|
| |
|
|
|
Monthly Update of Documents
Uploaded
Documents
Uploaded to the EIAO Website
|
|
(for the period between 16 March 2021 to 15 April 2021)
|
|
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
|
|
Nil
|
|
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
|
|
DIR-283/2021
|
Rock Cavern Development for
Relocation of Public Works Central Laboratory Building
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/dir283/dir283.pdf
|
|
|
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
|
|
EIA-269/2021
|
Yuen
Long Barrage Scheme
|
EIA Reports
|
https://www.epd.gov.hk/eia/register/report/eiareport/eia_2692021/YLBS_EIA.htm
|
|
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
|
|
AEP-588/2021
|
Siu Ho Wan Station and Siu Ho Wan Depot Replanning
Works
|
Environmental
Permit issued (EP-588/2021)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5882021.htm
|
|
|
|
|
|
|
AEP-589/2021
|
Desilting Works at River Silver, Mui Wo
|
Environmental
Permit issued (EP-589/2021)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5892021.htm
|
|
|
|
|
|
|
AEP-590/2021
|
Sewage
Pumping Station for Public Housing Development at Long Bin
in Yuen Long
|
Environmental
Permit issued (EP-590/2021)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5902021.htm
|
|
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
|
|
VEP-588/2021
|
Development
of an EcoPark in Tuen Mun Area 38
|
Environmental
Permit issued (EP-226/2005/G)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5882021.htm
|
|
|
|
|
|
|
VEP-589/2021
|
Hong
Kong Offshore Wind Farm in Southeastern Waters
|
Environmental
Permit issued (FEP-01/341/2009/A)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5892021.htm
|
|
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
|
|
FEP-204/2021
|
Utilization
of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Environmental
Permit issued (FEP-01/470/2013)
|
https://www.epd.gov.hk/eia/register/permit/latest/fep2042021.htm
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
|
|
EP-533/2017
|
Sha Tin
Cavern Sewage Treatment Works
|
Baseline
Survey Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau
Ma Tei East (HY/2014/08)
|
Construction Noise Mitigation Measure Plan
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
EP-456/2013/A
|
Drainage Improvement Works at Ngong Ping
|
Baseline Noise Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control Point
and Associated Works
|
Ecological Monitoring Report for the Woodland Compensation Area (Dec
2020 to Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
EP-456/2013/A
|
Drainage Improvement Works at Ngong Ping
|
Landscape Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the
Integrated Waste Management Facilities Phase 1
|
Silt
Curtain Deplovment Plan (Rev. N)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-262/2007/B
|
Permanent Aviation Fuel Facility for Hong
Kong International Airport
|
Permanent Aviation Fuel Facility Annual Audit
Report for 2021
|
https://www.epd.gov.hk/eia/english/register/index8/vep2512008_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG
Terminal
|
Baseline Study Report on Phytoplankton,
Zooplankton and Benthic Organisms
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the double berth jetty at LNG
Terminal
|
Waste Management Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
EP-565/2019
|
Yuen Long Effluent Polishing Plant
|
Pre-construction Ardeid
Night Roost Survey Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html
|
|
|
|
|
|
|
FEP-03/558/2018
|
Hong Kong Offshore LNG Terminal - Works
associated with the subsea gas pipeline for Black Point Power Station
(BPPS) and the associated Gas Receiving Station (GRS) in BPPS
|
Waste Management Plan
|
https://www.epd.gov.hk/eia/english/register/index7/fep1962019_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Silt Curtain Deployment Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation
and Water Management Facilities at the Castle Peak Power Station (CPPS)
|
Contamination Assessment Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation
and Water Management Facilities at the Castle Peak Power Station (CPPS)
|
Updated Contamination Assessment Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok
East to Hung Hom Section
|
Visual, Landscape, Tree Planting and Tree
Protection Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai Chi Yuen Cemetery Extension
|
As-Built Landscape Drawing
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road Diversion
|
Additional Baseline Water Quality Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek
Au Interchange Improvement
|
Additional Baseline Water Quality Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Additional Baseline Water Quality Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf
|
Additional Baseline Water Quality Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent
(TSE) from Shek Wu Hui
Sewage Treatment Works
|
Additional Baseline Water Quality Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Additional Baseline Water Quality Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in
Fanling North New Development Area
|
Additional Baseline Water Quality Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Management Organizations
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
|
|
- Island District
|
|
|
|
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
|
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas Desulphurization
Plant Retrofit Project
|
Quarterly EM&A Report (Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A)
Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Quarterly Environmental Monitoring and Audit
(EM&A) Report(Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power Station
(LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Quarterly Environmental Monitoring and Audit
(EM&A) Report(Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the subsea gas pipeline for Black Point Power Station (BPPS)
and the associated Gas Receiving Station (GRS) in BPPS
|
Quarterly Environmental Monitoring and Audit
(EM&A) Report(Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power Station
(LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the subsea gas pipeline for Black Point Power Station (BPPS)
and the associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report( Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800 MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit Report
Unit L11& L12 (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800 MW Gas-Fired Power Station at Lamma Extension
|
Environmental Monitoring and Audit Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Feb 2021) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Feb 2021)(HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.32(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.30(Rev B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.32(Rev B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part & remaining
part)
|
Monthly Environmental Monitoring and Audit Report
(No. 187)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report (Feb 2021) (HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
|
EP-456/2013/A
|
Drainage Improvement Works at Ngong
Ping
|
Monthly Environmental Monitoring And Audit Report
(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html
|
|
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7) into
a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Feb
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Feb 2021)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Feb 2021)(HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of
Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha Chau
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated
Sediment - Dredging, Management and Capping of sediment Disposal Facility
at Sha Chau
|
Monthly Progress Report (Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of
Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha Chau
|
Quarterly EM&A Report (Jul to Sep 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer Terminal – Bonded Vehicular
Bridge and Associated Roads
|
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and Audit Report
(Nov 2020 to Dec 2020) (HY/2013/12)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
First Annual Environmental Monitoring & Audit
(EM&A) Report (HY/2017/10)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-535/2017
|
Improvement
Dredging for Lamma Power Station Navigation
Channel
|
Monthly EM&A
Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html
|
|
|
|
|
|
|
EP-535/2017
|
Improvement
Dredging for Lamma Power Station Navigation
Channel
|
Quality EM&A
Report (Nov 2020 to Jan 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html
|
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment
Facilities, Phase I
|
Sixty-ninth Monthly
EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park
at Penny's Bay, Lantau
|
186th Monthly EM&A Report (12 Feb 2021 to 11 Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Monthly
EM&A Report(Jan 2021) (Revision 1)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
- North District
|
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly
EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge
Cemetery
|
Monthly
EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
FEP-01/460/2013/A
|
Development of Organic Waste Treatment
Facilities, Phase 2
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
|
|
|
|
|
|
|
FEP-01/460/2013/A
|
Development of Organic Waste Treatment Facilities,
Phase 2
|
Quarterly EM&A Report (Dec 2020 to Feb
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
|
|
|
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monthly EM&A Report (Feb 2021) (Version 2)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Quarterly EM&A Report (Nov 2020 to Jan 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report
(Feb 2021)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-517/2017/A
|
Expansion of Sha Tau Kok Sewage Treatment Works
|
Monthly EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
|
EP-510/2016
|
Police Facilities in Kong Nga
Po
|
Monthly EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
|
|
|
|
|
|
|
EP-450/2013/A
|
Construction
of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly
EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Feb
2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent
Polishing Plant
|
Monthly EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization
of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling North New Development Area
|
Monthly EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT
- Castle Peak Road Diversion
|
Monthly EM&A Report(Feb
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New Development Area
Road P1 and P2 and Associated New Kwu Tung
Interchange and Pak Shek Au Interchange
Improvement
|
Monthly EM&A Report(Feb
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT
- Sewage Pumping Stations in Kwu Tung North New
Development Areaf
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Monthly EM&A Report(Feb
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road
Diversion
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New Development Area Road P1 and
P2 and Associated New Kwu Tung Interchange and
Pak Shek Au Interchange Improvement
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to
D5
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping
Stations in Kwu Tung North New Development Areaf
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of
Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling North
New Development Area
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Monthly EM&A Report (Jan 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report
No.26 (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination
Plant at Tseung Kwan O
|
Quarterly
EM&A Report No.4(Dec 2020 to Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
|
EP-319/2009/D
|
Development of
a Biodiesel Plant at Tseung Kwan O Industrial
Estate
|
Monthly
EM&A Report (Feb 2021) (V.1)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination Plant at Tseung Kwan O
|
31st Monthly EM&A Report
(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-134/2002/N
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly
Environmental Monitoring and Audit Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html
|
|
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of
Sha Tin Water Treatment Works - South Works
|
Monthly
EM&A Report No.60
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
|
|
EP-463/2013/B
|
Widening and Reconstruction of Tai Po Road (Sha Tin Section)
|
Monthly
EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
|
EP-345/2009/A
|
Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel
between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir
|
20th Monthly EM&A Report(Rev.1)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html
|
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage Treatment Works
|
Monthly
EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
|
- Tai Po District
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Feb 2021)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Monthly EM&A Report(Feb 2021) (CV/2012/05)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Quarterly EM&A Report(Dec 2017 to Feb 2018)
(CV/2012/05)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Quarterly EM&A Report(Sep 2018 to Nov 2018)
(CV/2012/05)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Quarterly EM&A Report(Jun 2018 to Aug 2018)
(CV/2012/05)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT -
Utilization of Treated Sewage Effluent (TSE) from Shek
Wu Hui Sewage Treatment Works
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling North New Development Area
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT
- Castle Peak Road Diversion
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New Development Area
Road P1 and P2 and Associated New Kwu Tung
Interchange and Pak Shek Au Interchange
Improvement
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT -
Sewage Pumping Stations in Kwu Tung North New
Development Areaf
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road
Diversion
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New Development Area Road P1 and
P2 and Associated New Kwu Tung Interchange and
Pak Shek Au Interchange Improvement
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to
D5
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping
Stations in Kwu Tung North New Development Areaf
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of
Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling North
New Development Area
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
- Tsuen Wan District
|
|
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Monthly Environmental Monitoring And Audit
Report (Feb 2021)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2021)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic
Waste Treatment Facilities, Phase I
|
Sixty-ninth
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
First Annual Environmental Monitoring &
Audit (EM&A) Report (HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and Audit Report
(Nov 2020 to Dec 2020) (HY/2013/12)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.32(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.30(Rev B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.32(Rev B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A)
Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power
Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report( Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Quarterly Environmental Monitoring and Audit
(EM&A) Report(Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power
Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Quarterly Environmental Monitoring and Audit
(EM&A) Report(Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the subsea gas pipeline for Black Point Power Station
(BPPS) and the associated Gas Receiving Station (GRS) in BPPS
|
Quarterly Environmental Monitoring and Audit
(EM&A) Report(Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Feb 2021)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-507/2016/C
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.51
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
|
EP-507/2016/C
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Quarterly EM&A Report No.17
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works
for Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge
Cemetery
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works
for Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
EP-210/2005/D
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit Report
(Feb 2021)(HY/2017/10)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
FEP-03/507/2016/C
|
Additional Gas-fired Generation units Project -
Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at
the Black Point Power Station
|
Monthly EM&A Report no.51
|
https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html
|
|
|
|
|
|
|
FEP-03/507/2016/C
|
Additional Gas-fired Generation units Project -
Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at
the Black Point Power Station
|
Quarterly EM&A Report No.17
|
https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html
|
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation and Water Management Facilities at the
Castle Peak Power Station (CPPS)
|
Monthly EM&A Report
(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
|
EP-311/2008/E
|
Proposed Comprehensive Development
at Wo Shang Wai, Yuen
Long
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
|
|
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2021)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
- Central & Western District
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Nov 2020 to Jan 2021)
(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly
EM&A Report (Feb
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Nov 2020 to Jan
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Feb
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(Feb 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2021)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Update
EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A
Report (Nov 2020 to Jan 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central
- Wan Chai Bypass - Central Interchange (Contract
No. HY/2009/18)
|
Monthly
EM&A Report (Feb
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly
EM&A Report (Feb
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly
EM&A Report (Feb
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly
EM&A Report (Feb
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Nov 2020 to Jan
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Feb
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2021)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Update
EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
- Eastern District
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Nov 2020 to Jan 2021)
(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central
- Wan Chai Bypass - Central Interchange (Contract
No. HY/2009/18)
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(Feb 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Feb 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Feb 2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2021)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Nov 2020 to Jan
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Feb
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Update
EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Monthly
EM&A Report(Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
- Southern District
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2021)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-537/2017
|
Proposed Extension
of Academic Block, The Swire Institute of Marine Science, Faculty of
Science, The University of Hong Kong, Cape D’Aguilar
Road, Shek O
|
Monthly
EM&A Report No.41
|
http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html
|
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at Ocean Park
|
Quarterly
EM&A Report (Dec 2020 to Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly
EM&A Report (Feb 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
|
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas Desulphurization
Plant Retrofit Project
|
Quarterly EM&A Report (Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb 2021)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb
2021)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Sep 2020 to Nov
2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Feb 2021)
(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb
2021)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Oct 2020 to Dec
2020)(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Oct 2020 to Dec
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building, Radar
Station and Hong Kong Aviation Club) of the Former Kai Tak
Airport
|
Monthly EM&A Report (Feb
2021)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Quarterly EM&A Report (Sep 2020 to Nov
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
|
EP-563/2018
|
The Development of AFCD Animal Management and Animal
Welfare Building Complex in Kai Tak Development
|
Monthly Audit Report No. 05
|
https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html
|
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Feb
2021)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Feb
2021)(ED/2018/04)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Quarterly EM&A Report (Sep 2020 to Nov
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Feb 2021) (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Quarterly EM&A Report (Oct 2020 to Dec
2020)(ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Feb 2021) (ED/2018/05)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Feb 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Feb 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Feb 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West (HY/2014/07)
|
Monthly EM&A Report (Feb 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East (HY/2014/08)
|
Monthly EM&A Report (Feb 2021)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb 2021)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb
2021)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Sep 2020 to Nov
2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb 2021)
(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb
2021)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Oct 2020 to Dec
2020)(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Oct 2020 to Dec
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building, Radar
Station and Hong Kong Aviation Club) of the Former Kai Tak
Airport
|
Monthly EM&A Report (Feb
2021)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Quarterly EM&A Report (Sep 2020 to Nov
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Feb 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Feb 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Feb 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West
(HY/2014/07)
|
Monthly
EM&A Report (Feb 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East (HY/2014/08)
|
Monthly EM&A Report (Feb 2021)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
- Sham Shui Po
District
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Feb 2021)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb 2021)
(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb
2021)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A
Report (Feb 2021)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A
Report (Sep 2020 to Nov 2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Oct 2020 to Dec
2020)(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Oct 2020 to Dec
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A
Report (Feb 2021)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Quarterly EM&A
Report (Sep 2020 to Nov 2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
|
- Yau
Tsim Mong District
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(Feb 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving the West
Kowloon Cultural District
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Monthly EM&A Report (Feb 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Feb 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Feb 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Feb 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West (HY/2014/07)
|
Monthly EM&A Report (Feb 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East (HY/2014/08)
|
Monthly EM&A Report (Feb 2021)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
|
|
|
|
|
|