|
| |
|
|
|
Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
|
(for the period between 16
November 2020 to 15 December 2020)
|
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
|
ESB-335/2020
|
Engineering and Technical Feasibility Study for
Proposed Extension of Yuen Long Industrial Estate
|
Study Briefs
|
https://www.epd.gov.hk/eia/register/study/latest/esb-335.pdf
|
|
|
|
|
|
ESB-336/2020
|
Upgrading of Nim Wan
Road (North)
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/esb336/esb336.pdf
|
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
|
DIR-279/2020
|
Drainage Improvement Works at Nam Wa
Po
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2792020.pdf
|
|
|
|
|
|
DIR-280/2020
|
Sewage Pumping Stations at North East New Territories
|
Project
Profiles
|
https://www.epd.gov.hk/eia/register/profile/latest/dir280/dir280.pdf
|
|
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
|
Nil
|
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
|
AEP-582/2020
|
Drainage Improvement Works at Shek Kiu Tau
|
Environmental
Permit issued (EP-582/2020)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5822020.htm
|
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
|
VEP-584/2020
|
Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road
|
Environmental Permit
issued (EP-541/2017/A)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5842020.htm
|
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
|
FEP-203/2020
|
Hong Kong - Zhuhai -
Macao Bridge Hong Kong Boundary Crossing Facilities
|
Environmental Permit
issued (FEP-02/353/2009/K)
|
https://www.epd.gov.hk/eia/register/permit/latest/fep2032020.htm
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Landscape Mitigation Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
|
EP-555/2018
|
New Wang Tong River Bridge
|
Cancellation of Water Quality Monitoring at Station
W3
|
https://www.epd.gov.hk/eia/english/register/aep/ep5552018_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Operational Phase Noise Monitoring Proposal
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town Extension
|
Eco-shoreline Implementation Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Revised Traffic Noise Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
|
- Island District
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Oct 2020) (HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Oct 2020) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
FEP-01/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1942019_content.html
|
|
|
|
|
|
FEP-02/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power
Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1952019_content.html
|
|
|
|
|
|
FEP-03/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1962019_content.html
|
|
|
|
|
|
EP-071/2000/D
|
1,800 MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit Report
Unit L11& L12 (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
EP-071/2000/D
|
1,800 MW Gas-Fired Power Station at Lamma Extension
|
Environmental Monitoring and Audit Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's
Bay (part & remaining part)
|
Monthly Environmental Monitoring
and Audit Report (No. 183)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Oct 2020) (HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.26(Rev B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.28(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.26(Rev C)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
9th Quarterly EM&A Report(Rev.A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
8th Quarterly EM&A Report(Rev.B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
7th Quarterly EM&A Report(Rev.B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.25(Rev
B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.24(Rev
B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.22(Rev
C)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.21(Rev
C)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.21(Rev D)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7)
into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Oct
2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Oct 2020)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring
and Audit Report (May 2020 to Jul 2020) (HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring
and Audit Report (Aug 2020 to Oct 2020) (HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring
and Audit Report (Oct 2020)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Oct 2020)(HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-489/2014
|
Expansion of
Hong Kong International Airport into a Three-Runway System
|
Construction
Phase Monthly EM&A Report No.58
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai Chi Yuen Cemetery Extension
|
Monthly EM&A
Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
|
|
EP-535/2017
|
Improvement Dredging
for Lamma Power Station Navigation Channel
|
Monthly EM&A
Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html
|
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park
at Penny's Bay, Lantau
|
182th Monthly
EM&A Report (12 Oct 2020 to 11 Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Sixty-fifth
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New
Town Extension
|
Monthly EM&A
Report(Sep 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town Extension
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
- North District
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Quarterly EM&A Report(Jul 2020 to Sep
2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
EP-534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
FEP-01/460/2013
|
Development of
Organic Waste Treatment Facilities, Phase 2
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1912019_content.html
|
|
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monthly EM&A Report (Aug 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monthly EM&A Report (Oct 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Oct 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Aug 2020 - Oct
2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Annual EM&A Report (Nov 2019 - Oct 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment
Works
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
EP-517/2017/A
|
Expansion of Sha Tau Kok Sewage Treatment Works
|
Monthly EM&A
Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Monthly EM&A Report
(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Monthly EM&A Report
(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
EP-510/2016
|
Police Facilities in Kong Nga
Po
|
Monthly EM&A
Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road Diversion
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New
Development Area Road P1 and P2 and Associated New Kwu
Tung Interchange and Pak Shek Au Interchange
Improvement
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(YL/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(YL/2015/01)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway
between Island House Interchange and Fanling
|
Annual EM&A Report
(Nov 2019 - Oct 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly EM&A Report (Oct 2020) (V.1)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
|
EP-503/2015/A
|
Desalination
Plant at Tseung Kwan O
|
27th
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
EP-503/2015/A
|
Desalination
Plant at Tseung Kwan O
|
9th
Quaterly EM&;A Report(Aug 2020 to Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Oct 2020)(Version 3)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.22(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
EP-134/2002/N
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly Environmental Monitoring and Audit Report (Oct
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html
|
|
|
|
|
|
EP-134/2002/N
|
Fill Bank at Tseung Kwan O Area
137
|
Quarterly Environmental Monitoring and Audit Report (Aug
2020 to Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html
|
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of
Sha Tin Water Treatment Works - South Works
|
Monthly EM&A Report No.56
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
|
EP-463/2013/B
|
Widening and Reconstruction of Tai Po Road (Sha Tin Section)
|
Annual EM&A Report (Dec 2018 to Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
EP-463/2013/B
|
Widening and Reconstruction of Tai Po Road (Sha Tin Section)
|
Quarterly EM&A Report (Mar 2020 to May 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
EP-345/2009
|
Inter-reservoirs Transfer Scheme (IRTS) - Water
Tunnel between Kowloon Byewash Reservoir and
Lower Shing Mun
Reservoir
|
16th Monthly EM&A Report(Rev.2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3452009_content.html
|
|
|
|
|
|
- Tai Po District
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Oct 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Aug 2020 - Oct
2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Annual EM&A Report (Nov 2019 - Oct 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment
Works
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road Diversion
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New
Development Area Road P1 and P2 and Associated New Kwu
Tung Interchange and Pak Shek Au Interchange
Improvement
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway
between Island House Interchange and Fanling
|
Annual EM&A Report
(Nov 2019 - Oct 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
|
- Tsuen Wan
District
|
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Quarterly Environmental Monitoring And
Audit Report (Aug 2020 to Oct 2020)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Monthly Environmental Monitoring And Audit
Report (Nov 2020)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jul 2020 to Sep
2020) (DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-489/2014
|
Expansion of
Hong Kong International Airport into a Three-Runway System
|
Construction
Phase Monthly EM&A Report No.58
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Sixty-fifth Monthly EM&A Report(Oct
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Oct 2020)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Oct 2020)(HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring
and Audit Report (May 2020 to Jul 2020) (HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring
and Audit Report (Aug 2020 to Oct 2020) (HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring
and Audit Report (Oct 2020)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.26(Rev B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.21(Rev D)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.28(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
9th Quarterly EM&A Report(Rev.A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
8th Quarterly EM&A Report(Rev.B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
7th Quarterly EM&A Report(Rev.B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.25(Rev
B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.24(Rev
B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.22(Rev
C)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.26(Rev C)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.21(Rev
C)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
FEP-01/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1942019_content.html
|
|
|
|
|
|
FEP-02/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power
Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1952019_content.html
|
|
|
|
|
|
FEP-03/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1962019_content.html
|
|
|
|
|
|
EP-534/2017
|
Site Formati3on and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation and
Water Management Facilities at the Castle Peak Power Station (CPPS)
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
EP-210/2005/D
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html
|
|
|
|
|
|
EP-210/2005/D
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Quarterly EM&A Report(Aug 2020 to Oct
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.58
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(YL/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(YL/2015/01)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
|
EP-311/2008/E
|
Proposed Comprehensive Development
at Wo Shang Wai, Yuen
Long
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
|
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jul 2020 to Sep
2020) (DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin
and its Approach Channel
|
Final EM&A Reoort
|
https://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin
and its Approach Channel
|
Quarterly Environmental Monitoring & Audit Report
(Jun 2020 to Jul 2020)(CV/2013/04)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
|
|
|
- Central & Western District
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Aug 2020 to Oct 2020)
(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Jun 2020 to Aug 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Jun 2020 to Aug 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Jun 2020 to Aug 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jul 2020 to Sep
2020) (DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
- Wan Chai
District
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Aug 2020 to Oct 2020)
(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central
- Wan Chai Bypass - Central Interchange (Contract
No. HY/2009/18)
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Jun 2020 to Aug 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Jun 2020 to Aug 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Jun 2020 to Aug 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jul 2020 to Sep
2020) (DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
- Eastern District
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Aug 2020 to Oct 2020)
(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central
- Wan Chai Bypass - Central Interchange (Contract
No. HY/2009/18)
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Jun 2020 to Aug 2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2020 to Aug
2020)(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Jun 2020 to Aug 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Jun 2020 to Aug 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Jun 2020 to Aug 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jul 2020 to Sep
2020) (DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Oct 2020)(Version
3)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug 2020 to Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
- Southern District
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jul 2020 to Sep
2020) (DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-537/2017
|
Proposed Extension of Academic Block, The Swire Institute
of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Monthly EM&A Report No.37
|
http://www.epd.gov.hk/eia/8english/register/aep/ep5372017_content.html
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at
Ocean Park
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Oct 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Jul 2020 to Sep
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov
2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Oct
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Oct
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Nov
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Nov
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Oct
2020)(ED/2018/04)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Oct 2020) (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Oct 2020)(KL/2014/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Quarterly EM&A Report (Jul 2020 to Sep
2020)(KL/2014/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
EP-563/2018
|
The Development of AFCD Animal Management and Animal
Welfare Building Complex in Kai Tak Development
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Oct 2020)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Oct 2020)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Oct 2020)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West (HY/2014/07)
|
Monthly EM&A Report (Oct 2020)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Oct 2020)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Oct 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov
2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Jul 2020 to Sep
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Oct
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Oct
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Nov
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam
Tin Tunnel and Associated Works
|
Monthly EM&A Report (Oct 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Oct 2020)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Oct 2020)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Oct 2020)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West (HY/2014/07)
|
Monthly EM&A Report (Oct 2020)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Oct 2020)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
- Sham Shui Po
District
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jul 2020 to Sep
2020) (DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Jul 2020 to Sep
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov
2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Oct
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Oct
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Oct
2020)(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Nov
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
|
- Yau Tsim
Mong District
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving the West
Kowloon Cultural District
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Monthly EM&A Report (Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Oct 2020)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Oct 2020)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Oct 2020)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West (HY/2014/07)
|
Monthly EM&A Report (Oct 2020)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Oct 2020)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping Station and Dry Weather Flow
Interceptor at Cherry Street Box Culvert
|
Submission of Monthly EM&A
Report No.34
|
https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping Station and Dry Weather Flow
Interceptor at Cherry Street Box Culvert
|
Submission of Monthly EM&A
Report No.35
|
https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|