Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

Application for EIA Study Brief

 

Nil

 

Application for Permission to Apply Directly for Environmental Permit

 

DIR-243/2015

Tseung Kwan O Express - Cable System

Decision of DEP

http://www.epd.gov.hk/eia/register/permission/conditions/dir2432015.pdf

 

DIR-244/2016

Asia-Africa-Europe-1 (AAE-1) Cable System

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/dir244/dir244.pdf

 

Application for Approval of EIA Report

 

EIA-234/2015

Development of Anderson Road Quarry site - Rock Cavern Developments

EIA Report

http://www.epd.gov.hk/eia/register/report/eiareport/eia_2342015/index.htm

 

EIA-235/2015

Development of Anderson Road Quarry site - Road Improvement Works

EIA Report

http://www.epd.gov.hk/eia/register/report/eiareport/eia_2352015/index.htm

 

Application for Environmental Permit

 

AEP-506/2015

Queen’s Hill Sewage Pumping Station

Environmental Permit issued (EP-506/2015)

http://www.epd.gov.hk/eia/register/permit/latest/ep5062015.htm

 

Application for Variation of an Environmental Permit

 

VEP-490/2016

Shatin to Central Link - Hung Hom to Admiralty Section

Environmental Permit issued (EP-436/2012/D)

http://www.epd.gov.hk/eia/register/permit/latest/vep4902016.htm

 

VEP-491/2016

Sludge Treatment Facilities

Environmental Permit issued (EP-334/2009/E)

http://www.epd.gov.hk/eia/register/permit/latest/vep4912016.htm

 

VEP-493/2016

Sludge Treatment Facilities

Environmental Permit issued  (FEP-01/334/2009/E)

http://www.epd.gov.hk/eia/register/permit/latest/vep4932016.htm

 

Application for Further Environmental Permit

 

Nil

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

EP-427/2011/A

Dredging, Management and Capping of Contaminated Sediment Disposal Facility to the South of The Brothers

Monthly Progress Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html

 

EP-461/2013

Replacement of the Existing 11KV Submarine Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O

First Weekly Impact Water Quality Monitoring Report

http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html

 

EP-461/2013

Replacement of the Existing 11KV Submarine Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O

2nd Weekly Coral Impact Monitoring Survey Report

http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html

 

EP-353/2009/I

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Contract Specific EM&A Manual

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-451/2013

Temporary Sewage Pumping Station Ancillary to Tung Chung Area 56 Public Housing Development

Baseline Monitoring Methodology and Location

http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html

 

Submission as required by Environmental Permit Condition - EM&A Reports

 

 

Island District

Central & Western District

 

 

 

North District

Wan Chai District

 

 

 

Sai Kung District

Eastern District

 

 

 

Sha Tin District

Southern District

 

 

 

Tai Po District

Kowloon City District

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

- Island District

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Nov 2015)(HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Jan 2016)(HY/2012/07)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2015)(HY/2010/02)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2015)(HY/2013/12)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Twenty-sixth Monthly Environmental Monitoring and Audit Report (Dec 2015)(HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

EP-392/2010

Improvement of Fresh Water Supply to Cheung Chau

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html

 

EP-353/2009/I 

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly Environmental Monitoring and Audit Report (Nov 2015)(HY/2013/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-353/2009/I 

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly Environmental Monitoring and Audit Report (Nov 2015)(HY/2013/04)

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-353/2009/I 

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly Environmental Monitoring and Audit Report (Nov 2015)(HY/2013/02)

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-353/2009/I 

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Quarterly Environmental Monitoring and Audit Report (Jun 2015 to Aug 2015)(HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-353/2009/I 

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly Environmental Monitoring and Audit Report (Dec 2015)(HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-353/2009/I 

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly Environmental Monitoring and Audit Report (Dec 2015)(HY/2010/02)

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-353/2009/I 

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Quarterly Environmental Monitoring and Audit Report (Sep to Nov 2015) (HY/2013/02)

http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Quarterly Environmental Monitoring and Audit Report (Jun 2015 to Aug 2015)(HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly Environmental Monitoring and Audit Report (Dec 2015)(HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report(Dec 2015) (HY/2011/09)

http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

EP-452/2013

Temporary Sewage Pumping Station Ancillary to Tung Chung Area 56 Public Housing Development

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html

 

EP-282/2007

Outlying Islands Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall

Quarterly EM&A Summary Report (May 2015 to Jul 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

123rd Monthly EM&A Report (12 Nov 2015 to 11 Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

EP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 124)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

EP-071/2000/C

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Second Quarterly EM&A Summary Report(Sep 2015 to Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Seventh Monthly EM&A Summary Report(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

- North District

 

EP-404/2011/C 

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html

 

EP-430/2011 

Regulation of Shenzhen River Stage IV

Monthly EM&A Report (Nov 2015) (DC/2011/06)

http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html

 

EP-324/2008/D

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual EM&A Review Report (Nov 2014 to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html

 

EP-324/2008/D

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html

 

FEP-01/474/2013

NENT - Shek Wu Hui Sewage Treatment Works - Further Expansion at Fanling North New Development Area

Monthly EM&A Report(Oct 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html

 

EP-461/2013 

Replacement of the Existing 11KV Submarine Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O

Monthly EM&A Report(Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

- Sai Kung District

 

EP-134/2002/K

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Nov 2015)(CV/2013/06)

http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html

 

EP-448/2013 

Natural Terrain Hazard Mitigation Works at Study Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html

 

EP-134/2002/J

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html

 

- Sha Tin District

 

EP-135/2002/J 

Sha Tin New Town - Stage II TrunkRoad T3 and Associated Roadworks

Monthly Environmental Monitoring and Audit Report (Oct 2015)(Version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep4282014_content.html

 

- Tai Po District

 

EP-324/2008/D

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual EM&A Review Report (Nov 2014 to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html

 

EP-324/2008/D

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html

 

FEP-01/474/2013

NENT - Shek Wu Hui Sewage Treatment Works - Further Expansion at Fanling North New Development Area

Monthly EM&A Report(Oct 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html

 

- Tsuen Wan District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/23)(Aug to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Second Quarterly EM&A Summary Report(Sep 2015 to Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Seventh Monthly EM&A Summary Report(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

- Tuen Mun District

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Nov 2015)(HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Jan 2015)(HY/2012/07)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2015)(HY/2010/02)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly Environmental Monitoring and Audit Report (Dec 2015)(HY/2013/12)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Twenty-sixth Monthly Environmental Monitoring and Audit Report (Dec 2015)(HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

EP-331/2009

Widening of Tsing Lun Road, Tuen Mun

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html

 

EP-331/2009

Widening of Tsing Lun Road, Tuen Mun

Quarterly EM&A Report (Sep 2015 to Nov 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html

 

EP-381/2009

Tuen Mun Area 54 Sewage Pumping Station

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html

 

EP-381/2009

Tuen Mun Area 54 Sewage Pumping Station

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html

 

EP-210/2005/B

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report (Nov 2015) (CV/2013/06)

http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html

 

EP-210/2005/B

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Quarterly EM&A Report (Oct 2015 to Dec 2015) (CV/2013/06)

http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html

 

EP-210/2005/B

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report (Dec 2015) (CV/2013/06)

http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html

 

EP-349/2009/L

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

EP-321/2008/B

Upgrading of Pillar Point Sewage Treatment Works

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html

 

EP-321/2008/B

Upgrading of Pillar Point Sewage Treatment Works

Monthly EM&A Report (Nov 2015)(DC/2008/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html

 

EP-226/2005/C

Development of an EcoPark in Tuen Mun Area 38

Quarterly EM&A Report (Oct 2015 to Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4082013_content.html

 

- Yuen Long District

 

FEP-24/004/1998/I 

West Rail, Phase 1

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html

 

EP-450/2013

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html

 

EP-349/2009/L

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

EP-411/2011

Improvement to Pok Oi Interchange

Monthly EM&A Report (Oct 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html

 

EP-411/2011

Improvement to Pok Oi Interchange

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html

 

- Kwai Tsing District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/23)(Aug to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-349/2009/L

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

EP-426/2011/A

Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel

Quarterly Environmental Monitoring & Audit Report (Aug 2015 to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html

 

- Central & Western District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/23)(Aug to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-313/2008/J 

West Island Line   

Monthly EM&A Report(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html

 

EP-313/2008/J 

West Island Line   

Final EM&A Report

http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Dec 2015) (HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

EP-364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

FEP- 02/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html

 

FEP-05/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

FEP-07/364/2009/A

Central - Wanchai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html

 

FEP-09/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

FEP-10/364/2009/B 

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

FEP-11/364/2009/B

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html

 

 

EP-407/2010/E

South Island Line (East)

Monthly EM&A Report(Jan 2016)

http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html

 

 

EP-436/2012/C

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4822015_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

EP-408/2011/B

Central Police Station Conservation and Revitalisation Project

Monthly EM&A Report (No.50)

http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html

 

- Wan Chai District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/23)(Aug to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

EP-364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

FEP- 02/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html

 

FEP-05/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

FEP-07/364/2009/A

Central - Wanchai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html

 

FEP-09/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

FEP-10/364/2009/B 

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

FEP-11/364/2009/B

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Dec 2015) (HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

EP-436/2012/C

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4822015_content.html

 

EP-407/2010/E

South Island Line (East)

Monthly EM&A Report(Jan 2016)

http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html

 

EP-444/2012/A

MTR Wan Chai Station Lee Tung Street Subway

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html

 

- Eastern District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/23)(Aug to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (Dec 2015) (HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

EP-364/2009/D

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html

 

 

FEP-01/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html

 

FEP- 02/364/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html

 

FEP-05/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

FEP-06/364/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html

 

FEP-07/364/2009/A

Central - Wanchai Bypass Tunnel (North Point Section) and Island Eastern Corridor Link

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html

 

FEP-09/364/2009/B

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html

 

FEP-10/364/2009/B 

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html

 

FEP-11/364/2009/B

Central - Wan Chai Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel Commissioning (Contract No. HY/2011/08)

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html

 

 

EP-436/2012/C

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4822015_content.html

 

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Monthly EM&A Report (Dec 2015)(HK/2011/07)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

-  Southern District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/23)(Aug to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-487/2014

Tai Shue Wan Development at Ocean Park

Monthly EM&A Report (17 Nov 2015 - 16 Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html

 

EP-436/2012/C

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4822015_content.html

 

EP-407/2010/E

South Island Line (East)

Monthly EM&A Report(Jan 2016)

http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html

 

- Kowloon City District

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jun 2015 to Aug 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2015)(KL/2012/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Aug 2015 to Oct 2015)(KL/2012/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report (Jun 2015 to Aug 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Oct 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Nov 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Sep 2015 to Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

- Kwun Tong District

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Monthly EM&A Report (Sep 2015)(CV/2007/03)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Monthly EM&A Report (Nov 2015)(CV/2012/07)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Monthly EM&A Report (Dec 2015)(CV/2012/07)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

EP-399/2010/C

Kwun Tong Line Extension

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4622015_content.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jun 2015 to Aug 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2015)(KL/2012/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Aug 2015 to Oct 2015)(KL/2012/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report (Jun 2015 to Aug 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Oct 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Nov 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Sep 2015 to Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

- Sham Shui Po District

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/23)(Aug to Oct 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/24)(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

EP-349/2009/L

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

- Wong Tai Sin District

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Jun 2015 to Aug 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Oct 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Nov 2015)(KL/2012/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (Aug 2015 to Oct 2015)(KL/2012/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report (Jun 2015 to Aug 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Oct 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Nov 2015)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Sep 2015 to Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

- Yau Tsim Mong District

 

EP-436/2012/C

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report(Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4822015_content.html

 

EP-349/2009/L

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Nov 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

EP-440/2012

MTR Tsim Sha Tsui Station Carnarvon Subway and Entrances Modification Works

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html

 

EP-366/2009/A

Road Works at West Kowloon

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html

 

EP-414/2011 

Reprovision of Bridges D1 and T in West Kowloon

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html

 

EP-453/2013/A 

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Monthly EM&A Report (Dec 2015)

http://www.epd.gov.hk/eia/english/register/index8/vep4252014_content.html

 

EP-317/2009/A 

Tsim Sha Tsui Station Northern Subway

Monthly EM&A Report (Nov 2015)(Final)

http://www.epd.gov.hk/eia/english/register/index8/vep4232014_content.html