Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the period between 16 Mar 2014
to 15 Apr 2014)
|
|
|
Application No. / Permit
No.
|
Project Title
|
Document Name
|
Hyperlink
|
|
|
Application for EIA Study
Brief
|
|
|
Nil
|
|
|
Application for Permission
to Apply Directly for Environmental Permit
|
|
|
DIR-235/2014
|
Drainage
Works at Mai Po
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir235/dir235.pdf
|
|
|
DIR-236/2014
|
Natural
Terrain Hazard Mitigation Works at Study Area 12NW-C/SA2, Sheung Yeung, Sai
Kung
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir236/dir236.pdf
|
|
|
Application for Approval
of EIA Report
|
|
|
EIA-220/2014
|
Proposed Residential Cum Passive
Recreation Development within "Recreation" Zone and
"Residential (Group C)" Zone at Various Lots in DD 104, Yuen
Long, N.T.
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2202014/Content%20Page_hyperlinked.htm
|
|
|
Application for
Environmental Permit
|
|
|
Nil
|
|
|
Application for Variation
of an Environmental Permit
|
|
|
VEP-429/2014
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Environmental Permit issued
(EP-324/2008/B)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4292014.htm
|
|
|
VEP-430/2014
|
West Island Line
|
Environmental Permit issued
(EP-313/2008/I)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4302014.htm
|
|
|
VEP-431/2014
|
Proposed Shooting
Range at Pillar Point
Valley Landfill
|
Environmental Permit issued
(EP-307/2008/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4312014.htm
|
|
|
VEP-432/2014
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Environmental Permit issued
(EP-438/2012/E)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4322014.htm
|
|
|
Application for Further Environmental
Permit
|
|
|
FEP-154/2014
|
Cyberport Development - Northern
Access Road
|
Environmental Permit issued
(FEP-01/065/2000/A )
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1542014.htm
|
|
|
Submission as required by
Environmental Permit Condition - Design / Environmental Submissions
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Fourth Weekly Impact
Water Quality Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-319/2009/C
|
Development of a
Biodiesel Plant at Tseung Kwan O Industrial Estate
|
emergency contingency
plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep3912013_content.html
|
|
|
EP-319/2009/C
|
Development of a
Biodiesel Plant at Tseung Kwan O Industrial Estate
|
emergency response plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep3912013_content.html
|
|
|
FEP-07/364/2009/A
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Landscape Plan (Rev. 3)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Impact Water Quality
Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Impact Water Quality
Monitoring Report(Zone A)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Impact Water Quality
Monitoring Report(Zone A) (Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Third Weekly Impact Water
Quality Monitoring Report(Zone A)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Proposal for Termination of TSP
Monitoring at CD6a
Harbourfront Horizon
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly Noise Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly Noise Report (Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and
Capping of Contaminated Sediment Disposal Facility to the South of The
Brothers
|
Monthly Progress Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
Submission as required by
Environmental Permit Condition - EM&A Reports
|
|
|
|
Island
District
|
Central
& Western District
|
|
|
|
|
North
District
|
Wan Chai
District
|
|
|
|
|
Sai Kung
District
|
Eastern
District
|
|
|
|
|
Sha Tin
District
|
Southern
District
|
|
|
|
|
Tai Po District
|
Kowloon
City District
|
|
|
|
|
Tsuen Wan
District
|
Kwun
Tong District
|
|
|
|
|
Tuen Mun
District
|
Sham Shui
Po District
|
|
|
|
|
Yuen Long
District
|
Wong Tai
Sin District
|
|
|
|
|
Kwai Tsing
District
|
Yau Tsim
Mong District
|
|
|
|
-
Island District
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental
Monitoring and Audit Report (No. 100)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental
Monitoring and Audit Report (No. 101)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Dec
2013)(HY/2012/07 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Jan
2014)(HY/2012/08 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Dec
2013)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines
(GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental
Monitoring And Audit Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines
(GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental
Monitoring And Audit Report (Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao
Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Dec
2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao
Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Dec
2013)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station
at Lamma Extension
|
Monthly Environmental
Monitoring and Audit Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station
at Lamma Extension
|
Monthly Environmental
Monitoring and Audit Report (Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report (Dec
2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report (Dec
2013)(HY/2011/09 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay,
Lantau
|
100th Monthly EM&A Report
(12 Dec 2013 to 11 Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Quarterly EM&A Report (Aug
to Oct 2013) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Monthly EM&A Report (Nov
2013) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Monthly EM&A Report (Dec
2013) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental
Monitoring & Audit Report (Nov 2013) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-229/2005
|
Development of SkyCity Golf
Course
|
Quarterly EM&A Report (Nov
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2292005_content.html
|
|
|
-
North District
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Quarterly EM&A Report (Sep
to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Monthly EM&A Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Dec
2013) (Stage 1)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Annual EM&A Review Report
(Nov 2012 to Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly Environmental
Monitoring and Audit Report (Nov 2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
-
Sai Kung District
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area
137
|
Quarterly
EM&A Report (Sep to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly
EM&A Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
FEP-02/428/2011/A
|
Drainage Diversion Works For
the Comprehensive Residential Development At Various Lots In DD227 &
DD229, Tai Po Tsai, Sai Kung
|
16th Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.16
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.17
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-410/2010/A
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Monthly EM&A
Report (Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3962013_content.html
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly EM&A
Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-448/2013
|
Natural Terrain Hazard
Mitigation Works at Study Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road,
Sai Kung
|
Monthly EM&A Report (Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
|
EP-485/2014
|
Asia Pacific Gateway (APG) - Tseung Kwan O
|
EM&A Manual(Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4852014_content.html
|
|
|
EP-02/410/2010/A
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Quarterly EM&A Report (Oct
to Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3972013_content.html
|
|
|
EP-435/2011
|
Sewerage Works at Pik Shui Sun
Tsuen
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html
|
|
|
-
Sha Tin District
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.16
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.17
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
-
Tai Po District
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Dec 2013) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Dec 2013) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Quarterly Environmental and
Audit Report (Oct to Dec 2013) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Quarterly Environmental and
Audit Report (Oct to Dec 2013) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Dec
2013) (DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in
Upper Tai Po River
|
Monthly EM&A Report (Nov
2013) (DC/2007/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-419/2011/A
|
Sediment Removal at Yim Tin
Tsai (East) Fish Culture Zone
|
Monthly Environmental
Monitoring and Audit Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3562012_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Dec
2013) (Stage 1)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Annual EM&A Review Report
(Nov 2012 to Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly Environmental
Monitoring and Audit Report (Nov 2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
- Tsuen Wan District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec 2013)(DC/2007/23,DC/2009/10,
DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
- Tuen Mun District
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping
Station
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping
Station
|
Monthly EM&A Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping
Station
|
Quarterly EM&A Report (Aug
to Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Dec
2013)(HY/2012/07 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Jan
2014)(HY/2012/08 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Dec
2013)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-226/2005
|
Development of an EcoPark in
Tuen Mun Area 38
|
Quarterly EM&A Report (Oct
2013 to Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2262005_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road Town
Centre Section
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road, Tuen Mun
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point Sewage
Treatment Works
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
-
Yuen Long District
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary
Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road
(Section 3)
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Monthly EM&A Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
-
Kwai Tsing District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
-
Central & Western District
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central - Wan
Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Dec 2013)
(HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jan
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-313/2008/H
|
West Island Line
|
Monthly EM&A Report (No.53)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4222013_content.html
|
|
|
FEP-01/122/2003
|
Central Reclamation Phase III
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0622003_content.html
|
|
|
-
Wan Chai District
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central - Wan
Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Dec
2013) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jan
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
-
Eastern District
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
19th Monthly EM&A Report (Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its road
tunnel and slip roads
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Dec
2013) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jan
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson
Crematorium
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-485/2014
|
Asia Pacific Gateway (APG) - Tseung Kwan O
|
EM&A Manual(Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4852014_content.html
|
|
|
EP-442/2012
|
EMSD Hong Kong
Workshop at Sheung On Street, Chai Wan
|
Monthly EM&A Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html
|
|
|
EP-442/2012
|
EMSD Hong Kong
Workshop at Sheung On Street, Chai Wan
|
Final Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html
|
|
|
-
Southern District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-485/2014
|
Asia Pacific Gateway (APG) - Tseung Kwan O
|
EM&A Manual(Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4852014_content.html
|
|
|
-
Kowloon City District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Dec
2013)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Dec
2013) (Version 2.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving
Kai Tak Development
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Dec
2013) (Version 2.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
19th Monthly EM&A Report (Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.16
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.17
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.16
(Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.17
(Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
-
Kwun Tong District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Dec
2013)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Dec
2013) (Version 2.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving
Kai Tak Development
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Dec
2013) (Version 2.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Quarterly EM&A
Report (Sep to Nov 2013)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Dec
2013)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Jan
2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Quarterly EM&A
Report (Oct to Dec 2013)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
-
Sham Shui Po District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec 2013)(DC/2007/23,DC/2009/10,
DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Dec
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
-
Wong Tai Sin District
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.16
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.17
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Dec
2013)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Dec
2013) (Version 2.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving
Kai Tak Development
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Dec
2013) (Version 2.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
-
Yau Tsim Mong District
|
|
|
EP-317/2009
|
Tsim Sha Tsui Station Northern
Subway
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T
in West Kowloon
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T
in West Kowloon
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.16
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.17
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.16
(Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.17
(Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
|
|
|
|
|
|
|