核人。獨立環境查核人不得與工程項目的承辦商或環境小組有任何聯繫。獨立環境查核人須在環監或環境管理方面至少有7年經驗。獨立環境查核人須執行工程項目環監手冊所列明的職務,以及審核整體環監計劃,包括實施所有環境緩解措施、提交環監手冊規定的文件,以及提交本許可證所要求的其他文件。此外,獨立環境查核人須核實永久及臨時工程在環境上的可接受程度、相關的設計圖則和根據本許可證提交的文件,並須核實本許可證條件第2.1項所述的記錄冊。在每次出現事故、情況變化或不符合核准環評報告 (登記冊編號:AEIAR-186/2015) 及本許可證的情況,而可能會妨礙工程項目所造成不良環境影響的監察或控制工作時,獨立環境查核人須在接獲環境小組組長通知後1個工作天內以傳真方式通知署長。 獨立環境查核人如未能通知署長有關情況、未能執行環監手冊所列明的獨立環境查核人職務或未能符合本條件的規定,署長可以書面要求許可證持有人撤換獨立環境查核人。如未能按指示撤換獨立環境查核人,或在聘用新獨立環境查核人後仍未能通知署長有關情況,則或會導致許可證遭暫時吊銷、取消或更改。為執行本條件,許可證持有人的通知等同獨立環境查核人的通知。
2.3 The Permit
Holder shall, no later than two weeks before the commencement of the decommissioning works of the Project, inform the
Director in writing the management organization of the main construction companies and/ or any form of joint ventures associated
with the Project. The submitted information shall include at least an
organization chart, names of responsible persons and their contact details.
許可證持有人在工程項目的解除運作工程展開前,須至少提早2星期把主要建造公司及/或以任何形式與工程項目相關的合營企業的管理架構,以書面通知署長。提交的資料須至少包括一份組織圖、負責人的姓名及聯絡資料。
2.4 The Permit Holder shall, no later than two weeks before the commencement of the
decommissioning works of the Project, deposit four hard copies and one
electronic copy of design drawing(s) of the Project with scale of 1:1000 to the Director. The design drawing(s) shall indicate the
project layout including the decommissioning areas, the access roads and the
surface drainage outfall system, etc.
許可證持有人在工程項目的解除運作工程展開前,須至少提早2星期向署長存放以1:1000比例繪製的工程項目設計圖則的4份硬複本及1份電子版本。該(等)設計圖則須顯示工程項目的規劃設計,包括解除運作範圍、通道及地面排水口系統等。
2.5 No pulverised fuel ash shall be disposed off-site unless
with the prior written approval of the Director.
除非事先獲得署長書面批准,否則不得在工地外處置粉狀的燃燒灰。
2.6 Before the
completion of the decommissioning works, no less than 1 metre thick of fill
materials shall be used to cover the
pulverised
fuel ash surface in the
decommissioning area.
在解除運作工程完成前,須使用不少於1米厚的填土物料覆蓋解除運作範圍內的粉狀的燃燒灰表面。
2.7 The
Permit Holder shall, no later than 2 weeks before the commencement of
decommissioning works of the project, deposit a Waste Management Plan to the Director.
The Plan shall include at least the overall framework of waste management and reduction,
breakdown(s) of waste statistic, plan(s) showing locations for segregation and
temporary storage of reusable recycled materials, including those fill materials for covering the decommissioning areas sourced from the public filling facilities.
許可證持有人在工程項目的解除運作工程展開前,須至少提早2星期向署長存放一份廢物管理計劃。該計劃須至少包括管理及減少廢物的整體框架、 廢物的分項統計數字、顯示用以分隔及臨時貯存可重用回收物料(包括來自公眾填土設施用以覆蓋解除運作範圍的填土物料)地點的圖則。
2.8 In
order to minimize ecological impacts especially the Little Grebe, in addition to the ecological monitoring
programme as specified in the EM&A Manual, the following mitigation measures shall be
implemented:
(a) Hoarding of not less than 2.4 m high shall be set up along the boundary of site area between the Middle and West Ash Lagoons, and between
the northern edge of the site area and the water channel north of the site area so as to minimize disturbance to the
Little Grebe during the decommissioning works.
(b) Any construction works in the water channel north of the site area shall
only be conducted within non-breeding season of Little Grebe, which is November
to March of a year unless with the prior written approval of the Director.
(c) In the event of
retaining structures and/ or slope stabilization along the edge of the water
channel north of the site area are carried out, the Permit Holder shall submit
the construction methodologies for
the Director’s approval at least one month before the commencement of any
construction works.
為了盡量減少生態影響,尤其是對小鸊鷉的影響,除了環監手冊指明的生態監測計劃外,亦須實施下列緩解措施:
(a)
須在煤灰湖中湖與西湖之間工地範圍沿工地界線以及在工地範圍北面邊緣與工地範圍以北水道之間設置不少於2.4米高的圍板,以在解除運作工程期間盡量減少對小鸊鷉的滋擾。
(b)
凡在工地範圍以北的水道進行任何建造工程,除非事先獲得署長書面批准,否則只能在小鸊鷉的非繁殖季節內(即一年中的11月至3月)進行。
(c)
假如在工地範圍以北的水道邊緣進行擋土構築物及/或斜坡穩固工程,許可證持有人須在任何建造工程展開前,至少提早1個月向署長提交建造方法,以供批准。
2.9 When the West
New Territories (WENT) Landfill Extension project is in operation, in order to minimize
the potential landfill gas hazard, site offices shall be raised clear of the ground with a
separation of at least 500mm and shall be provided with proper ventilation
system to keep the air within the confined area well ventilated.
當新界西堆填區擴展計劃運作時,為了盡量減少可能產生的堆填區沼氣危險,工地辦事處應加高至與地面至少有500毫米間距,並須設有適當通風系統,保持密閉區域內的空氣流通。
3.
Environmental Monitoring and Audit (EM&A) Requirements
環境監察及審核(環監)規定
3.1 The EM&A
programme shall be implemented in accordance with the procedures and requirements
as set out in the approved EM&A
Manual. Any changes to the EM&A requirements or programme shall be justified by the ET
Leader and verified by the IEC as conforming to the relevant requirements set out in the EM&A Manual
and shall seek the prior approval from the Director before implementation.
環監計劃須按照核准環監手冊所載程序及規定執行。環監規定或計劃如有更改,須由環境小組組長提出充分理由,並由獨立環境查核人核實,證明其符合環監手冊所載的相關規定,並須事先獲署長批准才可執行。
3.2 Four hard copies
and one electronic copy of the Baseline Monitoring Report, shall be submitted to the Director at least one month before the commencement of
decommissioning of the Project. The
submissions shall be certified by the ET Leader and verified by the IEC as
complying with the relevant requirements as
set out in the approved EM&A Manual
before submission to the Director. Additional copies of the submission shall be
provided upon request by the Director.
在工程項目的解除運作工程展開前,須至少提早1個月向署長提交基線監測報告的4份硬複本及1份電子版本。提交文件須由環境小組組長核證及獨立環境查核人核實,證明其符合核准環監手冊所載的相關規定,才可提交署長。如署長要求,則須提交文件的額外複本。
3.3 Four hard copies
and one electronic copy of the monthly EM&A Reports shall be submitted to
the Director within two weeks after the end of the reporting month. The monthly
EM&A Reports shall include a summary of all non-compliance with the
recommendations in the EIA Report or this Permit. The submissions shall be
certified by the ET Leader and verified by the IEC as complying with the relevant requirements as set out in sections in the approved EM&A Manual before submission to the
Director. Additional copies of the submission shall be provided upon request by
the Director.
在提交報告的月份結束後2星期內,須向署長提交每月環監報告的4份硬複本及1份電子版本。每月環監報告須包括各種不符合環評報告所載建議或本許可證情況的摘要。有關的報告須由環境小組組長核證及獨立環境查核人核實,證明符合核准環監手冊各節所載的相關規定,才可提交署長。如署長要求,則須提交文件的額外複本。
3.4 All environmental
monitoring and audit results submitted under this Permit shall be true, valid
and correct.
根據本許可證提交的所有環境監察及審核結果,均須有效及真實無誤。
3.5 Any necessary
remedial measures and actions as described in the approved EM&A Manual shall be fully
and properly carried out, in accordance with the time frame(s) set out in the approved EM&A Manual, or as
agreed by the Director.
核准環監手冊所說明的任何必需的補救措施及行動,必須按照核准環監手冊所載或署長同意的時限徹底及妥善執行。
4. Electronic
Reporting of EM&A Information
環監資料的電子匯報
4.1 To facilitate
public inspection of the Baseline Monitoring Report and the monthly EM&A
Reports via the EIAO Internet Website and at the EIAO Register Office,
electronic copies of these Reports shall be prepared in the Hyper Text Markup
Language (HTML) (version 4.0 or later) and in Portable Document Format (PDF
version 4.0 or later), unless otherwise agreed by the Director and shall be
submitted at the same time as the hard copies as described in Conditions 3.2
and 3.3 of this Permit. For the HTML version, a content page capable of
providing hyperlink to each section and sub-section of these Reports shall be
included in the beginning of the document. Hyperlinks to all figures,
drawings and tables in these Reports shall be provided in the main text from
where the respective references are made. All graphics in these Reports
shall be in interlaced GIF format unless otherwise agreed by the Director. The
content of the electronic copies of these Reports must be the same as the hard
copies.
為方便公眾透過環評條例互聯網網站及在環評條例登記冊辦事處查閱基線監測報告及每月環監報告,以超文本標示語言 (HTML) (第4.0或較後版本) 及便攜式文件格式 (PDF) (第4.0或較後版本) 製作的這些報告的電子版本,除非另獲署長同意,須與本許可證上文條件第3.2及3.3項所說明的硬複本同時提交。關於HTML的版本方面,可與這些報告各節及小節作出超文本連結的目錄須在文件開端加入。報告內各類圖表須在載有相關資料的正文內作出超文本連結。除非另獲署長同意,報告內所有圖形均須以交錯存取的GIF格式制定。報告的電子版本內容,必須與硬複本的內容一致。
Notes :
註:
1. This
Permit consists of three parts, namely, PART A (Main
Permit), PART B (Description of Designated Project) and PART C (Permit Conditions). Any person relying on this permit
should obtain independent legal advice on the legal implications under the
Ordinance, and the following notes are for general information only.
本許可證共有3部,即A部 (許可證主要部分);B部 (指定工程項目的說明) 及C部 (許可證條件)。任何援引本許可證的人士須就環評條例的法律含意徵詢獨立法律意見,下述註解只供一般參考用。
2. If
there is a breach of any conditions of this Permit, the Director or his
authorized officer may, with the consent of the Secretary for the Environment,
order the cessation of associated work until the remedial action is taken in
respect of the resultant environmental damage, and in that case the Permit
Holder shall not carry out any associated works without the permission of the Director
or his authorized officer.
如違反本許可證的任何條件,署長或獲授權人員徵得環境局局長的同意後可勒令停止相關工程,直至許可證持有人為所造成的環境損害採取補救行動為止。在此情況下,許可證持有人未經署長或獲授權人員同意,不得進行任何相關工程。
3. The
Permit Holder may apply under Section 13 of the Environmental Impact Assessment
Ordinance (the “Ordinance”) to the Director for a variation of the conditions
of this Permit. The Permit Holder shall replace the original permit displayed
on the Project site by the amended permit.
許可證持有人可根據環評條例第13條的規定向署長申請更改本許可證的條件。許可證持有人須把經修改的許可證替換在工程項目工地內展示的原有許可證。
4. A
person who assumes the responsibility for the whole or a part of the Project
may, before he assumes responsibility of the Project, apply under Section 12 of
the Ordinance to the Director for a further environmental permit.
承擔工程項目整項或部分工程的責任的人,在承擔責任之前,可根據環評條例第12條的規定向署長申請新的環境許可證。
5. Under
Section 14 of the Ordinance, the Director may with the consent of the Secretary
for the Environment, suspend, vary or cancel this Permit. The suspended, varied or cancelled
Permit shall be removed from display at the Project site.
根據環評條例第14條的規定,署長可在環境局局長的同意下暫時吊銷、更改或取消本許可證。遭暫時吊銷、更改或取消的許可證必須從工程項目工地除下,不再展示。
6. If
this Permit is cancelled or surrendered during decommissioning of the Project,
another environmental permit must be obtained under the Ordinance before the
Project could be continued. It is an offence under Section 26(1) of the
Ordinance to decommission a designated project listed in Part II of Schedule 2
of the Ordinance without a valid environmental permit.
如果本許可證在工程項目解除運作期間取消或交回,則在繼續進行工程項目之前,必須先根據環評條例規定取得另一份環境許可證。根據環評條例第26(1)條的規定,任何人在沒有有效環境許可證的情況下解除環評條例附表2第II部所列明的指定工程項目的運作,即屬犯罪。
7. Any
person who decommissions the Project contrary to the conditions in the Permit,
and is convicted of an offence under the Ordinance, is liable: -
(i) on a first
conviction on indictment to a fine of $ 2 million and to imprisonment for
6 months;
(ii) on a second or subsequent conviction on
indictment to a fine of $ 5 million and to imprisonment for 2 years;
(iii) on a first summary
conviction to a fine at level 6 and to imprisonment for 6 months;
(iv) on a second or
subsequent summary conviction to a fine of $1 million and to imprisonment for 1
year; and
(v) in any case
where the offence is of a continuing nature, the court or magistrate may impose
a fine of $ 10,000 for each day on which he is satisfied the offence continued.
如任何人在違反本許可證的條件下解除工程項目的運作,根據環評條例,即屬犯罪-
(i) 一經循公訴程序首次定罪,可處罰款200萬元及監禁6個月;
(ii) 一經循公訴程序第二次或其後每次定罪,可處罰款500萬元及監禁2年;
(iii) 一經循簡易程序首次定罪,可處第6級罰款及監禁6個月;
(iv) 一經循簡易程序第二次或其後每次定罪,可處罰款100萬元及監禁1年;及
(v) 在任何情況下如該罪行屬連續性質,法院或裁判官可就其信納該罪行連續的每一天另處罰款10,000元。
8.
The
Permit Holder may appeal against any condition of this Permit under Section 17
of the Ordinance within 30 days of receipt of this Permit.
許可證持有人可在接獲本許可證後30天內,根據環評條例第17條就本許可證的任何條件提出上訴。
9.
The
Notes are for general reference only and that the Permit Holder should refer to
the EIA Ordinance for details and seek independent legal advice.
上述註解只供一般參考用,欲知有關詳情,許可證持有人須參閱環評條例及徵詢獨立法律意見。
10.
Occupational
health and safety issues are governed by Occupational Safety and Health
Ordinance (Cap. 509) and Factories and Industries Undertaking Ordinances (Cap.
59). The Permit Holder is advised
to contact Labour Departments for requirements relating to occupational safety
and health issues.