Monthly Update of Documents
Uploaded
Documents Uploaded to the EIAO Website
|
|
(for the period between 16 March 2022
to 15 April 2022)
|
|
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
|
|
ESB-354/2022
|
Development
of Lam Tei North East
|
Project
Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/esb354/esb354.pdf
|
|
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
|
|
DIR-288/2022
|
Lamma
Island Cable System
|
Decisions
of the DEP
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2882022.pdf
|
|
|
|
|
|
DIR-289/2022
|
Peng
Chau Cable System
|
Decisions
of the DEP
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2892022.pdf
|
|
DIR-290/2022
|
Installation
of Proposed Cable Route from Cheung Sha to Tung Chung Town
|
Project
Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/dir290/dir290.pdf
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
|
|
EIA-276/2021
|
Re-provision
of Open Cycle Gas Turbines at Lamma Power Station
|
EIA Reports
Approved
|
https://www.epd.gov.hk/eia/register/report/conditions/aeiar2762021.pdf
|
|
|
|
|
|
|
EIA-278/2022
|
Yuen
Long South Effluent Polishing Plant
|
EIA Reports
|
https://www.epd.gov.hk/eia/register/report/eiareport/eia_2782022/index.htm
|
|
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
|
|
AEP-600/2021
|
Re-provision
of Open Cycle Gas Turbines at Lamma Power Station
|
Environmental
Permit issued (EP-600/2022)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep6002021.htm
|
|
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
|
|
Nil
|
|
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
|
|
FEP-209/2022
|
Drainage
Diversion Works For the Comprehensive Residential Development At Various
Lots In DD227 & DD229, Tai Po Tsai, Sai Kung
|
Environmental
Permit issued (FEP-03/428/2011/A)
|
https://www.epd.gov.hk/eia/register/permit/latest/fep2092022.htm
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Management Organizations
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang /
Heung Yuen Wai Boundary Control Point and Associated Works
|
Habitat Creation and Management Plan(Revision
4)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
EP-597/2021
|
Sai O Trunk
Sewer Sewage Pumping Station
|
Baseline Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
|
|
|
|
|
|
|
EP-586/2021
|
Pier Improvement at Lai Chi Wo
|
Baseline Monitoring Report (Rev. 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5862021_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Procedures for Mitigation of Aircraft Noise
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong
Boundary Crossing Facilities
|
Proposal for Termination of Air Quality and Noise
Monitoring(HY/2019/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
FEP-01/353/2009/K
|
Hong Kong - Zhuha - Macao Bridge (HZMB) Hong
Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between
HKBCF and the Airport, Chek Lap Kok
|
Waste Management Plan
|
https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html
|
|
|
|
|
|
|
FEP-01/353/2009/K
|
Hong Kong - Zhuha - Macao Bridge (HZMB) Hong
Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between
HKBCF and the Airport, Chek Lap Kok
|
Environmental Monitoring and Audit Manual
|
https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html
|
|
|
|
|
|
|
FEP-01/353/2009/K
|
Hong Kong - Zhuha - Macao Bridge (HZMB) Hong
Kong Boundary Crossing Facilities (HKBCF) - The Road Connection between
HKBCF and the Airport, Chek Lap Kok
|
Landscape and Visual Plan
|
https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei,
Tai Po
|
Post-Construction Monitoring and Audit Report (Jan to Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei,
Tai Po
|
Post-Construction Monitoring and Audit Report (Nov to Dec 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei,
Tai Po
|
Post-Construction Monitoring and Audit Report (Sep to Oct 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-129/2002/H
|
Sheung Shui to Lok Ma Chau Spur Line
|
Pilot Test Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep4602014_content.html
|
|
|
|
|
|
|
FEP-06/129/2002/I
|
Sheung Shui to Lok Ma Chau Spur Line
|
Pilot Test Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep6042021_content.html
|
|
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to
Hung Hom Section
|
Ground-borne Railway Noise Performance Test Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
Landscape and Visual Mitigation Plan (Rev.2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town Extension
|
Plan on Provision of Buffer Zones
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town Extension
|
Waste Management Plan (Tung Chung West)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
|
|
- Island District
|
|
|
|
|
|
|
EP-588/2021
|
Siu Ho Wan Station and
Siu Ho Wan Depot Replanning Works
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html
|
|
|
|
|
|
|
EP-588/2021
|
Siu Ho Wan Station and
Siu Ho Wan Depot Replanning Works
|
Monthly EM&A
Report(Feb 2022)(Combined)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5882021_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Construction Phase
Monthly EM&A Report No.73
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Construction Phase
Monthly EM&A Report No.74
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-248/2006
|
Lamma Power Station
Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly EM&A
Report (Oct 2021 to Dec 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
|
|
|
|
EP-287/2007
|
Lamma Power Station -
Unit L2 Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly EM&A
Report (Oct 2021 to Dec 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
|
|
|
EP-538/2017
|
Outlying Islands
Sewerage Stage 2 - South Lantau Sewerage Works
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5382017_content.html
|
|
|
|
|
|
|
FEP-01/353/2009/K
|
Hong Kong - Zhuha -
Macao Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The
Road Connection between HKBCF and the Airport, Chek Lap Kok
|
Construction Phase
Monthly EM&A Report No. 5 (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html
|
|
|
|
|
|
|
FEP-01/353/2009/K
|
Hong Kong - Zhuha -
Macao Bridge (HZMB) Hong Kong Boundary Crossing Facilities (HKBCF) - The
Road Connection between HKBCF and the Airport, Chek Lap Kok
|
Construction Phase
Quarterly EM&A Report No. 1 (Oct 2021 to Dec 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1902018_content.html
|
|
|
|
|
|
|
EP-083/2000
|
Conversion of Two
Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental
Monitoring And Audit Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai Chi Yuen
Cemetery Extension
|
Monthly EM&A Report
(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power Station (LPS) and the
associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/B
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town
Extension
|
Monthly EM&A Report
(Feb 2022) (Tung Chung East)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-488/2014/A
|
Upgrading of Cheung Chau
Sewage Collection, Treatment and Disposal Facilities
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5912021_content.html
|
|
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at
Penny's Bay, Lantau
|
198th Monthly EM&A
Report (12 Feb 2022 – 11 Mar 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800
MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit
Report Unit L11& L12 (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800
MW Gas-Fired Power Station at Lamma Extension
|
Environmental Monitoring and Audit Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary
Crossing Facilities
|
Monthly EM&A Report(Jan 2022)(HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary
Crossing Facilities
|
Monthly EM&A Report(Feb 2022)(HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary
Crossing Facilities
|
Monthly EM&A Report(Feb 2022) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-429/2012/A
|
Development of the Integrated Waste
Management Facilities Phase 1
|
Monthly EM&A Report No.44(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
FEP-01/429/2012/A
|
Development of the Integrated Waste
Management Facilities Phase 1
|
Monthly EM&A Report No.44(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report(Feb 2022) (HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
|
EP-456/2013/B
|
Drainage Improvement Works at Ngong Ping
|
Monthly Environmental Monitoring And Audit
Report (Feb 2022)(DC/2019/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5992021_content.html
|
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer Terminal – Bonded Vehicular
Bridge and Associated Roads
|
EM&A Report(Jan 2022)(Rev.A)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer Terminal – Bonded
Vehicular Bridge and Associated Roads
|
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer Terminal – Bonded
Vehicular Bridge and Associated Roads
|
EM&A Report(Feb 2022)(Rev.A)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer Terminal – Bonded
Vehicular Bridge and Associated Roads
|
EM&A Report(Feb 2022)(Rev.Aa)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging,
Management and Capping of sediment Disposal Facility at Sha Chau
|
Monthly Progress Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging,
Management and Capping of sediment Disposal Facility at Sha Chau
|
Monthly Progress Report (Feb 2022)(Revision A)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Eighty-first Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
|
- North District
|
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
FEP-01/470/2013
|
Utilization of Treated
Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html
|
|
|
|
|
|
|
EP-477/2013/A
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html
|
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators
at Wo Hop Shek Crematorium
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
|
EP-517/2017/A
|
Expansion of Sha Tau Kok Sewage
Treatment Works
|
Quarterly EM&A Report(Dec 2021 to Feb
2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
|
EP-517/2017/A
|
Expansion of Sha Tau Kok Sewage
Treatment Works
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
|
EP-510/2016
|
Police Facilities in Kong Nga Po
|
Monthly
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
|
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Monthly EM&A
Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Quarterly
EM&A Report(Oct 2021 to Dec 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui
Sewage Treatment Works
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling North New
Development Area
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road
Diversion
|
Monthly
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New Development
Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au
Interchange Improvement
|
Monthly EM&A
Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping Stations
in Kwu Tung North New Development Areaf
|
Monthly
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Monthly
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control Point and
Associated Works
|
Monthly EM&A Report (Feb 2022)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control Point and
Associated Works
|
Quarterly EM&A Report (Nov 2021 to Jan 2022)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
FEP-01/460/2013/A
|
Development of Organic Waste Treatment Facilities,
Phase 2
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
|
|
|
|
|
|
|
FEP-01/460/2013/A
|
Development of Organic Waste Treatment
Facilities, Phase 2
|
Quarterly EM&A Report (Dec 2021 to Feb
2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Feb
2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
- Sai Kung District
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Quarterly EM&A Report (Oct 2021 to Dec
2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New Territories Landfill Extension
|
Quarterly EM&A Report (Oct 2021 to Dec
2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site -
Road Improvement Works
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Feb 2022)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Quarterly EM&A Report (Sep 2021 to Nov
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination Plant at Tseung Kwan O
|
3rd Annual EM&A Review Report(Sep 2020 to
Aug 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung Kwan O
|
Monthly EM&A Report (Jan 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung Kwan O
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination Plant at Tseung Kwan O
|
42nd Monthly EM&A Report (Jan 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination Plant at Tseung Kwan O
|
43rd Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
EP-516/2016
|
Port Shelter Sewerage, Stage3 - Sewerage
Works at Po Toi O
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html
|
|
|
|
|
|
|
EP-319/2009/D
|
Development of a
Biodiesel Plant at Tseung Kwan O Industrial Estate
|
Monthly EM&A Report
(Feb 2022) (V.1)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha
Kwo Ling
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly EM&A Report
(Jan 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly EM&A Report
(Feb 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-134/2002/N
|
Fill Bank at Tseung Kwan
O Area 137
|
Monthly Environmental
Monitoring and Audit Report (Dec 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html
|
|
|
|
|
|
|
- Sha Tin District
|
|
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of Sha Tin Water Treatment Works -
South Works
|
Monthly
EM&A Report No.72
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
|
|
EP-463/2013/B
|
Widening and
Reconstruction of Tai Po Road (Sha Tin Section)
|
Monthly
EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
|
EP-463/2013/B
|
Widening and
Reconstruction of Tai Po Road (Sha Tin Section)
|
Quarterly
EM&A Report (Dec 2021 to Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage Treatment Works
|
Monthly
EM&A Report (Feb
2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
|
- Tai Po District
|
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization
of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of
temporary Wholesale Market in Fanling North New Development Area
|
Monthly
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North
New Development Area Road D1 to D5
|
Monthly
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT -
Castle Peak Road Diversion
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung
North New Development Area Road P1 and P2 and Associated New Kwu Tung
Interchange and Pak Shek Au Interchange Improvement
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT -
Sewage Pumping Stations in Kwu Tung North New Development Areaf
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-597/2021
|
Sai O Trunk Sewer Sewage
Pumping Station
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5972021_content.html
|
|
|
|
|
|
|
FEP-01/470/2013
|
Utilization of Treated
Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2042021_content.html
|
|
|
|
|
|
|
- Tsuen
Wan District
|
|
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu Ho Wan Sewage Treatment
Plant
|
Quarterly Environmental Monitoring And
Audit Report (Nov 2021 to Jan 2022)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu Ho Wan Sewage Treatment
Plant
|
Monthly Environmental Monitoring And Audit
Report (Feb 2022)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment
Facilities, Phase I
|
Eighty-first Monthly
EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.73
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.74
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
- Tuen Mun
District
|
|
|
|
|
|
|
EP-429/2012/A
|
Development of the Integrated Waste
Management Facilities Phase 1
|
Monthly EM&A Report No.44(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
FEP-01/429/2012/A
|
Development of the Integrated Waste
Management Facilities Phase 1
|
Monthly EM&A Report No.44(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Construction Phase
Monthly EM&A Report No.73
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Construction Phase
Monthly EM&A Report No.74
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong
Kong Offshore LNG Terminal - Works associated with the double berth jetty
at LNG Terminal
|
Monthly
Environmental Monitoring and Audit (EM&A) Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power Station (LPS) and the
associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/B
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5972021_content.html
|
|
|
|
|
|
|
EP-507/2016/C
|
Installation of One
additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point
Power Station
|
Quarterly EM&A
Report No.21
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
|
EP-507/2016/D
|
Additional Gas-fired
Generation Units Project
|
Quarterly EM&A
Report No.21
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/507/2016/C
|
Additional Gas-fired Generation
units Project - Installation of one additional gas-fired generation unit
(CCGT Unit No. 2) at the Black Point Power Station
|
Quarterly EM&A
Report No.21
|
https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html
|
|
|
|
|
|
|
FEP-04/507/2016/C
|
Additional Gas-fired
Generation units Project - Installation of one additional gas-fired generation
unit (CCGT Unit No. 2) at the Black Point Power Station
|
Quarterly EM&A
Report No.21
|
https://www.epd.gov.hk/eia/english/register/index7/fep2062021_content.html
|
|
|
|
|
|
|
FEP-04/507/2016/D
|
Additional Gas-fired
Generation Units Project - Installation of one additional gas-fired
generation unit (CCGT unit No. 2) at the Black Point Power
|
Quarterly EM&A
Report No.21
|
https://www.epd.gov.hk/eia/english/register/index8/vep6062021_content.html
|
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation
and Water Management Facilities at the Castle Peak Power Station (CPPS)
|
Monthly EM&A Report
(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
|
EP-210/2005/E
|
Expansion and Extension
of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A
Report(Dec 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep6072021_content.html
|
|
|
|
|
|
|
EP-507/2016/D
|
Additional Gas-fired
Generation Units Project
|
Monthly EM&A Report
no.63
|
https://www.epd.gov.hk/eia/english/register/index8/vep6052021_content.html
|
|
|
|
|
|
|
FEP-04/507/2016/D
|
Additional Gas-fired
Generation Units Project - Installation of one additional gas-fired generation
unit (CCGT unit No. 2) at the Black Point Power Station
|
Monthly EM&A Report
no.63
|
https://www.epd.gov.hk/eia/english/register/index8/vep6062021_content.html
|
|
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
|
|
EP-477/2013/A
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5952021_content.html
|
|
|
|
|
|
|
EP-565/2019
|
Yuen Long Effluent Polishing Plant
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html
|
|
|
|
|
|
|
EP-311/2008/E
|
Proposed Comprehensive Development at Wo
Shang Wai, Yuen Long
|
Monthly EM&A Report (Jan 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
|
|
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Monthly Operational Phase Environmental
Monitoring and Audit Report No. 9
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
|
|
EP-515/2017
|
Proposed Low-rise and Low-density Residential
Development at Various Lots and their Adjoining Government Land in D.D. 104,
East of Kam Pok Road, Mai Po, Yuen Long. New Territories
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5152017_content.html
|
|
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
|
|
EP-541/2017/A
|
Flyover from Kwai Tsing Interchange Upramp to
Kwai Chung Road
|
Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5842020_content.html
|
|
|
|
|
|
|
- Central & Western District
|
|
|
|
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and
Revitalisation Project
|
Monthly EM&A Report (No.36)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Feb 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report
(Feb 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Monthly EM&A Report
(Feb 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/15)
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HY/2010/08) -
Tunnel Work
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
|
|
FEP-03/376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Monthly EM&A Report
(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Feb 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/15)
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HY/2010/08) -
Tunnel Work
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads
which are classified as primary/district distributor roads
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report
(Feb 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Monthly EM&A Report
(Feb 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
- Eastern District
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and Central-Wan
Chai Bypass
|
Monthly EM&A Report (Jan
2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and Central-Wan
Chai Bypass
|
Monthly EM&A Report (Feb 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha
Kwo Ling
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly EM&A Report
(Jan 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly EM&A Report
(Feb 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung
Kwan O
|
Monthly EM&A Report
(Feb 2022)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung
Kwan O
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Feb 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill
Extension
|
Quarterly EM&A
Report (Oct 2021 to Dec 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-308/2008/B
|
South-East New
Territories Landfill Extension
|
Quarterly EM&A
Report (Oct 2021 to Dec 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Jan 2022)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/15)
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HY/2010/08) - Tunnel Work
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
- Southern District
|
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at Ocean Park
|
Operation Phase Monthly EM&A Report(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Feb 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly EM&A Report
(Jan 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha
Kwo Ling
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly EM&A Report
(Feb 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A
Report (Sep 2021 to Nov 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
EP-537/2017
|
Proposed Extension of
Academic Block, The Swire Institute of Marine Science, Faculty of Science,
The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Monthly EM&A Report
No.52
|
https://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html
|
|
|
|
|
|
|
EP-537/2017
|
Proposed Extension of
Academic Block, The Swire Institute of Marine Science, Faculty of Science,
The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Monthly EM&A Report
No.53
|
https://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html
|
|
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Feb 2022) (ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb 2022) (ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2022)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Feb
2022)(ED/2018/04)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A & D4A
|
Monthly EM&A Report (Feb 2022) (ED/2018/05)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A & D4A
|
Monthly EM&A Report (Feb 2022) (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-563/2018
|
The Development of AFCD Animal Management and
Animal Welfare Building Complex in Kai Tak Development
|
Monthly Audit Report No. 16
|
https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html
|
|
|
|
|
|
|
FEP-03/457/2013/D
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report(Feb 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West
(HY/2014/07)
|
Monthly EM&A Report (Feb
2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Feb
2022)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Feb
2022)(HY/2014/20) (HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (Feb
2022)(HY/2018/02)(HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report(Feb
2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html
|
|
|
|
|
|
|
- Kwun Tong District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Feb 2022) (ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Feb 2022) (ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2022)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site -
Road Improvement Works
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-564/2018
|
Lei Yue Mun Waterfront Enhancement Project
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html
|
|
|
|
|
|
|
FEP-03/457/2013/D
|
Central Kowloon Route -
Yau Ma Tei East
|
Monthly EM&A
Report(Feb 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route -
Kai Tak West (HY/2014/07)
|
Monthly EM&A Report
(Feb 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Feb 2022)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Feb 2022)(HY/2014/20) (HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Feb 2022)(HY/2018/02)(HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A
Report(Feb 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha
Kwo Ling
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly EM&A Report
(Jan 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly EM&A Report
(Feb 2022)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
- Sham Shui Po District
|
|
|
|
|
|
|
Nil
|
|
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Feb 2022) (ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report (Feb 2022) (ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2022)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
- Yau Tsim Mong District
|
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving the West
Kowloon Cultural District
|
Monthly EM&A Report (Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving the West
Kowloon Cultural District
|
Quarterly EM&A Report (Nov 2021 to Jan 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping Station and Dry
Weather Flow Interceptor at Cherry Street Box Culvert
|
Submission of Monthly EM&A Report No.49
|
https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Feb 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link -
Hung Hom to Admiralty Section
|
Monthly EM&A Report
(Feb 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-03/457/2013/D
|
Central Kowloon Route -
Yau Ma Tei East
|
Monthly EM&A
Report(Feb 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep2082021hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route -
Kai Tak West (HY/2014/07)
|
Monthly EM&A Report
(Feb 2022)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Feb 2022)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Feb 2022)(HY/2014/20) (HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(Feb 2022)(HY/2018/02)(HY/2019/13)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A
Report(Feb 2022)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201408.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|