Monthly Update of Documents Uploaded

 

       Documents Uploaded to the EIAO Website

 

       (for the period between 16 November 2010 to 15 December 2010)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

Application for EIA Study Brief

 

ESB-218/2010

Modification of Hing Wah Street between Lai Chi Kok Road and Cheung Sha Wan Road for Two-Way Traffic

EIA Study Brief

http://www.epd.gov.hk/eia/register/study/latest/esb-218.pdf

 

Application for Permission to Apply Directly for Environmental Permit

 

DIR-210/2010

Yau Tong Bay - Decommissioning of Shipyard Sites

Decision of DEP

http://www.epd.gov.hk/eia/register/permission/conditions/dir2102010.htm

 

DIR-209/2010

Proposed Installation of Integrated Mobile Phone Base Station in Lantau North (Extension) Country Park Lantau Island, N.T.

Decision of DEP

http://www.epd.gov.hk/eia/register/permission/conditions/dir2092010.htm

 

Application for Approval of EIA Report

 

EIA-187/2010

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

EIA Report

http://www.epd.gov.hk/eia/register/report/eiareport/eia_1872010/index.html

 

EIA-186/2010

Integration of Siu Ho Wan and Silver Mine Bay Water Treatment Works

EIA Report

http://www.epd.gov.hk/eia/register/report/eiareport/eia_1862010/index.html

 

Application for Environmental Permit

 

AEP-407/2010

South Island Line (East)

Environmental Permit issued (EP-407/2010)

http://www.epd.gov.hk/eia/register/permit/latest/ep4072010.htm

 

AEP-406/2010

TETRA Radio Base Station at Kai Kung Leng Lam Tsuen Country Park, Yuen Long, N.T.

Environmental Permit issued (EP-406/2010)

http://www.epd.gov.hk/eia/register/permit/latest/ep4062010.htm

 

AEP-405/2010

Pond Fish Wholesale Market in Yuen Long

Environmental Permit issued (EP-405/2010)

http://www.epd.gov.hk/eia/register/permit/latest/ep4052010.htm

 

Application for Variation of an Environmental Permit

 

VEP-331/2010

Tuen Mun - Chek Lap Kok Link

Environmental Permit issued (EP-354/2009/A)

http://www.epd.gov.hk/eia/register/permit/latest/vep331.htm

 

VEP-330/2010

Harbour Area Treatment Scheme (HATS) Stage 2A

Environmental Permit issued (EP-322/2008/E)

http://www.epd.gov.hk/eia/register/permit/latest/vep330.htm

 

VEP-329/2010

Kwun Tong Line Extension

Environmental Permit issued (EP-399/2010/A)

http://www.epd.gov.hk/eia/register/permit/latest/vep329.htm

 

VEP-328/2010

Proposed Temporary Bus Depot at Hing Wah Street West, West Kowloon Reclamation

Environmental Permit issued (EP-246/2006/B)

http://www.epd.gov.hk/eia/register/permit/latest/vep328.htm

 

VEP-327/2010

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Environmental Permit issued (EP-353/2009/B)

http://www.epd.gov.hk/eia/register/permit/latest/vep327.htm

 

Application for Further Environmental Permit

 

FEP-118/2010

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Tunnel Works

Environmental Permit issued (FEP-06/364/2009/A)

http://www.epd.gov.hk/eia/register/permit/latest/fep1182010.htm

 

FEP-117/2010

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Environmental Permit issued (FEP-04/356/2009)

http://www.epd.gov.hk/eia/register/permit/latest/fep1172010.htm

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Supplementary Contamination Assessment Plan for Nam Cheong Barging Point

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Contamination Assessment Plan for Lai Chi Kok Works Area (Rev B)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-262/2007/B

Permanent Aviation Fuel Facility for Hong Kong International Airport

Design Audit Report (update version for entire Phase 1)

http://www.epd.gov.hk/eia/english/register/index8/vep2512008_content.html

 

EP-237/2005/B

Drainage Improvements in Southern Lantau

Faunal Survey & Translocation - Report for Frog Capture Survey and Translocation

http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html

 

FEP-03/364/2009

Central - Wan Chai Bypass (CWB) at FEHD Whitfield Depot (Contract No. HY/2009/17) - Advanced piling works

Layout Plan & Construction Noise Management Plan

http://www.epd.gov.hk/eia/english/register/index7/fep1102010_content.html

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Visual Mitigation Measures Plan

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

Submission as required by Environmental Permit Condition - EM&A Reports

 

 

Island District

Central & Western District

 

 

 

North District

Wan Chai District

 

 

 

Sai Kung District

Eastern District

 

 

 

Sha Tin District

Southern District

 

 

 

Tai Po District

Kowloon City District

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

- Island District

 

EP-229/2005

Development of SkyCity Golf Course

EM&A Quarterly Compliance Report (Aug 2010 to Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2292005_content.html

 

EP-01/059/2000/B

The Theme Park at Penny's Bay, Lantau

Monthly Environmental Monitoring and Audit Report for 60th Operating Month (12 Aug 2010 to 11 Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html

 

FEP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 62)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

EP-071/2000/C

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

EP-071/2000/C

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

EP-170/2003/B

Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha

Bi-Monthly EM&A Report for ecological mitigation audit and landscape & visual resources audit (Jul 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2152006_content.html

 

EP-170/2003/B

Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2152006_content.html

 

EP-281/2007

Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities

Quarterly EM&A Summary Report (Jun 2010 to Aug 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2812007_content.html

 

EP-281/2007/A

Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A Report (No.2) (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html

 

EP-281/2007/A

Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities

Monthly Impact Monitory Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html

 

EP-281/2007/A

Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A Report (No.3) (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html

 

EP-282/2007

Outlying Islands Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall

Monthly EM&A Report (No.1) (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html

 

EP-282/2007

Outlying Islands Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall

Monthly EM&A Report (No.2) (Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html

 

- North District

 

FEP-04/347/2009/A

Construction of a Secondary Boundary Fence at Sha Tau Kok (Remaining Section)

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html

 

FEP-04/347/2009/A

Construction of a Secondary Boundary Fence at Sha Tau Kok (Remaining Section)

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html

 

FEP-03/347/2009

Construction of a Secondary Boundary Fence at Sha Tau Kok

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html

 

FEP-03/347/2009

Construction of a Secondary Boundary Fence at Sha Tau Kok

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html

 

FEP-02/347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma Chau Control Point to Ng Tung River)

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html

 

FEP-01/347/2009

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road - Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai Po to Lok Ma Chau Control Point"

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Sep 2010) (Stage 1)

http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Oct 2010) (Stage 1)

http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Quarterly EM&A Report (Jun 2010 to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

- Sai Kung District

 

FEP-319/2009/A

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Quarterly Environmental Monitoring & Audit Summary Report (Jun 2010 to Aug 2010) (Version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html

 

FEP-319/2009/A

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly Environmental Monitoring & Audit Report (Apr 2010) (Version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html

 

FEP-319/2009/A

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly Environmental Monitoring & Audit Report (Jul 2010) (Version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html

 

FEP-319/2009/A

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly Environmental Monitoring & Audit Report (Aug 2010) (Version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html

 

FEP-319/2009/A

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly Environmental Monitoring & Audit Report (Sep 2010) (Version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html

 

EP-134/2002/H

Fill Bank at Tseung Kwan O Area 137

Quarterly EM&A Report (Contract No.: CV/2009/02) (Jun 2010 to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html

 

EP-134/2002/H

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Contract No.: CV/2009/02) (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html

 

EP-134/2002/H

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Contract No.: CV/2009/02) (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html

 

- Sha Tin District

 

EP-332/2009

Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha Phase One Project

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3322009_content.html

 

EP-332/2009

Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha Phase One Project

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3322009_content.html

 

EP-332/2009

Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha Phase One Project

Quarterly EM&A Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3322009_content.html

 

- Tai Po District

 

EP-265/2007

Tai Po Sewage Treatment Works, Stage V

Quarterly Environmental and Audit Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

EP-265/2007

Tai Po Sewage Treatment Works, Stage V

Monthly Environmental and Audit Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

EP-265/2007

Tai Po Sewage Treatment Works, Stage V

Monthly Environmental and Audit Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

EP-223/2005/A

Drainage Improvement Works in Upper Tai Po River

Monthly EM&A Report (Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html

 

EP-223/2005/A

Drainage Improvement Works in Upper Tai Po River

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html

 

- Tsuen Wan District

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Baseline Monitoring Report (Part 12)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-01/059/2000/B

The Theme Park at Penny's Bay, Lantau

Monthly Environmental Monitoring and Audit Report for 60th Operating Month (12 Aug 2010 to 11 Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html

 

FEP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 62)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2009/05, DC/2007/23, DE/2009/02)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2009/05)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

- Tuen Mun District

 

EP-342/2009/A

Traffic Improvements to Tuen Mun Road Town Centre Section

Monthly EM&A Report (Sep 2010) (Rev 3)

http://www.epd.gov.hk/eia/english/register/index8/vep3012010_content.html

 

EP-342/2009/A

Traffic Improvements to Tuen Mun Road Town Centre Section

Monthly EM&A Report (Oct 2010) (Final)

http://www.epd.gov.hk/eia/english/register/index8/vep3012010_content.html

 

EP-296/2007

Proposed Joint User Complex and Wholesale Fish Market at Area 44 Tuen Mun

Monthly Environmental Monitoring & Audit Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2962007_content.html

 

EP-296/2007

Proposed Joint User Complex and Wholesale Fish Market at Area 44 Tuen Mun

Monthly Environmental Monitoring & Audit Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2962007_content.html

 

EP-226/2005/A

Development of an EcoPark in Tuen Mun Area 38

Environmental Monitoring and Audit Monthly EM&A Report (Jul 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2212006_content.html

 

EP-226/2005/A

Development of an EcoPark in Tuen Mun Area 38

Environmental Monitoring and Audit Monthly EM&A Report (Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2212006_content.html

 

EP-210/2005/A

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Quarterly Environmental Monitoring and Audit Report (Jun 2010 to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html

 

EP-210/2005/A

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly Environmental Monitoring and Audit Report (CV/2009/02) (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html

 

EP-210/2005/A

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly Environmental Monitoring and Audit Report (CV/2009/02) (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html

 

EP-251/2006

Emissions Control Project at Castle Peak Power Station "B" Units

Environmental Monitoring and Audit Monthly Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2512006_content.html

 

EP-251/2006

Emissions Control Project at Castle Peak Power Station "B" Units

Environmental Monitoring and Audit Monthly Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2512006_content.html

 

- Yuen Long District

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Baseline Monitoring Report (Part 12)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-263/2007

Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13

8th Quarterly EM&A Summary Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2632007_content.html

 

EP-263/2007

Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2632007_content.html

 

EP-263/2007

Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2632007_content.html

 

EP-220/2005

Yuen Long and Kam Tin Sewerage and Sewage Disposal Kam Tin Trunk Sewerage Phase I and Au Tau Trunk Sewers

8th Bi-Annual EM&A Report (Oct 2009 to Mar 2010) (Contract no.DC/2005/02)

http://www.epd.gov.hk/eia/english/register/aep/ep2202005_content.html

 

- Kwai Tsing District

 

EP-121/2002/A

Demolition of Kwai Chung Incineration Plant

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2842009_content.html

 

EP-121/2002/A

Demolition of Kwai Chung Incineration Plant

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2842009_content.html

 

EP-085/2000/E

Route 9 between Tsing Yi and Cheung Sha Wan

2nd Operational monitoring Report and Final Operational monitoring Report

http://www.epd.gov.hk/eia/english/register/index8/vep2762008_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Baseline Monitoring Report (Part 12)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2009/05, DC/2007/23, DE/2009/02)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2009/05)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

- Central & Western District

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Jun to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Jun to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Quarterly EM&A Report (Jun to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Sept 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Jun to Aug 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-286/2007/B

The Expansion of Heliport Facilities at Macau Ferry Terminal

The Operational Phase EM&A Monitoring Report No.14

http://www.epd.gov.hk/eia/english/register/index8/vep2802008_content.html

 

EP-235/2005/B

Landslide Preventive Works at Po Shan, Mid-levels

Monthly Operation Phase Landscape and Visual Audit Report No.6 (Jun 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2442007_content.html

 

EP-235/2005/B

Landslide Preventive Works at Po Shan, Mid-levels

Monthly Operation Phase Landscape and Visual Audit Report No.7 (Jul 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2442007_content.html

 

EP-235/2005/B

Landslide Preventive Works at Po Shan, Mid-levels

Monthly Operation Phase Landscape and Visual Audit Report No.8 (Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2442007_content.html

 

EP-235/2005/B

Landslide Preventive Works at Po Shan, Mid-levels

Monthly Operation Phase Landscape and Visual Audit Report No.9 (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2442007_content.html

 

EP-235/2005/B

Landslide Preventive Works at Po Shan, Mid-levels

Monthly Operation Phase Landscape and Visual Audit Report No.10 (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2442007_content.html

 

EP-313/2008/C

West Island Line

Environmental Monitoring & Audit Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html

 

EP-313/2008/C

West Island Line

Environmental Monitoring & Audit Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html

 

EP-313/2008/C

West Island Line

Baseline Monitoring Report (Part 10)

http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html

 

EP-313/2008/C

West Island Line

Baseline Monitoring Report (Part 11)

http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Quarterly EM&A Report No.1 (Aug to Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2009/05, DC/2007/23, DE/2009/02)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2009/05)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

- Wan Chai District

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Jun to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Jun to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Quarterly EM&A Report (Jun to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Sept 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Quarterly EM&A Report (Jun to Aug 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP- 239/2006/B

Hong Kong Convention and Exhibition Centre Extension Project

3rd Operational Phase Monthly Environmental Monitoring and Audit Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2602008_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2009/05, DC/2007/23, DE/2009/02)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2009/05)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

- Eastern District

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Baseline Monitoring Report (Aug 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2009/05, DC/2007/23, DE/2009/02)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2009/05)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

- Southern District

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

EP-249/2006/A

Repositioning and Long Term Operation Plan of Ocean Park

Quarterly Environmental Monitoring and Audit Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html

 

EP-249/2006/A

Repositioning and Long Term Operation Plan of Ocean Park

Monthly Environmental Monitoring and Audit Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html

 

EP-249/2006/A

Repositioning and Long Term Operation Plan of Ocean Park

Monthly Environmental Monitoring and Audit Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2009/05, DC/2007/23, DE/2009/02)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2009/05)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

- Kowloon City District

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Jun to Aug 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

- Kwun Tong District

 

Nil

 

- Sham Shui Po District

 

EP-253/2006

Mass Transit Railway - Lai Chi Kok Station Cheung Lai Street Pedestrian Subway and Entrances Works

Monthly Environmental Monitoring And Audit Report (16 Sep 2010 to 15 Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2532006_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Baseline Monitoring Report (Part 12)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2009/05, DC/2007/23, DE/2009/02)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jun to Aug 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

EP-322/2008/D

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Oct 2010) (DC/2009/05)

http://www.epd.gov.hk/eia/english/register/index8/vep3222010_content.html

 

- Wong Tai Sin District

 

Nil

 

- Yau Tsim Mong District

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Baseline Monitoring Report (Part 12)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Quarterly EM&A Report No.1 (Aug to Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

Others

 

New / Revised EIAO Guidance Notes

http://www.epd.gov.hk/eia/hb/content/index.htm