Application No. / Permit No.
|
Project Title
|
Document Name
|
Hyperlink
|
|
|
|
Application for EIA Study Brief
|
|
|
|
ESB-244/2012
|
Proposed
Comprehensive Development with Wetland Enhancement (CDWE) at Nam Sang Wai and Lut Chau
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb244/esb244.pdf
|
|
|
|
|
|
ESB-243/2012
|
Decommissioning of
West Portion of the Middle Ash Lagoon at Tsang Tsui,
Tuen Mun
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb244/esb244.pdf
|
|
|
|
|
|
ESB-242/2012
|
Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-242.pdf
|
|
|
|
|
|
Application for Permission to Apply Directly for Environmental Permit
|
|
|
|
DIR-219/2012
|
MTR Tsim Sha Tsui
Station Carnarvon Road Subway and Entrances Modification Works
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir219/dir219.pdf
|
|
|
|
Application for Approval of EIA Report
|
|
|
|
Nil
|
|
|
|
Application for Environmental Permit
|
|
|
|
AEP-438/2012
|
Shatin to
Central Link - Tai Wai to Hung Hom
Section
|
Environmental Permit issued (EP-438/2012)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4382012.htm
|
|
|
|
AEP-437/2012
|
Shatin to
Central Link - Mong Kok
East to Hung Hom Section
|
Environmental Permit issued (EP-437/2012)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4372012.htm
|
|
|
|
AEP-436/2012
|
Shatin to
Central Link - Hung Hom to Admiralty Section
|
Environmental Permit
issued (EP-436/2012)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4362012.htm
|
|
|
|
Application for Variation of an Environmental Permit
|
|
|
|
VEP-357/2012
|
Central Police
Station Conservation and Revitalisation Project
|
Environmental Permit issued (EP-408/2011/B)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3572012.htm
|
|
|
|
VEP-356/2012
|
Sediment Removal at
Yim Tin Tsai (East) Fish Culture Zone
|
Environmental Permit issued (EP-419/2011/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3562012.htm
|
|
|
|
Application for Further Environmental Permit
|
|
|
|
FEP-130/2012
|
Black Point Gas Supply Project (First Phase)
|
Environmental Permit
issued (FEP-02/391/2010/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1302012.htm
|
|
|
|
Submission as required by Environmental Permit Condition - Design /
Environmental Submissions
|
|
|
|
EP-121/2002
|
Demolition of Kwai
Chung Incineration Plant
|
Waste Management Plan for Ground
Decontamination Works
|
http://www.epd.gov.hk/eia/english/register/aep/ep1212002_content.html
|
|
|
|
EP-313/2008/D
|
West Island Line
|
Baseline Monitoring Report Part15
|
http://www.epd.gov.hk/eia/english/register/index8/vep3332011.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape and visual Impact
Monitoring Result (No.20) (Sep 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape and visual Impact
Monitoring Result (No.19) (Aug 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape and visual Impact
Monitoring Result (No.18) (Jul 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape and visual Impact
Monitoring Result (No.17) (Jun 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape and visual Impact
Monitoring Result (No.16) (May 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape and visual Impact
Monitoring Result (No.15) (Apr 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Finalized Baseline Monitoring
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Finalized Baseline Monitoring
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-408/2011/A
|
Central Police Station
Conservation and Revitalisation Project
|
Detailed Cartographic Drawings
and Photographic Records
|
http://www.epd.gov.hk/eia/english/register/index8/vep3502011_content.html
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Wan Chai East(CWB Tunnel)
|
Noise Management Plan
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
Submission as required by Environmental Permit Condition - EM&A
Reports
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
- Island District
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station
at Lamma Extension
|
Monthly Environmental Monitoring
and Audit Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas
Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring
And Audit Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in
Southern Lantau
|
Monthly Environmental Monitoring
& Audit Report (Sep 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in
Southern Lantau
|
Monthly Environmental Monitoring
& Audit Report (Oct 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in
Southern Lantau
|
Monthly Environmental Monitoring
& Audit Report (Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Aug 2010) Revised pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Apr 2010) Revised Pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (May 2010) Revised Pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (July
2010) Revised Pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Jun 2010) Revised Pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Sep 2010) Revised Pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Oct 2010) Revised Pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Nov 2010) Revised Pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Dec 2010) Revised Pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Jan 2011) Revised Pages
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1
Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage
Treatment Works and Outfall
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
|
EP-394/2010
|
Development of a 100MW Offshore
Wind Farm in Hong Kong
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3942010_content.html
|
|
|
|
EP-394/2010
|
Development of a 100MW Offshore
Wind Farm in Hong Kong
|
Monthly EM&A Report (Jan
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3942010_content.html
|
|
|
|
FEP- 01/097/2001/C
|
Water Recreation Centre at
Penny's Bay (part & remaining part)
|
Monthly Environmental Monitoring
and Audit Report (No. 76)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
- North District
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Dec 2011 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
|
EP-400/2010
|
Major Restoration to the
Residence of Ip Ting-sz,
Lin Ma Hang Tsuen, Sha
Tau Kok, N.T.
|
Monthly EM&A Report (Nov
2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4002010_content.html
|
|
|
|
FEP-01/347/2009
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road -
Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai
Po to Lok Ma Chau Control
Point"
|
Monthly EM&A Report (Oct 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html
|
|
|
|
FEP-01/347/2009
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road -
Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai
Po to Lok Ma Chau Control
Point"
|
Monthly EM&A Report (Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road (Section
2 Lok Ma Chau Control
Point to Ng Tung River)
|
Monthly EM&A Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
FEP-03/347/2009
|
Construction of a Secondary Boundary Fence at
Sha Tau Kok
|
Monthly EM&A Report (Dec 2011 )
|
http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html
|
|
|
|
FEP-04/347/2009/A
|
Construction of a Secondary
Boundary Fence at Sha Tau Kok
(Remaining Section)
|
Monthly EM&A Report (Dec 2011
)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html
|
|
|
|
- Sai Kung
District
|
|
|
|
EP-134/2002/H
|
Fill Bank at Tseung
Kwan O Area 137
|
Quarterly Environmental
Monitoring and Audit Report (Sep 2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html
|
|
|
|
EP-134/2002/H
|
Fill Bank at Tseung
Kwan O Area 137
|
Monthly EM&A Report (Contract
No.: CV/2009/02) (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html
|
|
|
|
EP-134/2002/H
|
Fill Bank at Tseung
Kwan O Area 137
|
Monthly EM&A Report (Contract
No.: CV/2009/02) (Jan 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html
|
|
|
|
EP-319/2009/A
|
Development of a Biodiesel Plant
at Tseung Kwan O Industrial Estate
|
Quarterly Environmental
Monitoring & Audit Summary Report (Sep 2011 to Nov 2011) (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
|
EP-410/2010
|
Phase III Redevelopment of
The Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Monthly EM&A Report (Jan
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4102010_content.html
|
|
|
|
EP-410/2010
|
Phase III Redevelopment of The
Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4102010_content.html
|
|
|
|
- Sha Tin
District
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Monthly EM&A Report (Jan
2012)(DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
- Tai Po District
|
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in
Upper Tai Po River
|
Revised EM&A Report for Upper
Tai Po River (Oct 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in
Upper Tai Po River
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works,
Stage V
|
Quarterly Environmental and Audit
Summary Report (Oct to Dec 2011) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works,
Stage V
|
Quarterly Environmental and Audit
Report (Oct to Dec 2011) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Monthly EM&A Report (Jan
2012)(DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-324/2008
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Dec
2011) (Stage 1)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
|
- Tsuen Wan
District
|
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report(Jan 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS)
Stage 2A
|
EM&A Consolidated Monthly
report Nov.2011 (ver1.2)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
|
FEP- 01/097/2001/C
|
Water Recreation Centre at
Penny's Bay (part & remaining part)
|
Monthly Environmental Monitoring
and Audit Report (No. 76)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
- Tuen Mun District
|
|
|
|
EP-210/2005/A
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Monthly Environmental Monitoring
and Audit Report (CV/2009/02) (Jan 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
|
EP-210/2005/A
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Monthly Environmental Monitoring
and Audit Report (CV/2009/02) (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
|
EP-210/2005/A
|
Expansion and Extension of
Fill Bank at Tuen Mun
Area 38
|
Quarterly Environmental
Monitoring and Audit Report (Sep 2011 to Nov 2011)(CV/2009/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
|
EP-296/2007
|
Proposed Joint User Complex and
Wholesale Fish Market at Area 44 Tuen Mun
|
Quarterly Environmental
Monitoring & Audit Report (Nov 2011 to Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2962007_content.html
|
|
|
|
EP-321/2008
|
Upgrading of Pillar Point
Sewage Treatment Works
|
Monthly EM&A Report No.14
|
http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html
|
|
|
|
EP-334/2009
|
Sludge Treatment Facilities
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3342009_content.html
|
|
|
|
EP-391/2010
|
Black Point Gas Supply Project
(First Phase)
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3912010_content.html
|
|
|
|
EP-391/2010
|
Black Point Gas Supply Project
(First Phase)
|
Monthly EM&A Report (Jan
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3912010_content.html
|
|
|
|
FEP-01/334/2009/A
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3452011_content.html
|
|
|
|
FEP-01/334/2009/A
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Jan
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3452011_content.html
|
|
|
|
- Yuen Long District
|
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Dec 2011 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
|
EP-406/2010
|
TETRA Radio Base Station at Kai
Kung Leng Lam Tsuen Country
Park, Yuen Long, N.T.
|
4th Monthly Environmental Site
Audit Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4062010_content.html
|
|
|
|
FEP-01/347/2009
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road -
Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai
Po to Lok Ma Chau Control
Point"
|
Monthly EM&A Report (Oct 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html
|
|
|
|
FEP-01/347/2009
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road -
Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai
Po to Lok Ma Chau Control
Point"
|
Monthly EM&A Report (Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road (Section
2 Lok Ma Chau Control
Point to Ng Tung River)
|
Monthly EM&A Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
FEP-03/347/2009
|
Construction of a Secondary Boundary Fence at
Sha Tau Kok
|
Monthly EM&A Report (Dec 2011 )
|
http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html
|
|
|
|
FEP-04/347/2009/A
|
Construction of a Secondary
Boundary Fence at Sha Tau Kok
(Remaining Section)
|
Monthly EM&A Report (Dec 2011
)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html
|
|
|
|
- Kwai Tsing District
|
|
|
|
EP-121/2002/A
|
Demolition of Kwai
Chung Incineration Plant
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2842009_content.html
|
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS)
Stage 2A
|
EM&A Consolidated Monthly
report Nov.2011 (ver1.2)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
|
- Central & Western District
|
|
|
|
EP-273/2007
|
Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon
to Sai Ying Pun
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS)
Stage 2A
|
EM&A Consolidated Monthly
report Nov.2011 (ver1.2)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
EP-364/2009/A
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
EP-408/2011
|
Central Police Station
Conservation and Revitalisation Project
|
Monthly EM&A Report No.2
|
http://www.epd.gov.hk/eia/english/register/aep/ep4082011_content.html
|
|
|
|
EP-273/2007
|
Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon
to Sai Ying Pun
|
Monthly EM&A Report (Jan
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island
- Hong Kong West Drainage Tunnel
|
Quarterly EM&A Report (Oct to Dec 2011)
(DC/2007/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
FEP-01/275/2007/B
|
Drainage Improvement in Northern Hong
Kong Island - Hong Kong West Drainage Tunnel
|
Monthly EM&A Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai
Development Phase II and Central - Wan Chai Bypass
- North Point Reclamation
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Hong Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Wan Chai East
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass over
MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
- Wan Chai District
|
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS)
Stage 2A
|
EM&A Consolidated Monthly
report Nov.2011 (ver1.2)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
EP-364/2009/A
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works
at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report No.1
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works
at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report No.2
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island
- Hong Kong West Drainage Tunnel
|
Quarterly EM&A Report (Oct to Dec 2011)
(DC/2007/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
FEP-01/275/2007/B
|
Drainage Improvement in Northern Hong
Kong Island - Hong Kong West Drainage Tunnel
|
Monthly EM&A Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai
Development Phase II and Central - Wan Chai Bypass
- North Point Reclamation
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Hong Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Wan Chai East
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development
Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
- Eastern District
|
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS)
Stage 2A
|
EM&A Consolidated Monthly
report Nov.2011 (ver1.2)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning
of Cape Collinson Crematorium
|
Monthly EM&A Report (Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
|
|
- Southern District
|
|
|
|
EP-249/2006/A
|
Repositioning and Long Term
Operation Plan of Ocean Park
|
Monthly Environmental Monitoring
and Audit Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html
|
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS)
Stage 2A
|
EM&A Consolidated Monthly
report Nov.2011 (ver1.2)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong
Island - Hong Kong West Drainage Tunnel
|
Quarterly EM&A Report (Oct to Dec 2011)
(DC/2007/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
FEP-01/275/2007/B
|
Drainage Improvement in Northern Hong
Kong Island - Hong Kong West Drainage Tunnel
|
Monthly EM&A Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html
|
|
|
|
- Kowloon City District
|
|
|
|
EP-328/2009
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Sep
2011 to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3282009_content.html
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Jan
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
EP-337/2009
|
New Distributor Roads
Serving the Planned Kai Tak Development
|
Monthly EM&A Report(Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-399/2010/A
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3292011_content.html
|
|
|
|
- Kwun Tong
District
|
|
|
|
Nil
|
|
|
|
- Sham Shui Po District
|
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS)
Stage 2A
|
EM&A Consolidated Monthly
report Nov.2011 (ver1.2)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
|
- Wong Tai Sin District
|
|
|
|
Nil
|
|
|
|
- Yau Tsim Mong District
|
|
|
|
EP-399/2010/A
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3292011_content.html
|
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West
Kowloon
|
Monthly EM&A Report (Jan
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West
Kowloon
|
Monthly EM&A Report (Dec
2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|