Environmental Permit No. EP-482/2013/D
環境許可證編號  EP-482/2013/D


Link to Project EIA
Information

項目環評資料連結     

ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)

SECTIONS 10 AND 13

 

環境影響評估條例

(499)

1013

 

ENVIRONMENTAL PERMIT TO OPERATE

A DESIGNATED PROJECT

 

營辨指定工程項目的環境許可證

 

PART A (MAIN PERMIT)

A (許可證主要部分)

 

Pursuant to Section 10 of the Environmental Impact Assessment Ordinance (EIAO), the Director of Environmental Protection (the Director) grants the Environmental Permit (No. EP-482/2013) to the Highways Department (hereinafter referred to as the "Permit Holder") on 9 December 2013. Pursuant to Section 13 of the Ordinance, the Director amends the Environmental Permit No. EP-482/2013/C based on the Application No. VEP-636/2024. The amendments, described below, are incorporated into this Environmental Permit No. EP-482/2013/D. This Environmental Permit as amended is for the operation of the designated project described in Part B subject to the conditions specified in Part C. The issue of this environmental permit is based on the documents, approvals or permissions described below:

 

根據《環境影響評估條例》(環評條例)10條的規定,環境保護署署長(署長) 2013129日將環境許可證(編號EP-482/2013)批予路政署(下稱 許可證持有人”)。根據條例第13條的規定,署長因應更改環境許可證的申請編號VEP-636/2024修訂環境許可證編號EP-482/2013/C。以下修訂已包含在本環境許可證編號EP-482/2013/D內。本經修訂的環境許可證作為營辨本許可證B部所說明的指定工程項目,但須遵守C部所列明的條件。本環境許可證的發出,乃以下表所列的文件、批准或許可作為根據:

 

Application No.

申請書編號

VEP- 636/2024

Document in the Register :

登記冊上的文件:

 

1.       Central - Wan Chai Bypass and Island Eastern Corridor Link (Register No.: AEIAR-041/2001)

-          Environmental Impact Assessment Report (July 2001)
[Hereinafter referred to as "the CWB&IECL EIA Report"]

-          Environmental Monitoring and Audit Manual

-          Executive Summary

 

2.       The Director’s letter of approval of the CWB&IECL EIA Report dated 31 August 2001 referenced (19) in Ax(2) to EP2/H4/A/10 II.

 

3.       Wan Chai Development Phase II and Central-Wan Chai Bypass (Register No.: AEIAR-125/2008)

-          Environmental Impact Assessment Report (December 2007)
[Hereinafter referred to as “the WDII&CWB EIA Report”]

-          Environmental Monitoring and Audit Manual

-          Executive Summary

-          Further information received from the Civil Engineering and Development Department on 11 March 2008, 9 April 2008 and 14 November 2008 under Section 8(1) of the Environmental Impact Assessment Ordinance

 

4.       The Director’s letter of approval of the WDII&CWB EIA Report dated 11 December 2008 referenced (85) in EP2/H4/S3/15 Pt.2.

 

5.       Application for Environmental Permit and attachments submitted by the Permit Holder on 27 July 2009 (Application No.: AEP-364/2009)

 

6.       Environmental Permit (No. EP-364/2009) issued on 17 August 2009

 

7.       Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 28 July 2010 (Application No. VEP-321/2010)

 

8.       Environmental Permit (No. EP-364/2009/A) issued on 4 August 2010

 

9.       Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 31 August 2012 (Application No. VEP-374/2012)

 

10.    Environmental Permit (No. EP-364/2009/B) issued on 20 September 2012

 

11.    Application for Environmental Permit and attachments submitted by the Permit Holder on 15 November 2013 (Application No.: AEP-482/2013)

 

12.    Environmental Permit (No. EP-482/2013) issued on 9 December 2013

 

13.    Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 7 December 2016 (Application No. VEP-511/2016)

 

14.    Environmental Permit (No. EP-482/2013/A) issued on 22 December 2016

 

15.    Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 17 September 2019 (Application No. VEP-564/2019)

 

16.    Environmental Permit (No. EP-482/2013/B) issued on 10 October 2019

 

17.    Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 27 March 2020 (Application No. VEP-573/2020)

 

18.    Environmental Permit (No. EP-482/2013/C) issued on 22 April 2020

 

19.    Application documents for Variation of Environmental Permit including all attachments submitted by the Permit Holder on 28 March 2024 (Application No. VEP-636/2024)

 

 

1.       中環及灣仔繞道和東區走廊連接路設計及建築工程 (登記冊編號: AEIAR─041/2001)

-          環境影響評估報告 (20017) [下稱「CWB&IECL環評報告」]

-          環境監察審核手冊

-          行政摘要

 

2.       署長於2001 831日發出CWB&IECL環評報告的批准信,檔案編號: (19) in Ax(2) to EP2/H4/A/10 II 

 

3.       灣仔發展計劃第二期及中環灣仔繞道 (登記冊編號: AEIAR-125/2008)

·         環境影響評估報告 (200712) [下稱「WDII&CWB環評報告」]

·         環境監察審核手冊

·         行政摘要

·         土木工程拓展署根據條例第8.(1)條於200831120084920081114所提交的進一步資料

 

4.       署長於2008 1211日發出批准WDII&CWB環評報告的信,檔案編號: (85) in EP2/H4/S3/15 Pt. 2

 

5.       許可證持有人於2009 7 27 日提交的環境許可證申請文件及附件(申請書編號: AEP-364/2009)

 

6.       已簽發的環境許可證 (編號 : EP-364/2009) 2009 8 17日簽發

 

7.       許可證持有人於2010 728提交的更改環境許可證申請文件包括所有附件(申請書編號VEP-321/2010)

 

8.       已簽發的環境許可證 (編號 : EP-364/2009/A) 2010 8 4日簽發

 

9.       許可證持有人於2012 831提交的更改環境許可證申請文件包括所有附件(申請書編號VEP-374/2012)

 

10.    已簽發的環境許可證 (編號 : EP-364/2009/B) 2012 9 20日簽發

 

11.    許可證持有人於2013 1115日提交的環境許可證申請文件及附件(申請書編號: AEP-482/2013)

 

12.    已簽發的環境許可證 (編號 : EP-482/2013) 2013 12 9日簽發

 

13.    許可證持有人於2016127日提交的更改環境許可證申請文件包括所有附件(申請書編號VEP-511/2016)

 

14.    已簽發的環境許可證 (編號 : EP-482/2013/A) 2016 12 22日簽發

 

15.    許可證持有人於2019917日提交的更改環境許可證申請文件包括所有附件(申請書編號VEP-564/2019)

 

16.    已簽發的環境許可證 (編號 : EP-482/2013/B) 2019 10 10日簽發

 

17.    許可證持有人於2020327日提交的更改環境許可證申請文件包括所有附件(申請書編號VEP-573/2020)

 

18.    已簽發的環境許可證 (編號 : EP-482/2013/C) 2020 4 22日簽發

 

19.    許可證持有人於2024328日提交的更改環境許可證申請文件包括所有附件(申請書編號VEP-636/2024)

 

 

 

Application No.

申請書編號

 

Date of Application

申請日期

 

List of Amendments Incorporated into this Environmental Permit

已包含在本環境許可證內修訂項目

 

 

Date of Amendment

修訂日期

VEP-511/2016

 

7 December 2016

2016127

 

Amend Condition 2.6 and Table 1b of EP-482/2013 to reflect the newly adoption of air purification system and latest detailed designs of the Central Ventilation Building (CVB).

 

更改環境許可證編號EP-482/20132.6項條件及表1b,以反映採用新空氣淨化系統及中通風大樓最新詳細設計

 

22 December 2016

20161222

 

VEP-564/2019

 

17 September 2019

2019917

 

Amend Figure 1 & Figure 2a of EP-482/2013/A in Part C.

更改環境許可證編號EP-482/2013/A圖1圖2a.

 

Amend Condition 2.3, 2.10 and 2.11 of EP-482/2013/A in Part C.

更改環境許可證編號EP-482/2013/A2.32.10 2.11 項條件

 

10 October 2019

20191010

 

VEP-573/2020

 

27 March 2020

2020327

 

Amend Condition 2.11, Figure 2d, 2e, 2f & 2g of this Permit of EP-482/2013/B to reflect the latest design of absorptive panel in green color on the lower parts of Eastbound noise barriers and Westbound noise enclosures in Island Eastern Corridor Link.

更改環境許可證編號EP-482/2013/B2.11項條件圖2d圖2e圖2f圖2g以反映在東區走廊連接路東西行線的半密封式隔音罩及隔音屏下半部最新擬建的綠色吸音板設計

 

 

22 April 2020

20204 22

VEP-636/2024

 

28 March 2024

2024328

 

Amend Condition 2.6 in Part C of the Environmental Permit No. EP-482/2013/C

更改環境許可證編號EP-482/2013/C C部的第2.6項條件

 

 

April 2024

20244   

 

 

 

 

 

  April 2024

2024 4   

 

Date

日期

 

(Queenie Y.C. NG)

Acting Principal Environmental Protection Officer

for Director of Environmental Protection

環境保護署署長

(署理首席環境保護主任 吳沅清 代行)


PART B (DESCRIPTION OF DESIGNATED PROJECT)

B (指定工程項目的說明)

 

Hereunder is the description of the designated project mentioned in Part A of this environmental permit (hereinafter referred to as “the Permit”):

下列為本環境許可證(下稱許可證”)A部所提述的指定工程項目的說明:

 

Title of Designated Project

指定工程項目的名稱

 

Central – Wan Chai Bypass (CWB) including its Road Tunnel and Slip Roads

(This designated project is hereafter referred to as “the Project”)

 

中環灣仔繞道,包括其行隧道及連接路

(本指定工程項目下稱工程項目”)

Nature of Designated Project

指定工程項目的性質

 

Operation of a trunk road and its road tunnel more than 800m in length between portals.

 

營運一條主幹道及其入口之間的長度超過800的行車隧道。

Location of Designated Project

指定工程項目的地點

 

 

From Central to North Point, Hong Kong.

The location of the Project is shown in Figure 1 of this Permit.

 

由香港中環角。

工程項目的地點展示於本許可證圖1內。

 

Scale and Scope of Designated Project

指定工程項目的規模和範圍

Operation of

·              a dual three-lane trunk road, approximately 4.5 km in length, and tunnel approximately 3.7 km in length defined from the connection with the existing Rumsey Street Flyover in Central, through to a connection with the existing Island Eastern Corridor to the east of the Causeway Bay Typhoon Shelter(CBTS);

·              the Central Interchange near the Rumsey Street Flyover to provide road connections to the Central area;

·              tunnel control buildings and ventilation buildings;

·              slip roads to connect the CWB to the local road system in the Wan Chai North and Causeway Bay area;

·              associated road lighting, road signing, traffic control and surveillance system; and

·              other associated works.

 

營運

·              一條從現有的中環林士街天橋交接處,伸展至銅鑼灣避風塘東面的現有東區走廊交接處,約長4.5公里的三線雙向行車道路及約長3.7公里的隧道;

·              在現有的中環林士街天橋附近,用以連接中環區其他道路的中環交匯處;

·              隧道管理大樓及通風大樓;

·              連接主幹道與灣仔北和銅鑼灣地區現有道路的連接道;

·              相關的道路照明、道路標誌和交通管制及監察系統;

·            其他相關工程。   

 


P
C部(許可證條件)

 

1.         一般條件
   

1.1               許可證持有人及任何從事工程項目的人士必須完全符合本許可證載列的全部條件。任何人士如有不符合本許可證的情況,可能違反《環境影響評估條例》(第499章)的規定,而當局可根據條例採取適當行動。

1.2               許可證持有人須經常確保完全符合現行法例的規定,包括但不限於《空氣污染管制條例 》(第311章)、《噪音管制條例》(第400章)及《廢物處置條例》(第354章)。本許可證本身不會就根據任何法例提起的法律程序構成任何抗辯理由,或根據任何法例默示任何批准。

1.3               許可證持有人須印製本許可證的複本,連同本許可證所述的所有文件及本許可A部所述文件,以供署長或獲授權人員任何時間內在本許可證所涵蓋的所有工地/辦事處查閱。凡提述本許可證,須包括本許可證所述的所有文件及登記冊內的相關文件。

1.4               許可證持有人須把本許可證的一份複本交予營辦工程項目的負責人,並確保這些人士完全明白本許可證的所有條件與規定。

1.5               許可證持有人須依據本許可證B部的說明,營辦工程項目。

1.6              許可證持有人須確保工程項目按照下述資料營辦:本許可證A部所述核准的CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)及核准的WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)所說明的有關資料及各項建議;環境許可證編號EP-364/2009;更改環境許可證EP-364/2009的申請文件;本環境許可證的申請文件,包括許可證持有人呈交的所有附件(申請書編號:AEP-482/2013);登記冊內的其他相關文件;本許可證所說明的資料或緩解措施;根據本許可證內載的條件須向署長存放或獲署長批准的提交文件所建議的緩解措施;以及在工程項目各階段進行的持續監察及監測工作所建議的緩解措施。登記冊內的文件所述建議如沒有在本許可證明確表示,則仍須實施這些建議,除非獲本許可證明確豁除或默示修訂。

1.7               所有按本許可證規定提交的存放文件,須在接獲署長的意見(如有者)後1個月內(除非署長另行指定),根據署長的意見加以修正及重新提交。

1.8               署長批准的所有提交文件、署長沒有給予意見的所有存放文件、或根據本許可證規定由署長給予意見修正的所有提交文件,均須詮釋為本許可證C部說明的許可證條件的一部分。提交文件如有任何修訂,均須獲署長的書面批准,或符合有關許可證條件訂明的規定。如有不符合提交文件的情況,則可能違反《環境影響評估條例》(第499章)的規定。所有提交文件或提交文件的任何修訂本,均須由下文條件第2.1及2.2項所述的環境小組組長核證及獨立環境查核人核實,然後才按本許可證規定向署長提交。

1.9               許可證持有人須把所有按本許可證規定提交的文件定稿公開給公眾人士知道,方法是把有關文件複本存放於環境影響評估條例登記冊辦事處,或署長指定的任何其他地方,或署長指定的任何互聯網網站,或署長指定的任何方法,以供公眾查閱。因此,許可證持有人須提供足夠數量的複本。

1.10           本許可證規定向署長提交的所有文件,須親身送交或以掛號方式郵寄至環境影響評估條例登記冊辦事處(現址為:香港灣仔軒尼詩道130號修頓中心27樓)。所有按本許可證規定提交的文件定稿的電子版本,均須以超文本標示語言(HTML)(第4.0或較後版本)和便攜式文件格式(PDF)(第4.0或較後版本)製作,除非另獲署長同意,並須與硬複本同時提交。

1.11           許可證持有人須在工程項目開始營辦前,至少提早1個月以書面方式把工程項目開始營辦的日期通知署長。開始營辦的日期如有任何更改,許可證持有人必須立即以書面方式通知署長。

 

2                     特定條件

工程項目營運前及期間須提交的文件或採取的措施

聘用環境監察及審核(環監)人員

2.1               許可證持有人須成立一個環境小組,該小組須由環境小組組長帶領。環境小組組長須在環監或環境管理方面至少有7年經驗。環境小組及環境小組組長須按核准的CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)及核准的WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)的環監手冊或本許可證所載的環監要求,執行環監計劃。環境小組組長須保存一本記錄冊,同時記載可能會影響核准的CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)及核准的WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)的評估結果或本許可證的每宗事件、每種情況或每次情況變化。這本記錄冊須可供協助督導執行核准的CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)及核准的WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)的建議及本許可證的所有人士、署長或獲授權人員隨時查閱。環境小組組長如未能在記錄冊保存記錄、未能執行環監手冊所列明的環境小組組長的職務,或未能符合本條件的規定,署長有權以書面要求許可證持有人撤換環境小組組長。許可證持有人如未能撤換環境小組組長,或在聘用新環境小組組長後仍未能在記錄冊保存同期的記錄,或會導致許可證遭暫時吊銷、取消或更改。環境小組不得與工程項目的承辦商或獨立環境查核人有任何聯繫。

 

2.2              許可證持有人須聘用一名獨立環境查核人。獨立環境查核人須在環監或環境管理方面至少有7年經驗。獨立環境查核人須執行按核准的CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)及核准的WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)的環監手冊所列明的職務,以及提交本許可證所要求的其他文件。此外,獨立環境查核人須核實相關的設計圖則在環境上的可接受程度和根據本許可證提交的文件。獨立環境查核人須核實核准的CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)及核准的WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)的環監手冊或本許可證所述的記錄冊的同期記錄。在每次發生事件、出現情況變化或不符合核准的CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)及核准的WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)的建議或本許可證的情況,而可能會妨礙就不良環境影響而進行的監察或控制工作時,獨立環境查核人須在接獲環境小組組長通知後24小時內以傳真方式通知署長。獨立環境查核人如未能通知署長有關情況,未能執行環監手冊所列明的獨立環境查核人的職務,或未能符合本條件的規定,署長可以書面要求許可證持有人撤換獨立環境查核人。許可證持有人如未能按指示撤換獨立環境查核人,或在聘用新獨立環境查核人後仍未能通知署長有關情況,則或會導致許可證遭暫時吊銷、取消或更改。就本條件而言,許可證持有人的通知等同獨立環境查核人的通知。獨立環境查核人不得與工程項目的承辦商或環境小組有任何聯繫。

 

 

工程項目營運期間噪音影響的緩解措施

2.3              為緩解道路運作的交通噪音,下述隔音屏障及半密封式隔音罩須在相關路段完成後予以妥善保養。半密封式隔音罩及隔音屏障的位置及參考設計載於本許可證圖2a2b

 

(a)       約235米長的半密封式隔音罩,覆蓋東區走廊的西行連接路; ;

(b)       約230米長的半密封式隔音罩,覆蓋中環灣仔繞道及東區走廊東行和西行的主要行車道;;

(c)       約135米長、5.5米高的懸臂式隔音屏障(設有4.5米長傾斜45º的懸臂部分),設於往東區走廊的東行連接路;

(d)       約95米長、5.5米高的懸臂式隔音屏障(設有1米長傾斜45º的懸臂部分),設於往東區走廊的東行連接路;

(e)       約350米長、3.5米高的直立式隔音屏障,設於往東區走廊的東行連接路;以及

(f)   在鄰近北角油街綜合發展區內已規劃的噪音敏感受體入伙前,須設置約265米長的半密封式隔音罩,覆蓋東區走廊的西行連接路(見本許可證圖2a2b)。

2.4              為緩解道路運作的交通噪音,中環灣仔繞道車速限制為每小時70公里或以上的路段(中環灣仔繞道隧道內的路段及位於東面出入口觀景平台下的路段除外),須鋪設及妥善保養低噪音物料路面(見本許可證圖2b2c)。

 

2.5              為減低通風設施運作時產生的噪音,許可證持有人須為安裝於所有通風大樓的通風扇的消音器提供妥善保養。

 

為緩解營運期間空氣質素影響須提交的文件及採取的措施

2.6              為緩解通風大樓及其通風排氣口運作時可能產生的空氣質素影響,下列緩解措施須予以妥善運作及維持:

 

(a)       位於本許可證圖1所示位置的西面通風大樓,而西面通風大樓須遵照本許可證表1a所述的排氣設計準則;

(b)       位於本許可證圖1所示位置的中通風大樓,而中通風大樓須遵照本許可證表1b所述的排氣設計準則;

(c)       位於本許可證圖1所示位置的東面通風大樓及其排氣口,而東面通風大樓須遵照本許可證表1b所述的排氣設計準則;

(d)       須採用空氣淨化系統,包括去除塵埃效能至少達80%的靜電除塵系統,以減低可吸入懸浮粒子的水平,以及採用去除二氧化氮效能至少達80%的二氧化氮去除系統,以改善空氣質素,然後才經西面通風大樓、中通風大樓、東面通風大樓及其排氣口把空氣排放至大氣。

(e)       根據WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)第2.4.18段所說明,中環灣仔繞道隧道東面出入口的通風系統,須遵照廢氣零排放的設計。

如上文條件第2.6(a)至(e)的緩解措施設計有所改變,許可證持有人須在執行設計改變前,至少提早1個月向署長提交更改設計的4份硬複本及1份電子版本,以供批核。

2.7              許可證持有人須在工程項目開始營運前,至少提早3個月向署長提交空氣淨化系統驗收測試計劃的4份硬複本及1份電子版本,以供批核。有關計劃須提供上文條件第 2.6(d) 項所說明的空氣淨化系統的測試時間表及驗收測試方法,並須由環境小組組長核證及獨立環境查核人核實,證明符合許可證持有人提交的本環境許可證的申請文件,包括所有附件(申請書編號:AEP-482/2013)。  

 

2.8              許可證持有人須在工程項目開始營運前,至少提早1個月向署長存放空氣淨化系統驗收測試報告的4份硬複本及1份電子版本,該報告須由環境小組組長核證及獨立環境查核人核實,證明符合上文條件第2.6(d)項指明的去除塵埃及二氧化氮效能。

 

2.9              許可證持有人須在工程項目開始營運前,至少提早1個月就營辦工程項目向署長提交空氣質素監測計劃的4份硬複本及1份電子版本,該計劃須包含空氣淨化系統效能監察及應變計劃,並須由環境小組組長核證及獨立環境查核人核實,證明符合許可證持有人所提交的核准的WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)、核准的CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)及本環境許可證的申請文件(包括所有附件)(申請書編號:AEP-482/2013)所載的相關資料及建議。空氣質素監測計劃須包括監測核准的WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)、核准的CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)的環監手冊及事件/行動計劃所述的相關空氣質素參數的監測方法、設備、監測位置及標準。倘若本監測計劃下所監測到的空氣污染物水平超逾核准的標準,許可證持有人須完成調查,找出超逾標準的來源/原因,並在檢測超逾標準情況後的2個星期內,向署長提交調查報告以及補救行動建議。許可證持有人須按照存放的調查報告徹底及妥善執行建議的補救行動。

 

 

工程項目營運期間為緩解景觀及視覺影響須提交的文件及/或採取的措施

2.10          許可證持有人須根據環境許可證(許可證編號:EP-364/2009/B)條件第2.14項存放的景觀美化計劃的建議、WDII&CWB環評報告(登記冊編號:AEIAR-125/2008)表10.6及圖10.5、10.5A、10.5.1至10.5.5以及CWB&IECL環評報告(登記冊編號:AEIAR-041/2001)表7.5執行景觀及視覺影響緩解措施。許可證持有人須在相關景觀美化工程完成後1個月內或另獲署長同意下,向署長存放上述景觀美化計劃內的景觀及視覺影響緩解措施竣工圖的4份硬複本及1份電子版本,有關竣工圖須由環境小組組長核證及獨立環境查核人核實。在相關景觀美化工程完成後,有關景觀及視覺影響緩解措施須予以妥善維持。

 

2.11          許可證持有人須在下列措施完成後,妥善維持下列措施以紓緩道路交通半密封式隔音罩及隔音屏(見本許可證圖2d2e2f2g)的景觀及視覺影響:

 

(a)       在合適情況下,上半部為透明板、半透明板及/或附有半透明天窗的綠化頂部;以及

(b)       並在合適情況下,下半部為綠色吸音板。

 

在工程項目營運期間緩解對維多利亞公園使用人士造成的噪音及視覺影響的措施

 

2.12          在工程項目營運期間,為減輕連接路8(見本許可證圖1)對維多利亞公園使用人士造成的噪音及視覺影響,許可證持有人須按根據環境許可證(許可證編號:EP-364/2009/B)條件第2.16項提交的連接路8的額外緩解計劃妥善維持額外的噪音及視覺緩解措施,例如設計美觀的隔聲建築物。許可證持有人須在工程項目開始營運前,至少提早1個月向署長存放上述連接路8的額外緩解計劃內的噪音及視覺緩解措施竣工圖的4份硬複本及1份電子版本,有關竣工圖須由環境小組組長核證及獨立環境查核人核實。

 

 

註:

1.       本許可證共有3部,即A部(許可證主要部分);B部(指定工程項目的說明)及C部(許可證條件)。任何援引本許可證的人士須就環評條例的法律含意徵詢獨立法律意見,下述註解只供一般參考用。

 

2.       如違反本許可證的任何條件,署長或獲授權人員徵得環境及生態局局長的同意後可勒令停止相關工程,直至許可證持有人為所造成的環境損害採取補救行動為止。在此情況下,許可證持有人未經署長或獲授權人員同意,不得進行任何相關工程。

 

3.       許可證持有人可根據環評條例第13條的規定向署長申請更改本環境許可證的條件。許可證持有人須把經修改的許可證替換在建造工地內展示的原有許可證。

 

4.       承擔工程項目整項或部分指定工程項目的責任的人,在承擔責任之前,可根據環評條例第12條的規定向署長申請新的環境許可證。

 

5.       根據環評條例第14條的規定,署長可在環境及生態局局長的同意下暫時吊銷、更改或取消環境許可證。遭暫時吊銷、更改或取消的環境許可證必須從建造工地除下,不再展示。

 

6.       如果本許可證在工程項目建造期間取消或交回,則在繼續進行工程項目之前,必須先根據環評條例規定取得另一份環境許可證。根據環評條例第26(1)條的規定,任何人在沒有有效環境許可證的情況下建造或營辦環評條例附表2第I部所列明的指定工程項目,即屬犯罪。

 

7.       如任何人在違反本許可證的條件下建造工程項目,根據環評條例,即屬犯罪:-

(i)                 一經循公訴程序首次定罪,可處罰款200萬元及監禁6個月;

(ii)               一經循公訴程序第二次或其後每次定罪,可處罰款500萬元及監禁2年;

(iii)             一經循簡易程序首次定罪,可處第6級罰款及監禁6個月;

(iv)              一經循簡易程序第二次或其後每次定罪,可處罰款100萬元及監禁1年;及

(v)                在任何情況下如該罪行屬連續性質,法院或裁判官可就其信納該罪行連續的每一天另處罰款10,000元。

 

8.       許可證持有人可在接獲本許可證後30天內,根據環評條例第17條就本許可證的任何條件提出上訴。

 

9.       上述註解只供一般參考用,欲知有關詳情,許可證持有人須參閱環評條例及徵詢獨立法律意見。

 

Environmental Permit No. EP-482/2013/D

環境許可證編號  EP-482/2013/D



1a:          西面通風大樓的排氣設計準則(根據 CWB&IECL 環評報告(登記冊編號AEIAR-041/2001)的表3.9)*

 

 


最高排氣量
(立方米/秒)


排氣速度
(米/秒)


排氣口最低高度
(離地米數)


排氣方向


西面通風大樓**

 

420

8

15


垂直

 

 

註:           *            本表須與本許可證條件第2.6項及圖1一併閱讀。

                **        排氣口會設於西面通風大樓內。

 

 

 

1b          中通風大樓、東面通風大樓及其排氣口的排氣設計準則(根據 WDII&CWB 環評報告(登記冊編號 AEIAR-125/2008)的表3.11)*

 

 


排氣管橫切面面積 (平方米)


排氣速度
(米/秒)


中排氣口最低高度
(離地米數)


排氣方向


中通風大樓
**

80

8

17.5

垂直

 

東面通風大樓的排氣口***

94

8

16.25


向上傾斜45度(往海港方向排放)

 

註:        *         本表須與本許可證條件第2.6項及圖1一併閱讀。

            **        中通風大樓的排氣口會設於該大樓內。

            ***      東面通風大樓的排氣口會遠離該大樓,設於銅鑼灣避風塘東面防波堤上。

 

圖1 | 圖2a | 圖2b | 圖2c | 圖2d | 圖2e | 圖2f | 圖2g |


    ]      ]