|
| |
|
|
|
Monthly Update of Documents
Uploaded
Documents
Uploaded to the EIAO Website
|
|
(for the period between 16 July 2021 to 15 August 2021)
|
|
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
|
|
ESB-342/2021
|
Airport
Tung Chung Link Project
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/study/latest/esb-342.pdf
|
|
|
|
|
|
|
ESB-343/2021
|
Widening
of Tsuen Wan Road and the associated junction
improvement works
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/study/latest/esb-343.pdf
|
|
|
|
|
|
|
ESB-344/2021
|
Proposed
Residential Development at Lot No. 2 in D.D. 228 near Pak Fa Lam Road, Sai Kung
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/study/latest/esb-344.pdf
|
|
|
|
|
|
|
ESB-345/2021
|
Hudson
Environmental Waste Disposal Center (Waste Mineral Oil)
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/study/latest/esb-345.pdf
|
|
|
|
|
|
|
ESB-346/2021
|
Northern
Link
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/study/latest/esb-346.pdf
|
|
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
|
|
DIR-284/2021
|
Installation of the
Proposed 132kV Cable Circuits Connecting with Ho To West Substation and
Existing 132kV Fanling to Mai Po Cable Circuits
|
Decisions of the DEP
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2842021.pdf
|
|
|
|
|
|
|
DIR-285/2021
|
Asia Direct Cable System -
Hong Kong Segment (ADC-HK) - Chung Hom Kok
|
Decisions of the DEP
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2852021.pdf
|
|
|
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
|
|
EIA-271/2021
|
Relocation
of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns
|
EIA Reports
|
https://www.epd.gov.hk/eia/register/report/eiareport/eia_2712021/DH_EIA/EIA_Cover.htm
|
|
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
|
|
Nil
|
|
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
|
|
VEP-595/2021
|
Development
of Lok Ma Chau Loop
|
Environmental
Permit issued (EP-477/2013/A)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5952021.htm
|
|
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
|
|
FEP-206/2021
|
Additional
Gas-fired Generation Units Project - Installation of one additional
gas-fired generation unit (CCGT unit No. 2) at the Black Point Power
Station
|
Environmental
Permit issued (FEP-04/507/2016/C)
|
https://www.epd.gov.hk/eia/register/permit/latest/fep2062021.htm
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town Extension
|
Management Organisations
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak
Development
|
Landscape Mitigation Plan for Road D1 (Part)
(ED/2018/05)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak
Development
|
Landscape Mitigation Plan (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development
– Roads D3A & D4A
|
Landscape Mitigation Plan (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-575/2020
|
H2H Express Submarine Cable
|
Post Project Water Quality Monitoring Report
(Zone B)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5752020_content.html
|
|
|
|
|
|
|
EP-573/2020
|
Bay to Bay Express Cable System - Hong Kong
Segment (BtoBE-HK) – Chung Hom
Kok
|
Post-project Coral Survey Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep5732020_content.html
|
|
|
|
|
|
|
EP-249/2006/D
|
Repositioning and Long Term Operation Plan of
Ocean Park
|
3rd Monthly Noise Monitoring Report (April
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4382014_content.html
|
|
|
|
|
|
|
EP-249/2006/D
|
Repositioning and Long Term Operation Plan of
Ocean Park
|
4th Monthly Noise Monitoring Report (Jul
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4382014_content.html
|
|
|
|
|
|
|
EP-554/2018
|
Upgrading of Sewage Pumping Stations and
Sewerage along Ting Kok Road
|
Condition Survey Report on a Grade 3
Historical Building (Yu Cheung Tong)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5542018_content.html
|
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly Operational Airborne Rail Noise
Monitoring Report (Wing Fung Building) No.1
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
|
EP-488/2014/A
|
Upgrading of Cheung Chau
Sewage Collection, Treatment and Disposal Facilities
|
Baseline Dust & Noise Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5912021_content.html
|
|
|
|
|
|
|
EP-516/2016
|
Port Shelter Sewerage, Stage3 - Sewerage
Works at Po Toi O
|
Air Quality, Noise and Water Quality Baseline
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html
|
|
|
|
|
|
|
EP-516/2016
|
Port Shelter
Sewerage, Stage3 - Sewerage Works at Po Toi O
|
Silt Curtain
& Cofferdam Deployment Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html
|
|
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
Environmental Review Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control Point and Associated Works
|
Monitoring Report for Wetland Compensation Area (NO.9) (June
2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
EP-311/2008/E
|
Proposed
Comprehensive Development at Wo Shang Wai, Yuen Long
|
Biannual EM&A Summary Report on Ecology
(Nov 2020 – Apr 2021) (Rev A)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and Central-Wan Chai Bypass
|
Operation Phase Odour
Monitoring Report at Causeway Bay Typhoon Shelter of Central Wanchai Bypass(Jul 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
Fauna Translocation Plans - Stage 1
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
Fauna Translocation Plans - Stage 2
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
Report for Capture and Relocation of Common
Rat Snake
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
1st Post-Translocation Ecological Monitoring
Report (at the vicinity of Lung Mei)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
1st Post-Translocation Ecological Monitoring
Report (at the vicinity of Ting Kok)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
2nd Post-Translocation Ecological Monitoring
Report (at the vicinity of Lung Mei)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
2nd Post-Translocation Ecological Monitoring
Report (at the vicinity of Ting Kok East)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
3rd Post-Translocation Ecological Monitoring
Report (at the vicinity of Lung Mei)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
3rd Post-Translocation Ecological Monitoring
Report (at the vicinity of Ting Kok East)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
4th Post-Translocation Ecological Monitoring
Report (at the vicinity of Lung Mei)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
4th Post-Translocation Ecological Monitoring
Report (at the vicinity of Ting Kok East)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
1st Post-Construction Seahorse Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
5th Post-Translocation Ecological Monitoring
Report (at the vicinity of Lung Mei)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
5th Post-Translocation Ecological Monitoring
Report (at the vicinity of Ting Kok East)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
Seahorse Translocation Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
First 7 Days Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
Second Week Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
Third Week Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
Fourth Week Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
5th Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
6th Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
7th Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
8th Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
2nd Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
3rd Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
9th Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
10th Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
11th Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
12th Month Seahorse Post-Translocation
Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
|
|
- Island District
|
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town
Extension
|
Monthly EM&A Report
(May 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
|
EP-555/2018/A
|
New Wang Tong River
Bridge
|
Monthly EM&A
Report(Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Construction Phase
Monthly EM&A Report No.66
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Annual EM&A Report
No.5
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-083/2000
|
Conversion of Two
Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental
Monitoring And Audit Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A)
Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai Chi Yuen
Cemetery Extension
|
Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power
Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the subsea gas pipeline for Black Point Power Station
(BPPS) and the associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Quarterly Environmental Monitoring and Audit (EM&A)
Report(Jan 2021 to Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power
Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Quarterly Environmental Monitoring and Audit
(EM&A) Report(Jan 2021 to Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works
associated with the subsea gas pipeline for Black Point Power Station
(BPPS) and the associated Gas Receiving Station (GRS) in BPPS
|
Quarterly Environmental Monitoring and Audit
(EM&A) Report(Jan 2021 to Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800
MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit
Report Unit L11& L12 (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-071/2000/D
|
1,800
MW Gas-Fired Power Station at Lamma Extension
|
Environmental Monitoring and Audit Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(June 2021)(HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(June 2021) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Mar 2021 to May 2021)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste
Management Facilities Phase 1
|
Monthly EM&A Report No.36(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste
Management Facilities Phase 1
|
12th Quarterly EM&A Report(Rev.A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-01/097/2001/C
|
Water
Recreation Centre at Penny's Bay (part & remaining part)
|
Monthly
Environmental Monitoring and Audit Report (No. 191)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report(June 2021) (HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Quarterly EM&A Report (Mar 2021 to May 2021)
(HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
|
EP-456/2013/A
|
Drainage
Improvement Works at Ngong Ping
|
Monthly
Environmental Monitoring And Audit Report (June 2021)(DC/2019/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html
|
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer Terminal – Bonded
Vehicular Bridge and Associated Roads
|
EM&A Report(June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Second Annual
Environmental Monitoring & Audit (EM&A) Report (HY/2017/10)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
11th Quarterly Environmental Monitoring and Audit Report (HY/2017/10)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Third Annual Environmental Monitoring & Audit (EM&A) Report
(HY/2017/10)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-535/2017
|
Improvement
Dredging for Lamma Power Station Navigation
Channel
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html
|
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging,
Management and Capping of sediment Disposal Facility at Sha
Chau
|
Monthly Progress Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging,
Management and Capping of sediment Disposal Facility at Sha
Chau
|
Quarterly EM&A Report (Apr to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Seventy-third Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park
at Penny's Bay, Lantau
|
190th Monthly EM&A Report (12 June 2021 – 11 July 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
|
|
EP-573/2020
|
Bay to Bay Express Cable System - Hong Kong
Segment (BtoBE-HK) – Chung Hom
Kok
|
Monthly EM&A Report(June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5732020_content.html
|
|
|
|
|
|
|
EP-014/1998/A
|
Outlying Islands Transfer Facilities at Sok Kwu Wan
|
Annual Environmental Audit Report(Operation)(Apr 2013 to Mar 2014)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html
|
|
|
|
|
|
|
EP-014/1998/A
|
Outlying Islands Transfer Facilities at Sok Kwu Wan
|
Annual Environmental Audit Report(Operation)(Apr 2014 to Mar 2015)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html
|
|
|
|
|
|
|
EP-014/1998/A
|
Outlying Islands Transfer Facilities at Sok Kwu Wan
|
Annual Environmental Audit Report(Operation)(Apr 2015 to Mar 2016)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html
|
|
|
|
|
|
|
EP-014/1998/A
|
Outlying Islands Transfer Facilities at Sok Kwu Wan
|
Annual Environmental Audit Report(Operation)(Apr 2016 to Mar 2017)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html
|
|
|
|
|
|
|
EP-014/1998/A
|
Outlying Islands Transfer Facilities at Sok Kwu Wan
|
Annual Environmental Audit Report(Operation)(Apr 2017 to Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html
|
|
|
|
|
|
|
EP-014/1998/A
|
Outlying Islands Transfer Facilities at Sok Kwu Wan
|
Annual Environmental Audit Report(Operation)(Apr 2018 to Mar 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html
|
|
|
|
|
|
|
EP-014/1998/A
|
Outlying Islands Transfer Facilities at Sok Kwu Wan
|
Annual Environmental Audit Report(Operation)(Apr 2019 to Mar 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html
|
|
|
|
|
|
|
EP-014/1998/A
|
Outlying Islands Transfer Facilities at Sok Kwu Wan
|
Annual Environmental Audit Report(Operation)(Apr 2020 to Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2692021_content.html
|
|
|
|
|
|
|
- North District
|
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
EP-477/2013
|
Development of Lok
Ma Chau Loop
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators
at Wo Hop Shek
Crematorium
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators
at Wo Hop Shek
Crematorium
|
Quarterly EM&A Report (Apr 2021 to Jun
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report
(June 2021)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Quarterly EM&A
Report (Feb 2021- Apr 2021)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (June 2021)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Quarterly EM&A Report (Feb 2021-
Apr 2021)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-517/2017/A
|
Expansion of Sha
Tau Kok Sewage Treatment Works
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
|
EP-510/2016
|
Police Facilities in Kong Nga
Po
|
Monthly
EM&A Report (June
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
|
|
|
|
|
|
|
EP-510/2016
|
Police Facilities in Kong Nga
Po
|
Quarterly
EM&A Report (Jan 2021 to Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
|
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Final EM&A Report
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Monthly EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Quarterly EM&A Report(Jan 2021 to Mar
2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment
Works
|
Monthly EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling North New Development Area
|
Monthly EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road
Diversion
|
Monthly
EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New Development Area
Road P1 and P2 and Associated New Kwu Tung
Interchange and Pak Shek Au Interchange
Improvement
|
Monthly EM&A
Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT -
Sewage Pumping Stations in Kwu Tung North New
Development Areaf
|
Monthly
EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Monthly
EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control Point and Associated Works
|
Monthly EM&A Report (June 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
|
FEP-01/460/2013/A
|
Development of Organic Waste Treatment
Facilities, Phase 2
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
|
|
|
|
|
|
|
FEP-01/460/2013/A
|
Development of Organic Waste Treatment
Facilities, Phase 2
|
Quarterly EM&A Report (Mar 2021 to May
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5792020_content.html
|
|
|
|
|
|
|
EP-460/2013
|
Development of Organic Waste Treatment
Facilities, Phase 2
|
Quarterly EM&A Report (Mar 2021 to May
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4602013_content.html
|
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Quarterly EM&A Report No.5 (Mar 2021 to May 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
|
EP-573/2020
|
Bay to Bay Express Cable System - Hong Kong
Segment (BtoBE-HK) – Chung Hom
Kok
|
Monthly
EM&A Report(June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5732020_content.html
|
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No. 30(June
2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
EP-503/2015/A
|
Desalination Plant at Tseung Kwan O
|
35th Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report
(June 2021)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report
(Jul 2021)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
EP-319/2009/D
|
Development of a
Biodiesel Plant at Tseung Kwan O Industrial
Estate
|
Monthly EM&A Report
(Jun 2021) (V.1)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-516/2016
|
Port
Shelter Sewerage, Stage3 – Sewerage Works at Po Toi
O
|
Monthly
EM&A Report(June
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html
|
|
|
|
|
|
|
EP-516/2016
|
Port
Shelter Sewerage, Stage3 – Sewerage Works at Po Toi
O
|
Quarterly EM&A Report (Mar 2021 to
May
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html
|
|
|
|
|
|
|
EP-516/2016
|
Port
Shelter Sewerage, Stage3 – Sewerage Works at Po Toi
O
|
Monthly EM&A Report(July
2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html
|
|
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of
Sha Tin Water Treatment Works - South Works
|
Monthly
EM&A Report No.64
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
|
|
EP-463/2013/B
|
Widening and Reconstruction of Tai Po Road (Sha Tin Section)
|
Monthly
EM&A Report(June
2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage Treatment Works
|
Quarterly Environmental Monitoring and Audit Summary
Report (Mar 2021 - May 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage Treatment Works
|
Monthly
EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
|
EP-345/2009/A
|
Inter-reservoirs Transfer Scheme (IRTS) -
Water Tunnel between Kowloon Byewash Reservoir
and Lower Shing Mun
Reservoir
|
24th Monthly EM&A Report(Rev.1)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5822020_content.html
|
|
|
|
|
|
|
- Tai Po District
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (June 2021)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Feb 2021- Apr
2021)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (June 2021)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Feb 2021- Apr
2021)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Monthly EM&A Report(June 2021) (CV/2012/05)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
|
EP-470/2013
|
NENT -
Utilization of Treated Sewage Effluent (TSE) from Shek
Wu Hui Sewage Treatment Works
|
Monthly
EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling North New Development Area
|
Monthly
EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly
EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
|
EP-466/2013
|
NENT
- Castle Peak Road Diversion
|
Monthly EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New Development Area
Road P1 and P2 and Associated New Kwu Tung
Interchange and Pak Shek Au Interchange
Improvement
|
Monthly EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
|
EP-469/2013
|
NENT -
Sewage Pumping Stations in Kwu Tung North New
Development Areaf
|
Monthly EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Monthly EM&A Report(Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
|
- Tsuen Wan District
|
|
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Monthly Environmental Monitoring And Audit
Report (June 2021)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic
Waste Treatment Facilities, Phase I
|
Seventy-third
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (June
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan
2021 to Mar 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Construction Phase
Monthly EM&A Report No.66
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Annual EM&A Report
No.5
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Construction Phase
Monthly EM&A Report No.66
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong
International Airport into a Three-Runway System
|
Annual EM&A Report
No.5
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
EP-226/2005/G
|
Development of an EcoPark in Tuen Mun Area 38
|
Quarterly Environmental
Monitoring and Audit Report (Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5882021_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste
Management Facilities Phase 1
|
Monthly EM&A Report No.36(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste
Management Facilities Phase 1
|
12th Quarterly EM&A Report(Rev.A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong
Kong Offshore LNG Terminal - Works associated with the double berth jetty
at LNG Terminal
|
Monthly
Environmental Monitoring and Audit (EM&A) Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power
Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Quarterly Environmental Monitoring and Audit
(EM&A) Report(Jan 2021 to Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html
|
|
|
|
|
|
|
FEP-02/558/2018/A
|
Hong
Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline
for Lamma Power Station (LPS) and the associated
Gas Receiving Station (GRS) in LPS
|
Quarterly
Environmental Monitoring and Audit (EM&A) Report(Jan 2021 to Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html
|
|
|
|
|
|
|
FEP-03/558/2018/A
|
Hong
Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline
for Black Point Power Station (BPPS) and the associated Gas Receiving
Station (GRS) in BPPS
|
Quarterly
Environmental Monitoring and Audit (EM&A) Report(Jan 2021 to Mar 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html
|
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works
for Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
|
EP-534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works
for Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Second Annual
Environmental Monitoring & Audit (EM&A) Report (HY/2017/10)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
11th Quarterly
Environmental Monitoring and Audit Report (HY/2017/10)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Third Annual
Environmental Monitoring & Audit (EM&A) Report (HY/2017/10)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation and Water Management Facilities at the
Castle Peak Power Station (CPPS)
|
Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
|
EP-507/2016/C
|
Installation of One
additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point
Power Station
|
Monthly EM&A Report
no.55
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
|
FEP-03/507/2016/C
|
Additional Gas-fired
Generation units Project - Installation of one additional gas-fired
generation unit (CCGT Unit No. 2) at the Black Point Power Station
|
Monthly EM&A Report
no.55
|
https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html
|
|
|
|
|
|
|
EP-507/2016/C
|
Installation of One
additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point
Power Station
|
Quarterly EM&A
Report No.18
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
|
EP-507/2016/C
|
Installation of One
additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point
Power Station
|
Monthly EM&A Report
no.56
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
|
FEP-03/507/2016/C
|
Additional Gas-fired
Generation units Project - Installation of one additional gas-fired
generation unit (CCGT Unit No. 2) at the Black Point Power Station
|
Monthly EM&A Report
no.56
|
https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html
|
|
|
|
|
|
|
FEP-03/507/2016/C
|
Additional Gas-fired
Generation units Project - Installation of one additional gas-fired
generation unit (CCGT Unit No. 2) at the Black Point Power Station
|
Quarterly EM&A
Report No.18
|
https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html
|
|
|
|
|
|
|
FEP-03/507/2016/C
|
Additional Gas-fired
Generation units Project - Installation of one additional gas-fired
generation unit (CCGT Unit No. 2) at the Black Point Power Station
|
Final EM&A Review
Report
|
https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html
|
|
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
|
EP-311/2008/E
|
Proposed Comprehensive Development at Wo Shang Wai, Yuen Long
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
|
|
|
|
|
|
|
EP-565/2019
|
Yuen Long Effluent Polishing Plant
|
Monthly EM&A Report(June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html
|
|
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (June
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan
2021 to Mar 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
- Central & Western District
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (June 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jul 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report
(Jul 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Marine Work
|
Monthly EM&A Report June
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Mar 2021 to May
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Mar 2021 to May
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Marine Work
|
Quarterly EM&A Report (Mar 2021 to May
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (June
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jul
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (June
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan
2021 to Mar 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central Interchange (Contract No.
HY/2009/15)
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Tunnel Work
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central Interchange (Contract No.
HY/2009/15)
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Tunnel Work
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(June 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (June 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jul 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
FEP-03/376/2009
|
DP2-Road P2 and other
roads which are classified as primary/district distributor roads
|
Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (June
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (June
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Marine Work
|
Monthly EM&A Report (June
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Mar 2021 to May
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Mar 2021 to May
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HY/2010/08) - Marine Work
|
Quarterly EM&A Report (Mar 2021 to May
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (June
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jul
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (June
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan
2021 to Mar 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(June 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central Interchange (Contract No.
HY/2009/15)
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Tunnel Work
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central Interchange (Contract No.
HY/2009/15)
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Tunnel Work
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
- Eastern District
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (June 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jul 2021) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (June
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (June
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Marine Work
|
Monthly EM&A Report (June
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Mar 2021 to May
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Mar 2021 to May
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Marine Work
|
Quarterly EM&A Report (Mar 2021 to May
2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (June
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan
2021 to Mar 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (June
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jul
2021)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(June 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report
(June 2021)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report
(Jul 2021)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
|
FEP-13/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central Interchange (Contract No.
HY/2009/15)
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Tunnel Work
|
Monthly EM&A Report
(June 2021)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass - Central Interchange (Contract No.
HY/2009/15)
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central - Wanchai Bypass Tunnel (North Point Section) and Island
Eastern Corridor Link
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HY/2010/08) -
Tunnel Work
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Quarterly EM&A
Report (Mar 2021 to May 2021)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
|
- Southern District
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (June
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan
2021 to Mar 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-537/2017
|
Proposed
Extension of Academic Block, The Swire Institute of Marine Science, Faculty
of Science, The University of Hong Kong, Cape D’Aguilar
Road, Shek O
|
Monthly
EM&A Report No.45
|
http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html
|
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at Ocean Park
|
Monthly
EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
|
EP-573/2020
|
Bay to Bay Express Cable System - Hong Kong
Segment (BtoBE-HK) – Chung Hom
Kok
|
Monthly EM&A Report(June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5732020_content.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(June 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (June 2021) (ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report (June 2021) (ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (June 2021)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Feb 2021 to Apr
2021)(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Quarterly EM&A Report (Feb 2021 to Apr
2021)(ED/2018/05)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Jun
2021)(ED/2018/04)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (June 2021)
(ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (June 2021) (ED/2018/05)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
Quarterly EM&A Report (Apr 2021 to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-563/2018
|
The Development of AFCD Animal Management and
Animal Welfare Building Complex in Kai Tak
Development
|
Monthly Audit Report No. 09
|
https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau
Ma Tei East (HY/2014/08)
|
Monthly EM&A Report (June
2021)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West (HY/2014/07)
|
Monthly EM&A Report (June
2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (June
2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (June
2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report (June
2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (June
2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (June
2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (June
2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (June 2021) (ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (June 2021) (ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (June 2021)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Feb 2021 to Apr
2021)(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-564/2018
|
Lei Yue Mun Waterfront Enhancement Project
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East (HY/2014/08)
|
Monthly EM&A Report
(June 2021)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route -
Kai Tak West (HY/2014/07)
|
Monthly EM&A Report
(June 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak
Sports Park
|
EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak
Sports Park
|
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak
Sports Park
|
Quarterly EM&A Report (Apr 2021
to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
- Sham Shui Po
District
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (June
2021)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan
2021 to Mar 2021)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (June 2021)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (June 2021)
(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (June
2021)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Feb 2021
to Apr 2021)(ED/2018/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Jul 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
Quarterly EM&A Report (Apr 2021
to Jun 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
|
- Yau
Tsim Mong District
|
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving the West
Kowloon Cultural District
|
Monthly EM&A Report (June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping
Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert
|
Submission of Monthly
EM&A Report No.42
|
https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
|
|
EP-455/2013
|
Proposed Road
Improvement Works in West Kowloon Reclamation Development Phase 1
|
Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(June 2021)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East (HY/2014/08)
|
Monthly EM&A Report
(June 2021)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route -
Kai Tak West (HY/2014/07)
|
Monthly EM&A Report
(June 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
|
FEP-01/436/2012/F
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report
(June 2021)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1972020_content.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201808.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201420.html
|
|
|
|
|
|
|
EP-457/2013/D
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5942021hy201802.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report
(June 2021)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|