Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

ESB-219/2011

Tuen Mun Western Bypass

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb219/esb219.pdf

 

 

ESB-220/2011

In-situ Reprovisioning of Sha Tin Water Treatment Works – South Works – Designs and Construction

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb220/esb220.pdf

 

 

ESB-221/2011

Hung Shui Kiu New Development Area

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb221/esb221.pdf

 

 

ESB-222/2011

Kai Tak Development – Roads D3A & D4A

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb222/esb222.pdf

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

DIR-211/2011

Reprovision of Bridges D1 and T in West Kowloon

Decision of DEP

http://www.epd.gov.hk/eia/register/permission/conditions/dir2112011.htm

 

 

Application for Approval of EIA Report

 

 

EIA-191/2010

Central Police Station Conservation and Revitalisation Project

EIA Report

http://www.epd.gov.hk/eia/register/report/eiareport/eia_1912010/index.html

 

 

Application for Environmental Permit

 

 

AEP-411/2011

Improvement to Pok Oi Interchange

Environmental Permit issued (EP-411/2011)

http://www.epd.gov.hk/eia/register/permit/latest/ep4112011.htm

 

 

AEP-413/2011

Integration of Siu Ho Wan and Silver Mine Bay Water Treatment Works

Environmental Permit issued (EP-413/2011)

http://www.epd.gov.hk/eia/register/permit/latest/ep4132011.htm

 

 

Application for Variation of an Environmental Permit

 

 

VEP-333/2010

West Island Line

Environmental Permit issued (EP-313/2008/D)

http://www.epd.gov.hk/eia/register/permit/latest/vep333.htm

 

 

VEP-334/2010

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Environmental Permit issued (EP-349/2009/B)

http://www.epd.gov.hk/eia/register/permit/latest/vep334.htm

 

 

VEP-335/2011

Traffic Improvements to Tuen Mun Road Town Centre Section

Environmental Permit issued (EP-342/2009/B)

http://www.epd.gov.hk/eia/register/permit/latest/vep3352011.htm

 

 

Application for Further Environmental Permit

 

 

FEP-119/2011

West Kowloon Reclamation Roads G & L

Environmental Permit issued (FEP-01/090/2001)

http://www.epd.gov.hk/eia/register/permit/latest/fep1192011.htm

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

EP-303/2008

Drainage Improvement in Sha Tin and Tai Po

Update EM&A Manual

http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Waste Management Plan (Rev.2.1) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Waste Management Plan (Rev.01) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Tree Planting and Landscape Plan for Yuen Long District (Yick Yuen)

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

 

EP-349/2009/A

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Supplementary Contamination Assessment Plan for Mai Lai Road Works Area

http://www.epd.gov.hk/eia/english/register/index8/vep3232010_content.html

 

 

Submission as required by Environmental Permit Condition - EM&A Reports

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District     

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP-312/2008/A

Disposal of Contaminated Sediment - Dredging, Management and Capping of sediment Disposal Facility at Sha Chau

17th Monthly Progress Report for Contaminated Mud Pits at Sha Chau (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html

 

 

EP-01/059/2000/B

The Theme Park at Penny's Bay, Lantau

Monthly Environmental Monitoring and Audit Report for 63rd Operating Month (12 Nov 2010 to 11 Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html

 

 

EP-01/059/2000/B

The Theme Park at Penny's Bay, Lantau

Monthly Environmental Monitoring and Audit Report for 62nd Operating Month (12 Oct 2010 to 11 Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html

 

 

FEP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 64)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

EP-281/2007/A

Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html

 

 

EP-282/2007

Outlying Islands Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall

Monthly EM&A Report (No.3) (Nov 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html

 

 

- North District

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Quarterly EM&A Report (Feb 2010 to Apr 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Quarterly EM&A Report (May 2010 to Jul 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Quarterly EM&A Report (Aug 2010 to Oct 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report ( Dec 2010 )

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

 

FEP-01/347/2009

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road - Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai Po to Lok Ma Chau Control Point"

Monthly EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html

 

 

FEP-02/347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma Chau Control Point to Ng Tung River)

Monthly EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html

 

 

FEP-03/347/2009

Construction of a Secondary Boundary Fence at Sha Tau Kok

Monthly EM&A Report ( Dec 2010 )

http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html

 

 

FEP-04/347/2009/A

Construction of a Secondary Boundary Fence at Sha Tau Kok (Remaining Section)

Monthly EM&A Report ( Dec 2010 )

http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html

 

 

- Sai Kung District

 

 

EP-134/2002/H

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Contract No.: CV/2009/02) (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html

 

 

EP-134/2002/H

Fill Bank at Tseung Kwan O Area 137

Quarterly EM&A Report (Contract No.: CV/2009/02) (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html

 

 

- Sha Tin District

 

 

EP-332/2009

Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha Phase One Project

Monthly EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3322009_content.html

 

 

- Tai Po District

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report (Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

- Tsuen Wan District

 

 

EP-01/059/2000/B

The Theme Park at Penny's Bay, Lantau

Monthly Environmental Monitoring and Audit Report for 63rd Operating Month (12 Nov 2010 to 11 Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html

 

 

EP-01/059/2000/B

The Theme Park at Penny's Bay, Lantau

Monthly Environmental Monitoring and Audit Report for 62nd Operating Month (12 Oct 2010 to 11 Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html

 

 

FEP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 64)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jul to Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

- Tuen Mun District

 

 

EP-210/2005/A

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly Environmental Monitoring and Audit Report (CV/2009/02) (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html

 

 

EP-210/2005/A

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Quarterly Environmental Monitoring and Audit Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html

 

 

EP-226/2005/A

Development of an EcoPark in Tuen Mun Area 38

Quarterly EM&A Report (Aug 2010 to Oct 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2212006_content.html

 

 

EP-251/2006

Emissions Control Project at Castle Peak Power Station "B" Units

Environmental Monitoring and Audit Monthly Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2512006_content.html

 

 

EP-262/2007/B

Permanent Aviation Fuel Facility for Hong Kong International Airport

Third Bi-Monthly Landscape & Visual Audit Report

http://www.epd.gov.hk/eia/english/register/index8/vep2512008_content.html

 

 

EP-262/2007/B

Permanent Aviation Fuel Facility for Hong Kong International Airport

4th Bi-Monthly Landscape & Visual Audit Report

http://www.epd.gov.hk/eia/english/register/index8/vep2512008_content.html

 

 

EP-296/2007

Proposed Joint User Complex and Wholesale Fish Market at Area 44 Tuen Mun

Baseline Environmental Monitoring Report for Operational Phase

http://www.epd.gov.hk/eia/english/register/aep/ep2962007_content.html

 

 

EP-321/2008

Upgrading of Pillar Point Sewage Treatment Works

Monthly EM&A Report No.2

http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html

 

 

FEP-01/334/2009

Sludge Treatment Facilities

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1152010_content.html

 

 

FEP-01/334/2009

Sludge Treatment Facilities

Baseline Monitoring Report (Dec 2010) Revised

http://www.epd.gov.hk/eia/english/register/index7/fep1152010_content.html

 

 

- Yuen Long District

 

 

EP-220/2005

Yuen Long and Kam Tin Sewerage and Sewage Disposal Kam Tin Trunk Sewerage Phase I and Au Tau Trunk Sewers

4th Annual EM&A Report (Apr 2009 to Mar 2010) (Contract no.DC/2005/02)

http://www.epd.gov.hk/eia/english/register/aep/ep2202005_content.html

 

 

EP-231/2005/A

Yuen Long, Kam Tin, Ngau Tam Mei and Tin Shui Wai Drainage Improvement, Stage 1, Phase 2B - Kam Tin Secondary Drainage Channels KT14 & KT15

Quarterly EM&A Summary Report (Contract no.DC/2006/02) (Oct 2009 to Dec 2009)

http://www.epd.gov.hk/eia/english/register/index8/vep2332007_content.html

 

 

- Kwai Tsing District

 

 

EP-121/2002/A

Demolition of Kwai Chung Incineration Plant

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2842009_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jul to Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

- Central & Western District

 

 

EP-235/2005/B

Landslide Preventive Works at Po Shan, Mid-levels

Monthly Operation Phase Landscape and Visual Audit Report No.11 (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2442007_content.html

 

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

 

EP-313/2008/C

West Island Line

Environmental Monitoring & Audit Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jul to Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Sep to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

 

- Wan Chai District

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jul to Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Sep to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

 

- Eastern District

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jul to Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Monthly EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Sep to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Sep 2010 to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

- Southern District

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jul to Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Jul to Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Nov 2010)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

 

- Kowloon City District

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Sep to Nov 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

- Kwun Tong District

 

 

Nil

 

 

- Sham Shui Po District

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jul to Sep 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Nov 2010) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Dec 2010) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

- Wong Tai Sin District

 

 

Nil

 

 

- Yau Tsim Mong District

 

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Dec 2010)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html