Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
(for the period between 16 Jan 2016 to
15 Feb 2016)
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
Application
for EIA Study Brief
|
|
Nil
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
DIR-243/2015
|
Tseung Kwan O Express - Cable System
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2432015.pdf
|
|
DIR-244/2016
|
Asia-Africa-Europe-1 (AAE-1) Cable System
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir244/dir244.pdf
|
|
Application
for Approval of EIA Report
|
|
EIA-234/2015
|
Development of Anderson Road Quarry site - Rock
Cavern Developments
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2342015/index.htm
|
|
EIA-235/2015
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2352015/index.htm
|
|
Application
for Environmental Permit
|
|
AEP-506/2015
|
Queen’s Hill Sewage Pumping Station
|
Environmental Permit issued (EP-506/2015)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5062015.htm
|
|
Application
for Variation of an Environmental Permit
|
|
VEP-490/2016
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Environmental Permit issued (EP-436/2012/D)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4902016.htm
|
|
VEP-491/2016
|
Sludge Treatment Facilities
|
Environmental Permit issued (EP-334/2009/E)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4912016.htm
|
|
VEP-493/2016
|
Sludge Treatment Facilities
|
Environmental Permit issued (FEP-01/334/2009/E)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4932016.htm
|
|
Application
for Further Environmental Permit
|
|
Nil
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
EP-427/2011/A
|
Dredging, Management and Capping of
Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly Progress Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
First Weekly Impact Water Quality Monitoring
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
2nd Weekly Coral Impact Monitoring Survey
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai -
Macao Bridge Hong Kong Boundary Crossing Facilities
|
Contract Specific EM&A Manual
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-451/2013
|
Temporary Sewage Pumping Station Ancillary to
Tung Chung Area 56 Public Housing Development
|
Baseline Monitoring Methodology and Location
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
Island District
|
Central & Western District
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
- Island District
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jan 2016)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Twenty-sixth Monthly Environmental
Monitoring and Audit Report (Dec 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines
(GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit
Report (Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Monthly EM&A Report (Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Nov 2015)(HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Nov 2015)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report
(Nov 2015)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and
Audit Report (Jun 2015 to Aug 2015)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and
Audit Report (Sep to Nov 2015) (HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Quarterly Environmental Monitoring and Audit
Report (Jun 2015 to Aug 2015)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report(Dec 2015)
(HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary to
Tung Chung Area 56 Public Housing Development
|
Monthly EM&A Report (Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1 Phase 1
Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Quarterly EM&A Summary Report (May 2015
to Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
123rd Monthly EM&A Report (12 Nov 2015
to 11 Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental Monitoring and Audit
Report (No. 124)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit
Report (Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Second Quarterly EM&A Summary
Report(Sep 2015 to Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Seventh Monthly EM&A Summary Report(Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
- North District
|
|
EP-404/2011/C
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Nov 2015)
(DC/2011/06)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House Interchange
and Fanling
|
Annual EM&A Review Report (Nov 2014 to
Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further Expansion at Fanling North New Development Area
|
Monthly EM&A Report(Oct
2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
Monthly EM&A Report(Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
- Sai Kung
District
|
|
EP-134/2002/K
|
Fill Bank at Tseung
Kwan O Area 137
|
Monthly EM&A Report (Nov 2015)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
EP-448/2013
|
Natural Terrain Hazard Mitigation Works at Study
Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung
|
Monthly EM&A Report (Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
EP-134/2002/J
|
Fill Bank at Tseung
Kwan O Area 137
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
- Sha Tin
District
|
|
EP-135/2002/J
|
Sha Tin New Town - Stage II TrunkRoad T3 and Associated Roadworks
|
Monthly Environmental Monitoring and Audit Report
(Oct 2015)(Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4282014_content.html
|
|
- Tai Po District
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Annual EM&A Review Report (Nov 2014 to
Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further Expansion at Fanling North New Development Area
|
Monthly EM&A Report(Oct
2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
- Tsuen Wan District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Second Quarterly EM&A Summary
Report(Sep 2015 to Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Seventh Monthly EM&A Summary Report(Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
- Tuen Mun District
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Nov 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jan 2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Twenty-sixth Monthly Environmental
Monitoring and Audit Report (Dec 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-331/2009
|
Widening of Tsing
Lun Road, Tuen Mun
|
Monthly EM&A Report (Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
EP-331/2009
|
Widening of Tsing
Lun Road, Tuen Mun
|
Quarterly EM&A Report (Sep 2015 to Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
EP-381/2009
|
Tuen Mun Area 54
Sewage Pumping Station
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
EP-381/2009
|
Tuen Mun Area 54
Sewage Pumping Station
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Nov 2015)
(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Quarterly EM&A Report (Oct 2015 to Dec
2015) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Dec 2015)
(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
EP-321/2008/B
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html
|
|
EP-321/2008/B
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Monthly EM&A Report (Nov
2015)(DC/2008/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html
|
|
EP-226/2005/C
|
Development of an EcoPark
in Tuen Mun Area 38
|
Quarterly EM&A Report (Oct 2015 to Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4082013_content.html
|
|
- Yuen Long District
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
EP-450/2013
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
EP-411/2011
|
Improvement to Pok
Oi Interchange
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
EP-411/2011
|
Improvement to Pok
Oi Interchange
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
- Kwai Tsing District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin
and its Approach Channel
|
Quarterly Environmental Monitoring & Audit
Report (Aug 2015 to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
- Central & Western District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-313/2008/J
|
West Island Line
|
Monthly EM&A Report(Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
EP-313/2008/J
|
West Island Line
|
Final EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Dec 2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified
as primary/district distributor roads
|
Monthly EM&A Report (Dec
2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
EP-364/2009/D
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html
|
|
|
|
|
|
|
|
|
|