Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the period between 16 Nov 2014 to 15 Dec 2014)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
Application
for EIA Study Brief
|
|
|
ESB-281/2014
|
Sai O Trunk Sewer Sewage Pumping Station
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-281.pdf
|
|
|
ESB-282/2014
|
Improvement Dredging for Lamma
Power Station Navigation Channel
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb282/esb282.pdf
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
Nil
|
|
|
Application
for Approval of EIA Report
|
|
|
EIA-224/2014
|
In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2242014/cover.htm
|
|
|
Application
for Environmental Permit
|
|
|
Nil
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
VEP-456/2014
|
Tuen Mun - Chek Lap Kok Link
|
Environmental Permit issued (EP-354/2009/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4562014.htm
|
|
|
Application
for Further Environmental Permit
|
|
|
FEP-158/2014
|
Hong Kong Offshore Wind Farm in Southeastern
Waters
|
Environmental Permit issued (FEP-01/341/2009)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1582014.htm
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
EP-487/2014
|
Tai Shue Wan Development at Ocean Park
|
Woodland
Compensation Plan (Rev.B)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line
Extension
|
Ground-borne
Noise Review Report (Phase 1 and Phase 2)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-438/2012/H
|
Shatin to
Central Link - Tai Wai to Hung Hom Section
|
Continuous
Noise Monitoring Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
EP-407/2010/E
|
South
Island Line (East)
|
Landscape
and Visual Plan-Part 2:Chung Hom Shan Magazine
Site
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
- Island District
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Sep 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly EM&A Report (Mar to May 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Sep 2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Eighth Monthly EM&A Report (Sep 2014)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Eleventh Monthly EM&A Report (Oct 2014)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1 Phase 1 Part
2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1 Phase 1 Part
2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Quarterly EM&A Summary Report (Jun 2014
to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1 Phase 2 -
Sok Kwu Wan Sewage
Collection, Treatment and Disposal Facilities
|
Monthly EM&A Report (Sep 2014)
(DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1 Phase 2 -
Sok Kwu Wan Sewage
Collection, Treatment and Disposal Facilities
|
Quarterly EM&A Report (May 2014 to Jul
2014) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Sep
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Sep
2014)(HY/2011/09 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-353/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Sep
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3432011_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Sep 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Mar to May 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-352/2009
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Quarterly EM&A Report (Jun to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3522009_content.html
|
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental Monitoring and Audit
Report (No. 110)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
109th Monthly EM&A Report (12 Sep 2014
to 11 Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping of
Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly Progress Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-267/2007
|
Proposed 132kV Submarine Cable Route
for Airport "A" to Castle Peak Power Station Cable Circuit
|
Monthly EM&A Report (Sep
2014)(DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2672007_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit
Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines
(GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit
Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-229/2005
|
Development of SkyCity
Golf Course
|
Quarterly EM&A Report (Aug
2014 to Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2292005_content.html
|
|
|
- North District
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Quarterly EM&A Report (May to Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in Northern New
Territories - Package C
|
Monthly EM&A Report(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-324/2008
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
- Sai Kung
District
|
|
|
EP-448/2013
|
Natural Terrain Hazard Mitigation Works at
Study Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung
|
Monthly EM&A
Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung
Kwan O Area 137
|
Quarterly EM&A Report (Jul to Sep
2014)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung
Kwan O Area 137
|
Monthly EM&A Report (Sep 2014)
(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung
Kwan O Area 137
|
Monthly EM&A Report (Sep 2014)Revise
(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong
Line Extension
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
- Sha Tin
District
|
|
|
EP-135/2002/J
|
Sha Tin New Town - Stage II TrunkRoad T3 and Associated Roadworks
|
Monthly Environmental Monitoring and Audit
Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4282014_content.html
|
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
- Tai Po District
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Sep
2014) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Quarterly Environmental and Audit Report
(Jul to Sep 2014) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Quarterly Environmental and Audit Report
(Jul to Sep 2014) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-419/2011/A
|
Sediment Removal at Yim
Tin Tsai (East) Fish Culture Zone
|
Monthly Environmental Monitoring and Audit
Report (Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3562012_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha
Tin and Tai Po
|
Quarterly EM&A Report (Jan to Mar 2014)
(DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha
Tin and Tai Po
|
Quarterly EM&A Report (Apr to Jun 2014)
(DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha
Tin and Tai Po
|
Monthly EM&A Report (Jul 2014)
(DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-324/2008
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
- Tsuen Wan District
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May
to Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Jun to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/23)(Jun
2014 to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
- Tuen Mun District
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road Town Centre
Section
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-331/2009
|
Widening of Tsing
Lun Road, Tuen Mun
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank
at Tuen Mun Area 38
|
Quarterly EM&A Report (Jul 2014 to Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank
at Tuen Mun Area 38
|
Monthly EM&A Report (Sep 2014) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-267/2007
|
Proposed 132kV Submarine Cable Route
for Airport "A" to Castle Peak Power Station Cable Circuit
|
Monthly EM&A Report (Sep
2014)(DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2672007_content.html
|
|
|
EP-226/2005
|
Development of an EcoPark
in Tuen Mun Area 38
|
Quarterly EM&A Report (Jul 2014 to Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2262005_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
- Yuen Long District
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road
(Section 3)
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
EP-411/2011
|
Improvement to Pok
Oi Interchange
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
- Kwai Tsing District
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin
and its Approach Channel
|
Monthly Environmental Monitoring &
Audit Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May
to Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Jun to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/23)(Jun
2014 to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
- Central & Western District
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass
over MTR Tsuen Wan Line (Contract no. HK/2010/06)
- Marine Work
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Wan Chai West (Contract No. HK/2012/08) - Marine
Work
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May
to Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Jun to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/23)(Jun
2014 to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-313/2008/I
|
West Island Line
|
Monthly EM&A Report(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4302014_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2014)
(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
- Wan Chai District
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass
over MTR Tsuen Wan Line (Contract no. HK/2010/06)
- Marine Work
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Wan Chai West (Contract No. HK/2012/08) - Marine
Work
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May
to Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Jun to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/23)(Jun
2014 to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-444/2012/A
|
MTR Wan Chai
Station Lee Tung Street Subway
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2014)
(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
- Eastern District
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass
over MTR Tsuen Wan Line (Contract no. HK/2010/06)
- Marine Work
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Wan Chai West (Contract No. HK/2012/08) - Marine
Work
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May
to Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Jun to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/23)(Jun
2014 to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former Kai Tak Airport Development
|
Final
Monthly EM&A Review Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning
of Cape Collinson Crematorium
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2014)
(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
- Southern District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May
to Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Jun to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/23)(Jun
2014 to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
- Kowloon City District
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Quarterly EM&A Report (Jun to Aug
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly
EM&A Report (May to Jul 2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Quarterly EM&A Report (Jun to Aug
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former Kai Tak Airport Development
|
Final
Monthly EM&A Review Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report No.25 (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong
Line Extension
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts
(EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former
Kai Tak Airport
|
Monthly Environmental Monitoring &
Audit Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
- Kwun Tong
District
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Quarterly EM&A Report (Jul to Sep
2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Monthly EM&A Report (Sep
2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard
Sites
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Quarterly EM&A Report (Jun to Aug
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly
EM&A Report (May to Jul 2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Quarterly EM&A Report (Jun to Aug
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts
(EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former
Kai Tak Airport
|
Monthly Environmental Monitoring &
Audit Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
- Sham Shui Po District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May
to Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Jun to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/23)(Jun
2014 to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
- Wong Tai Sin District
|
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Quarterly EM&A Report (Jun to Aug
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly
EM&A Report (May to Jul 2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Quarterly EM&A Report (Jun to Aug
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Sep
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts
(EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former
Kai Tak Airport
|
Monthly Environmental Monitoring &
Audit Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
- Yau Tsim Mong District
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report No.25 (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong
Line Extension
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
|
|
|
|
|
|
|