Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the period
between 16 Jul 2014 to 15 Aug 2014)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
Application
for EIA Study Brief
|
|
|
ESB-274/2014
|
Kai Tak
Multi-purpose Sports Complex
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-274.pdf
|
|
|
ESB-275/2014
|
Kau Sai
Chau Golf
Academy
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-275.pdf
|
|
|
ESB-276/2014
|
Police Facilities in Kong Nga Po
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb276/esb276.pdf
|
|
|
ESB-277/2014
|
Engineering Feasibility Study
for Industrial Estate at Tuen Mun
Area 38
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb277/esb277.pdf
|
|
|
ESB-278/2014
|
Elevated Pedestrian Corridor in Yuen Long Town
connecting with Long Ping Station
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb278/esb278.pdf
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
DIR-238/2014
|
Construction
of a Landing and Access Facility at Fung Wong Wat
Beacon, Tolo Channel, Tai Po
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2382014.pdf
|
|
|
Application
for Approval of EIA Report
|
|
|
EIA-220/2014
|
Proposed Residential Cum Passive Recreation
Development within "Recreation" Zone and "Residential (Group
C)" Zone at Various Lots in DD 104, Yuen Long, N.T.
|
Approval Conditions
|
http://www.epd.gov.hk/eia/register/report/conditions/aeiar2202014.pdf
|
|
|
Application
for Environmental Permit
|
|
|
AEP-484/2014
|
Proposed Residential Cum Passive
Recreation Development within "Recreation" Zone and
"Residential (Group C)" Zone at Various Lots in DD 104, Yuen
Long, N.T.
|
Environmental Permit issued
(EP-484/2014)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4842014.htm
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
VEP-445/2014
|
Drainage Improvement in Tsuen
Wan and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Environmental Permit issued
(FEP-02/275/2007/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4452014.htm
|
|
|
VEP-446/2014
|
Drainage Improvement in Tsuen
Wan and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Environmental Permit issued
(EP-275/2007/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4462014.htm
|
|
|
VEP-448/2014
|
Sewerage Works at Pik Shui Sun Tsuen
|
Environmental Permit issued
(EP-435/2011/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4482014.htm
|
|
|
VEP-444/2014
|
Shatin to Central Link - Tai Wai to Hung Hom
Section
|
Environmental Permit issued (EP-438/2012/F)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4442014.htm
|
|
|
Application
for Further Environmental Permit
|
|
|
FEP-156/2014
|
Village Flood Protection for Mai Po Lo Wai and
Mai Po San Tsuen
|
Environmental Permit issued (FEP-03/088/2001 )
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1562014.htm
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
FEP-05/364/2009/A
|
Central -
Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)
|
Landscape
Plan
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
EP-335/2009
|
Phased Reprovisioning of Cape Collinson Crematorium
|
Supplementary
Contamination Assessment Plan for Additional Underground Oil Tank
|
http://www.epd.gov.hk/eia/english/register/aep/ep3352009_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson Crematorium
|
Supplementary
Contamination Assessment Plan for Additional Underground Oil Tank
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-407/2010/D
|
South Island
Line (East)
|
Ecological
Planning & Landscape Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-313/2008/I
|
West Island Line
|
Noise
Performance Test Proposal
|
http://www.epd.gov.hk/eia/english/register/index8/vep4302014_content.html
|
|
|
EP-407/2010/D
|
South Island
Line (East)
|
Operational
Ground-borne Noise Review Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-407/2010/D
|
South Island
Line (East)
|
Operational
Ground-borne Noise Mitigation Measures Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
- Island District
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jan
to Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Jun
2014)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (May
2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental
Monitoring and Audit Report (No. 106)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
105th Monthly EM&A Report
(12 May 2014 to 11 Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan
Sewerage, Sewage Treatment Works and Outfall
|
Quarterly EM&A Summary
Report (Dec 2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan
Sewerage, Sewage Treatment Works and Outfall
|
Monthly
EM&A Report (May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal
Facilities
|
Monthly EM&A Report (May
2014) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-352/2009
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3522009_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and
Capping of Contaminated Sediment Disposal Facility to the South of The
Brothers
|
Monthly Progress Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report (May
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Quarterly EM&A Report (Jun 2013 to Aug
2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Quarterly EM&A Report (Sep 2013 to Nov
2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Quarterly EM&A Report (Dec 2013 to Feb
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Quarterly EM&A Report (Dec 2013 to Feb
2014)(HY/2011/09 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (May
2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (May
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Jun
2013 to Aug 2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Annual EM&A Report (Mar
2012 to Feb 2013)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas
Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental
Monitoring And Audit Report (May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station
at Lamma Extension
|
Monthly Environmental
Monitoring and Audit Report (May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental
Monitoring & Audit Report (Mar 2014) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental
Monitoring & Audit Report (Apr 2014) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-392/2010
|
Improvement of Fresh Water
Supply to Cheung Chau
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun
- Chek Lap Kok Link
|
Monthly EM&A Report (May 2014)(HY/2010/02
)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun
- Chek Lap Kok Link
|
Annual EM&A Report (Mar
2012 to Feb 2013)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun
- Chek Lap Kok Link
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun
- Chek Lap Kok Link
|
1st Quarterly EM&A Report
(HY/2012/08 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
- North District
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Quarterly EM&A Report (Feb
to Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Monthly EM&A Report(Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Monthly EM&A Report(May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Apr
2014) (eng)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Apr
2014) (chi)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Jul
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
- Sai Kung District
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly
EM&A Report (May 2014) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly
EM&A Report (May 2014) (CV/2013/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-410/2010
|
Phase III Redevelopment
of The Hong Kong Federation of Youth
Groups Jockey Club Sai Kung Outdoor Training Camp
|
Monthly
EM&A Report (May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4102010_content.html
|
|
|
EP-448/2013
|
Natural Terrain Hazard
Mitigation Works at Study Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road,
Sai Kung
|
Monthly EM&A Report (Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
|
- Sha Tin
District
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
- Tai Po District
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (May 2014) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (May 2014) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-419/2011/B
|
Sediment Removal at Yim Tin
Tsai (East) Fish Culture Zone
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4272014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Monthly EM&A Report (Mar
2014) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Monthly EM&A Report (May
2014) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Monthly EM&A Report (Apr
2014) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
- Tsuen
Wan District
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/24)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/23)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Feb
to Apr 2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Tuen Mun District
|
|
|
EP-354/2009/A
|
Tuen Mun
- Chek Lap Kok Link
|
Monthly EM&A Report (May
2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun
- Chek Lap Kok Link
|
Annual EM&A Report (Mar
2012 to Feb 2013)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun
- Chek Lap Kok Link
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun
- Chek Lap Kok Link
|
1st Quarterly EM&A Report
(HY/2012/08 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point
Sewage Treatment Works
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point
Sewage Treatment Works
|
Quarterly EM&A Report (Feb
2014 to Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill
Bank at Tuen Mun Area
38
|
Monthly EM&A Report (May
2014) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge Treatment Facilities
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road Town Centre
Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road Town Centre
Section
|
Quarterly EM&A Report (Feb
2014 to Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road,
Tuen Mun
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-226/2005
|
Development of an EcoPark in Tuen Mun Area 38
|
Annual EM&A Report (Jan
2013 to Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2262005_content.html
|
|
|
FEP-01/334/2009/A
|
Sludge Treatment Facilities
|
Quarterly EM&A Report (Mar
2013 to May 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3452011_content.html
|
|
|
EP-381/2009
|
Tuen
Mun Area 54 Sewage Pumping Station
|
Monthly EM&A Report (May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
- Yuen Long District
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
EP-450/2013
|
Construction of Cycle Tracks
and the associated Supporting Facilities from Sha
Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (15 Apr
2014 to 31 May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary
Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road
(Section 3)
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A Report (Sep
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Final EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi Interchange
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
- Kwai Tsing
District
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-426/2011/A
|
Providing Sufficient Water
Depth for Kwai
Tsing Container
Basin and its
Approach Channel
|
Monthly Environmental
Monitoring & Audit Report (May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/24)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/23)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Feb
to Apr 2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Central & Western District
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip
roads
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/24)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/23)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Feb
to Apr 2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (May
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-313/2008/H
|
West Island Line
|
Monthly EM&A Report (No.57)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4222013_content.html
|
|
|
EP-313/2008/H
|
West Island Line
|
Monthly EM&A Report (No.58)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4222013_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
Monthly EM&A Report (No.31)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-447/2013
|
Decommissioning of the Magazine Site at Victoria Road
for West Island Line
|
Monthly EM&A Report No.7
|
http://www.epd.gov.hk/eia/english/register/aep/ep4472013_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Jun
2014) No.35
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
- Wan Chai District
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/24)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/23)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Feb
to Apr 2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (May
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Jun
2014) No.35
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
Monthly EM&A Report (No.31)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
- Eastern District
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Mar 2014
to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Mar 2014
to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/24)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/23)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Feb
to Apr 2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former
Kai Tak Airport
Development
|
23rd Monthly EM&A Report (Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (May
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning
of Cape Collinson
Crematorium
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning
of Cape Collinson
Crematorium
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
- Southern District
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Jun
2014) No.35
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jan
to Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/24)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/23)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Feb
to Apr 2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Kowloon City District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A
Report (May 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Quarterly EM&A Report (Mar
to May 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (May
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A
Report (May 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Apr 2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly EM&A Report (Mar
to May 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former
Kai Tak Airport
Development
|
23rd Monthly EM&A Report (Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise
Terminal at Kai Tak
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report No.21
(May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
- Kwun Tong
District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A
Report (May 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Quarterly EM&A Report (Mar
to May 2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (May
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A
Report (May 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Apr 2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly EM&A Report (Mar
to May 2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (May
2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (May
2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Quarterly EM&A Report (Mar
2014 to May 2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Apr
2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-409/2010
|
Yau Tong
Bay - Decommissioning of Shipyard
Sites
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
- Sham Shui Po District
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/24)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/23)(May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (May
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Feb
to Apr 2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Jun
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Wong Tai Sin District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A
Report (May 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Apr
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Quarterly EM&A Report (Mar
to May 2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (May
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A
Report (May 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A
Report (Apr 2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Apr 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly EM&A Report (Mar
to May 2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Mar
2014 to May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
- Yau Tsim Mong District
|
|
|
EP-440/2012
|
MTR Tsim
Sha Tsui Station
Carnarvon Subway and Entrances Modification Works
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report No.21
(May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-317/2009
|
Tsim Sha Tsui Station Northern Subway
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4232014_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
|
|
|
|
|
|
|