Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the
period between 16 Sep
2013
to 15 Oct
2013)
|
|
|
Application No. / Permit No.
|
Project Title
|
Document Name
|
Hyperlink
|
|
|
Application for EIA Study Brief
|
|
|
ESB-266/2013
|
Desalination Plant at Tseung Kwan O
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/profile/latest/esb266/esb266.pdf
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
DIR-233/2013
|
Asia Pacific Gateway (APG) - Tseung
Kwan O
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2332013.pdf
|
|
|
Application for Approval of EIA
Report
|
|
|
EIA-215/2013
|
West Kowloon Cultural District
|
Approval Conditions
|
http://www.epd.gov.hk/eia/register/report/conditions/aeiar2152013.pdf
|
|
|
Application for Environmental Permit
|
|
|
AEP-453/2013
|
Underpass Road and Austin Road
Flyover Serving the West Kowloon
Cultural District
|
Environmental
Permit issued (EP-453/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4532013.htm
|
|
|
AEP-455/2013
|
Proposed Road Improvement
Works in West Kowloon
Reclamation Development Phase 1
|
Environmental
Permit issued (EP-455/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4552013.htm
|
|
|
AEP-460/2013
|
Development of Organic
Waste Treatment Facilities, Phase 2
|
Environmental
Permit issued (EP-460/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4602013.htm
|
|
|
AEP-465/2013
|
NENT - San Tin Highway and Fanling Highway
Kwu Tung Section
Widening (Between San Tin Interchange and Po
Shek Wu Interchange)
|
Environmental
Permit issued (EP-465/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4652013.htm
|
|
|
AEP-466/2013
|
NENT - Castle Peak Road Diversion
|
Environmental
Permit issued (EP-466/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4662013.htm
|
|
|
AEP-467/2013
|
NENT - Kwu
Tung North New Development Area Road P1 and P2 and
Associated New Kwu Tung
Interchange and Pak Shek Au Interchange
Improvement
|
Environmental
Permit issued (EP-467/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4672013.htm
|
|
|
AEP-468/2013
|
NENT - Kwu
Tung North New Development Area Road D1 to D5
|
Environmental
Permit issued (EP-468/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4682013.htm
|
|
|
AEP-469/2013
|
NENT - Sewage Pumping
Stations in Kwu Tung
North New Development Area
|
Environmental
Permit issued (EP-469/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4692013.htm
|
|
|
AEP-470/2013
|
NENT - Utilization of
Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works
|
Environmental
Permit issued (EP-470/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4702013.htm
|
|
|
AEP-471/2013
|
NENT - Po
Shek Wu Interchange Improvement
|
Environmental
Permit issued (EP-471/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4712013.htm
|
|
|
AEP-472/2013
|
NENT - Fanling
Bypass Western Section
|
Environmental
Permit issued (EP-472/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4722013.htm
|
|
|
AEP-473/2013
|
NENT - Fanling
Bypass Eastern Section
|
Environmental
Permit issued (EP-473/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4732013.htm
|
|
|
AEP-474/2013
|
NENT - Shek
Wu Hui Sewage Treatment Works - Further Expansion
at Fanling North New Development Area
|
Environmental
Permit issued (EP-474/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4742013.htm
|
|
|
AEP-475/2013
|
NENT - Reprovision
of temporary Wholesale Market in Fanling North
New Development Area
|
Environmental
Permit issued (EP-475/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4752013.htm
|
|
|
AEP-476/2013
|
NENT - Sewage Pumping
Stations in Fanling North New Development Area
(FLNDA)
|
Environmental
Permit issued (EP-476/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4762013.htm
|
|
|
AEP-477/2013
|
Development of Lok Ma Chau Loop
|
Environmental
Permit issued (EP-477/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4772013.htm
|
|
|
AEP-478/2013
|
NWNT Development - Trunk
Sewers, Sewage Pumping Stations and Rising Mains - Stage 3 Yuen Long Area
13 sewage pumping station
|
Environmental
Permit issued (EP-478/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4782013.htm
|
|
|
AEP-479/2013
|
Yuen Long South Sewage
Pumping Station
|
Environmental
Permit issued (EP-479/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4792013.htm
|
|
|
AEP-480/2013
|
Au Tau
Sewage Pumping Station
|
Environmental
Permit issued (EP-480/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4802013.htm
|
|
|
AEP-481/2013
|
Improvement Works to Cable
Landing Point at Tai
Lei Island,
Peng Chau
|
Environmental
Permit issued (EP-481/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4812013.htm
|
|
|
AEP-482/2013
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Environmental
Permit issued (EP-482/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4822013.htm
|
|
|
Application for Variation of an
Environmental Permit
|
|
|
VEP-415/2013
|
Sheung
Shui to Lok Ma Chau Spur Line
|
Environmental
Permit issued (EP-129/2002/G)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4152013.htm
|
|
|
VEP-416/2013
|
Sheung
Shui to Lok Ma Chau Spur Line
|
Environmental
Permit issued (FEP-06/129/2002/G)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4162013.htm
|
|
|
VEP-417/2013
|
Sludge Treatment
Facilities
|
Environmental
Permit issued (EP-334/2009/D )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4172013.htm
|
|
|
VEP-418/2013
|
Sludge Treatment
Facilities
|
Environmental
Permit issued (FEP-01/334/2009/D )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4182013.htm
|
|
|
VEP-419/2013
|
South
Island Line (East)
|
Environmental
Permit issued (EP-407/2010/D)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4192013.htm
|
|
|
VEP-421/2013
|
Repositioning and Long
Term Operation Plan of Ocean
Park
|
Environmental
Permit issued (EP-249/2006/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4212013.htm
|
|
|
Application for Further Environmental
Permit
|
|
|
Nil
|
|
|
Submission as required by
Environmental Permit Condition - Design / Environmental Submissions
|
|
|
EP-433/2011
|
Asia
Submarine-cable Express (ASE) - Tseung Kwan O
|
17th Weekly Site Inspection Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-349/2009/J
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Monitoring and Emergency Response Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson
Road
|
Quarterly EM&A Report (Jun 2013 to Aug
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-352/2009/D
|
Hong Kong -
Zhuhai - Macao Bridge Hong Kong Link Road
|
Updated Archaeological Action Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Landscape Plan
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
Submission as required by
Environmental Permit Condition - EM&A Reports
|
|
|
|
Island District
|
Central & Western
District
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
Sai
Kung District
|
Eastern District
|
|
|
|
|
Sha
Tin District
|
Southern District
|
|
|
|
|
Tai Po District
|
Kowloon
City District
|
|
|
|
|
Tsuen
Wan District
|
Kwun
Tong District
|
|
|
|
|
Tuen
Mun District
|
Sham Shui Po District
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
Kwai
Tsing District
|
Yau
Tsim Mong District
|
|
|
|
- Island District
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping of Contaminated Sediment Disposal
Facility to the South of The Brothers
|
Monthly Progress Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
96th Monthly EM&A Report (12 Aug 2013 to 11 Sep
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
97th Monthly EM&A Report (12 Sep 2013 to 11 Oct
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1
Phase 1 Part 2 ??Yung Shue Wan Sewerage, Sewage
Treatment Works and Outfall
|
Monthly EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1
Phase 1 Part 2 ??Yung Shue Wan Sewerage, Sewage
Treatment Works and Outfall
|
Quarterly EM&A Report (Jun to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1
Phase 1 Part 2 ??Yung Shue Wan Sewerage, Sewage
Treatment Works and Outfall
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1
Phase 2 - Sok Kwu Wan
Sewage Collection, Treatment and Disposal Facilities
|
Monthly EM&A Report (Aug 2013) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1
Phase 2 - Sok Kwu Wan
Sewage Collection, Treatment and Disposal Facilities
|
Monthly EM&A Report (Sep 2013) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Mar to May 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Sep 2013) Revision 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly EM&A Report (Mar to May 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring & Audit Report
(Aug 2013) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-281/2007
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal
Facilities
|
Quarterly EM&A Summary Report (May 2013 to Jul
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2812007_content.html
|
|
|
EP-349/2009/J
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma
Extension
|
Monthly Environmental Monitoring and Audit Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7)
into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Sep
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part &
remaining part)
|
Monthly Environmental Monitoring and Audit Report (No.
98)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Sep 2013) Revision 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Revised Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
-
North District
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai Boundary Control Point and Associated Works
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Monthly EM&A Report (Sep 2013) (Stage 1)
|
http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html
|
|
|
- Sai Kung District
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O
Area 137
|
Quarterly EM&A Report
(Jun to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
FEP-02/428/2011/A
|
Drainage Diversion Works For the Comprehensive
Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung
|
12th Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html
|
|
|
FEP-02/428/2011/A
|
Drainage Diversion Works For the Comprehensive
Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung
|
13th Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link -
Tai Wai to Hung Hom
Section
|
Monthly EM&A Report No.13
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-02/410/2010/A
|
Phase III Redevelopment of The Hong
Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3972013_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O
Area 137
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
EP-319/2009/A
|
Development of a Biodiesel
Plant at Tseung Kwan O Industrial Estate
|
Monthly Environmental Monitoring & Audit
Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
EP-319/2009/C
|
Development of a Biodiesel
Plant at Tseung Kwan O Industrial Estate
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3912013_content.html
|
|
|
EP-319/2009/C
|
Development of a Biodiesel
Plant at Tseung Kwan O Industrial Estate
|
Monthly EM&A Report (Jun 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3912013_content.html
|
|
|
- Sha Tin District
|
|
|
EP-438/2012/D
|
Shatin to Central Link -
Tai Wai to Hung Hom
Section
|
Monthly EM&A Report No.13
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
- Tai Po District
|
|
|
EP-265/2007
|
Tai Po Sewage
Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Aug 2013)
(DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po Sewage
Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Aug 2013)
(DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha
Tin and Tai Po
|
Monthly EM&A Report (Aug 2013) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha
Tin and Tai Po
|
Monthly EM&A Report (Sep 2013) (DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly EM&A Report (Aug 2013) (DC/2007/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai Boundary Control Point and Associated Works
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Monthly EM&A Report (Sep 2013) (Stage 1)
|
http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Monthly
EM&A Report (Aug 2013) (DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
- Tsuen Wan District
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan and Kwai Chung - Tsuen Wan
Drainage Tunnel
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Tuen Mun District
|
|
|
FEP-01/334/2009/A
|
Sludge Treatment Facilities
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3452011_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun
Road Town Centre Section
|
Monthly EM&A Report(Sep 2013åš—?/span>
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point Sewage
Treatment Works
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road,
Tuen Mun
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-226/2005
|
Development of an EcoPark in Tuen Mun Area 38
|
Quarterly EM&A Report (Jan 2013 to Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2262005_content.html
|
|
|
- Yuen Long District
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Monthly EM&A Report (Sep
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Quarterly EM&A Report (Jun to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road (Section 3)
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
EP-349/2009/J
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html
|
|
|
- Kwai Tsing District
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan and Kwai Chung - Tsuen Wan
Drainage Tunnel
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Central & Western
District
|
|
|
EP-313/2008/G
|
West Island Line
|
Monthly EM&A Report No.50
|
http://www.epd.gov.hk/eia/english/register/index8/vep4042013_content.html
|
|
|
FEP-01/122/2003
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0622003_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation
Project
|
Monthly EM&A Report (No.23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including
its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II
- Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II
- Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-407/2010/C
|
South Island
Line (East)
|
Monthly EM&A Report (Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3992013_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island
- Hong Kong West Drainage Tunnel
|
Monthly EM&A Report (Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island
- Hong Kong West Drainage Tunnel
|
Monthly EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
-
Wan Chai District
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly EM&A Report (Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including
its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II
- Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II
- Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
FEP-01/416/2011
|
ShaTin to Central Link
Protection Works at Causeway
Bay Typhoon
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1262011_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island
- Hong Kong West Drainage Tunnel
|
Monthly EM&A Report (Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island
- Hong Kong West Drainage Tunnel
|
Monthly EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
FEP-01/122/2003
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0622003_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
- Eastern District
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly EM&A Report (Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including
its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II
- Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II
- Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai
West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
FEP-01/416/2011
|
ShaTin to Central Link
Protection Works at Causeway
Bay Typhoon
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1262011_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and Associated Facilities
from To Kwa Wan to North Point for Former Kai Tak
Airport Development
|
16th Monthly EM&A Report (Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson Crematorium
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island
- Hong Kong West Drainage Tunnel
|
Monthly EM&A Report (Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island
- Hong Kong West Drainage Tunnel
|
Monthly EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-442/2012
|
EMSD Hong Kong Workshop at Sheung On Street, Chai Wan
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html
|
|
|
-
Southern District
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Kowloon City District
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report(Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report(Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and Associated Facilities
from To Kwa Wan to North Point for Former Kai Tak
Airport Development
|
16th Monthly EM&A Report (Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link -
Tai Wai to Hung Hom
Section
|
Monthly EM&A Report No.13
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report No.13 (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
- Kwun Tong District
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report(Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report(Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for
Development at Anderson Road
|
Monthly EM&A Report(Sep 2013åš—?/span>
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
- Sham Shui Po District
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour
Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Wong Tai Sin District
|
|
|
EP-438/2012/D
|
Shatin to Central Link -
Tai Wai to Hung Hom
Section
|
Monthly EM&A Report No.13
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report(Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report(Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
- Yau Tsim Mong District
|
|
|
EP-438/2012/D
|
Shatin to Central Link -
Tai Wai to Hung Hom
Section
|
Monthly EM&A Report No.13
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report No.13 (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-317/2009
|
Tsim Sha Tsui
Station Northern Subway
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-349/2009/J
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
|
|
|
|
|