Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
Nil
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
DIR-222/2012
|
Tolo Harbour Sewerage of Unsewered Areas,
Stage II - Shui
Chuen Au Street Sewer
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2222012.htm
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
Nil
|
|
|
|
Application
for Environmental Permit
|
|
|
|
Nil
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
VEP-384/2012
|
South Island Line (East)
|
Environmental Permit issued
(EP-407/2010/B)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3842012.htm
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
FEP-142/2012
|
Drainage Diversion Works For the Comprehensive Residential
Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung
|
Environmental Permit issued
(FEP-02/428/2011/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1422012.htm
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
EP-349/2009/G
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail
Link
|
Baseline Ground-borne Noise Monitoring Report Pt.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3602012_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape
and visual Impact Monitoring Result (No.21) (Oct 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape
and visual Impact Monitoring Result (No.22) (Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape
and visual Impact Monitoring Result (No.23) (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape
and visual Impact Monitoring Result (No.24) (Jan 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape
and visual Impact Monitoring Result (No.25) (Feb 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape
and visual Impact Monitoring Result (No.26) (Mar 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape
and visual Impact Monitoring Result (No.27) (Apr 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape
and visual Impact Monitoring Result (No.28) (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Landscape
and visual Impact Monitoring Result (No.29) (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Construction
and Demolition Material Management Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging, Management
and Capping of sediment Disposal Facility at Sha Chau
|
35th
Monthly Progress Report for Contaminated Mud Pits at Sha Chau (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Sediment
Management Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Archaeological
Action Plan (AAP) for Sacred Hill (North)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-349/2009/H
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail
Link
|
Tree
Planting and Landscape Plan for Yuen Long District (Remainder) (Revision 1)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3732012_content.html
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
- Island District
|
|
|
|
FEP-01/097/2001/C
|
Water Recreation Centre at
Penny's Bay (part & remaining part)
|
Monthly Environmental Monitoring
and Audit Report (No. 84)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
FEP-01/097/2001/C
|
Water Recreation Centre at
Penny's Bay (part & remaining part)
|
Monthly Environmental Monitoring
and Audit Report (No. 85)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan
Cable System (SJC) Hong Kong Segment
|
Eighth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan
Cable System (SJC) Hong Kong Segment
|
Ninth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan
Cable System (SJC) Hong Kong Segment
|
Twelfth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-01/059/2000/B
|
The Theme Park at Penny's Bay,
Lantau
|
Monthly Environmental Monitoring
and Audit Report for 83th Operating Month (12 Jul 2012-11 Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html
|
|
|
|
EP-01/059/2000/B
|
The Theme Park at Penny's Bay,
Lantau
|
Monthly Environmental Monitoring
and Audit Report for 84th Operating Month (12 Aug 2012-11 Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html
|
|
|
|
EP-281/2007/A
|
Outlying
Islands Sewerage Stage 1 Phase 2 -
Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities
|
Quarterly
EM&A Report (May 2012 to Jul 2012) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
|
EP-282/2007
|
Outlying
Islands Sewerage Stage 1 Phase 1
Part 2 - Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall
|
Monthly
EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
|
EP-083/2000
|
Conversion
of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly
Environmental Monitoring And Audit Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
EP-248/2006
|
Lamma
Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit
Project
|
Quarterly
EM&A Report (Apr to Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
|
EP-287/2007
|
Lamma
Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly
EM&A Report (Apr to Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
EP-071/2000/C
|
1,800MW
Gas-Fired Power Station at Lamma Extension
|
Monthly
Environmental Monitoring and Audit Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
- North District
|
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence and new sections of
Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
- Sai Kung District
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan
Cable System (SJC) Hong Kong Segment
|
Eighth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan
Cable System (SJC) Hong Kong Segment
|
Ninth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan
Cable System (SJC) Hong Kong Segment
|
Twelfth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-319/2009/A
|
Development of a Biodiesel Plant
at Tseung Kwan O Industrial Estate
|
Monthly Environmental Monitoring
& Audit Report (Jul 2012) (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
|
EP-397/2010
|
Renewable Energy Supply on Town Island
(also known as Dawn
Island)
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3972010_content.html
|
|
|
|
FEP-01/410/2010
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey
Club Sai Kung Outdoor Training Camp
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1272011_content.html
|
|
|
|
- Sha Tin District
|
|
|
|
Nil
|
|
|
|
- Tai Po District
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Jul
2012) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Quarterly EM&A Report (Apr to
Jun 2012) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Aug
2012) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Aug 2012)
(DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Sep
2012) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-398/2010
|
Installation of the Proposed
132kV Cable Circuit Connecting with Ting Lai Road Substation and
Pak Shek Kok Substation
|
Monthly EM&A Report (No.21)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3982010_content.html
|
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B
|
Monthly Environmental and Audit
Report (Jul 2012) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B
|
Monthly Environmental and Audit
Report (Jul 2012) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B
|
Monthly Environmental and Audit
Report (Aug 2012) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B
|
Monthly Environmental and Audit
Report (Aug 2012) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly EM&A Report (Jul 2012) (DC/2007/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
-
Tsuen Wan District
|
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan
and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report (Jul
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan
and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar to
May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (No.32)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23, DC/2009/10, DC/2009/A, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
-
Tuen Mun District
|
|
|
|
EP-331/2009
|
Proposed Widening of Tsing Lun Road
|
Monthly EM&A Report (Jul
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
|
EP-331/2009
|
Proposed Widening of Tsing Lun Road
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Monthly EM&A Report (Jul
2012) Final
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Monthly EM&A Report (Aug 2012) Final
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
|
EP-210/2005/A
|
Expansion
and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly
Environmental Monitoring and Audit Report (CV/2009/02) (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
|
EP-210/2005/A
|
Expansion
and Extension of Fill Bank at Tuen Mun Area 38
|
Quarterly
Environmental Monitoring and Audit Report (Jun to Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
|
EP-226/2005/A
|
Development
of an EcoPark in Tuen Mun Area 38
|
Quarterly
EM&A Compliance Report (Apr 2012 to Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2212006_content.html
|
|
|
|
EP-334/2009
|
Sludge
Treatment Facilities
|
Quarterly
EM&A Report (Jun 2012 to Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3342009_content.html
|
|
|
|
- Yuen Long District
|
|
|
|
EP-327/2009
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Quarterly EM&A Report (May to Jul 2012) No.10
|
http://www.epd.gov.hk/eia/english/register/aep/ep3272009_content.html
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence and new sections of
Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
- Kwai Tsing District
|
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan
and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report (Jul
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan
and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar to
May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (No.32)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23, DC/2009/10, DC/2009/A, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
- Central & Western District
|
|
|
|
EP-313/2008/C
|
West Island Line
|
Environmental Monitoring &
Audit Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html
|
|
|
|
EP-273/2007
|
Laying of Western Cross
Harbour Main and Associated
Land Mains from West Kowloon to Sai
Ying Pun
|
Monthly EM&A Report (Jul
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-273/2007
|
Laying of Western Cross
Harbour Main and Associated
Land Mains from West Kowloon to Sai
Ying Pun
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar to
May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (No.32)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23, DC/2009/10, DC/2009/A, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Monthly EM&A Report (Jul
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
EP-313/2008/E
|
West Island Line
|
EM&A Report No.37
|
http://www.epd.gov.hk/eia/english/register/index8/vep3722012_content.html
|
|
|
|
EP-286/2007/B
|
Expansion of Heliport Facilities
at Macau Ferry Terminal
|
Monthly EM&A Report No.22
|
http://www.epd.gov.hk/eia/english/register/index8/vep2802008_content.html
|
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
- Wan Chai District
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar to
May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (No.32)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23, DC/2009/10, DC/2009/A, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Monthly EM&A Report (Jul
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection
Works at Causeway
Bay Typhoon
Shelter
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection
Works at Causeway
Bay Typhoon
Shelter
|
Monthly EM&A Report No.10
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
- Eastern District
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar to
May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (No.32)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23, DC/2009/10, DC/2009/A, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Monthly EM&A Report (Jul
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West
Drainage Tunnel
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection
Works at Causeway
Bay Typhoon
Shelter
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection
Works at Causeway
Bay Typhoon
Shelter
|
Monthly EM&A Report No.10
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
|
EP-401/2010
|
Installation of Submarine Gas
Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak
Airport
Development
|
Monthly EM&A Report No.3 (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun to
Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
|
- Southern District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar to
May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (No.32)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23, DC/2009/10, DC/2009/A, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan
Cable System (SJC) Hong Kong Segment
|
Eighth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan
Cable System (SJC) Hong Kong Segment
|
Ninth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan
Cable System (SJC) Hong Kong Segment
|
Twelfth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-249/2006/B
|
Repositioning and Long Term
Operation Plan of Ocean
Park
|
Quarterly Environmental
Monitoring and Audit Report (Apr to Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3262012_content.html
|
|
|
|
EP-249/2006/B
|
Repositioning and Long Term
Operation Plan of Ocean
Park
|
Monthly Environmental Monitoring
and Audit Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3262012_content.html
|
|
|
|
EP-287/2007
|
Lamma
Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly
EM&A Report (Apr to Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
- Kowloon City District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Quarterly Monthly EM&A Report(May
to Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly Monthly EM&A
Report(May to Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly
EM&A Report (Jun 2012 to Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly
EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
EP-401/2010
|
Installation of Submarine Gas
Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak
Airport
Development
|
Monthly EM&A Report No.3 (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
|
- Kwun Tong District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Quarterly Monthly EM&A
Report(May to Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly Monthly EM&A
Report(May to Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving
Kai Tak Development
|
Monthly EM&A Report(Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly
EM&A Report (Jun 2012 to Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly
EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
- Sham Shui Po District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Mar to
May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Jul
2012) ver1.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (No.32)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23, DC/2009/10, DC/2009/A, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
- Wong Tai Sin District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Quarterly Monthly EM&A
Report(May to Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly Monthly EM&A Report(May
to Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly
EM&A Report (Jun 2012 to Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly
EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
- Yau Tsim Mong District
|
|
|
|
EP-273/2007
|
Laying of Western Cross
Harbour Main and Associated
Land Mains from West Kowloon to Sai
Ying Pun
|
Monthly EM&A Report (Jul
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-273/2007
|
Laying of Western Cross
Harbour Main and Associated
Land Mains from West Kowloon to Sai
Ying Pun
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-349/2009/G
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3602012_content.html
|
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and Tin West Kowloon
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|