Monthly
Update of Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the
period between 16 December 2012 to 15 January 2013)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
ESB-253/2012
|
Expansion of Sha Tau Kok Sewage
Treatment Works
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-253.pdf
|
|
|
|
ESB-254/2012
|
Proposed Alternative Comprehensive
Development near Lin Barn Tsuen, Yuen Long, N.T.
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-254.pdf
|
|
|
|
ESB-255/2012
|
Planning and Engineering Study For
Tuen Mun Areas 40 and 46 and the Adjoining Areas
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-255.pdf
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
Nil
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
Nil
|
|
|
|
Application
for Environmental Permit
|
|
|
|
Nil
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
VEP-385/2012
|
Remaining Engineering
Infrastructure works for Pak Shek Kok Development
|
Environmental Permit issued
(EP-108/2001/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3852012.htm
|
|
|
|
VEP-386/2012
|
Sludge Treatment Facilities
|
Environmental Permit issued
(EP-334/2009/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3862012.htm
|
|
|
|
VEP-387/2012
|
Sludge Treatment Facilities
|
Environmental Permit issued
(FEP-01/334/2009/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3872012.htm
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
FEP-143/2012
|
Trunk
Road T7 in Ma On
Shan
|
Environmental Permit issued
(FEP-04/057/2000/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1432012.htm
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
EP-285/2008
|
Decommissioning of the Former Kai
Tak Airport
other than the North Apron
|
Remediation Report (Rev. 1)
|
http://202.67.153.69/eiao/english/register/aep/ep2852008_content.html
|
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Baseline
Water Quarterly Monitoring Report (Zone A)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Baseline
Water Quarterly Monitoring Report (Zone B)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Baseline Water
Quarterly Monitoring Report (Zone C)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Baseline
Coral Monitoring Survey Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
First
Weekly Site Inspection Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
|
EP-349/2009/G
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Remediation
Report for SK Stabling Sidings (Site Q)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3602012_content.html
|
|
|
|
EP-349/2009/G
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Remediation
Report for Mai Po Works Area (Site E)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3602012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Baseline Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Baseline Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Baseline Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
- Island District
|
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Monthly EM&A Report (No. 26)
(Sep 2012) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Monthly EM&A Report (No. 25) (Aug
2012) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
Tenth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC)
Hong Kong Segment
|
Eleventh Weekly
Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 - Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas
Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring
And Audit Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station
at Lamma Extension
|
Monthly Environmental Monitoring
And Audit Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
EP-282/2007
|
Outlying
Islands Sewerage Stage 1 Phase 1 Part 2
– Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall
|
Quarterly EM&A Report ( Jun to Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
|
- North District
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental Monitoring
and Audit Report (Sep 2012) Stage 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental Monitoring
and Audit Report (Aug 2012) Stage 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly Environmental
Monitoring and Audit Report (May to Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek
Crematorium
|
Quarterly EM&A Report (May - Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek
Crematorium
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Updated Environmental Monitoring and Audit
Manual
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report on MUP05 in July 2012
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report on MUP05 in August 2012
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report on MUP05 in September 2012
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report on MUP05 in October 2012
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Quarterly EM&A Report (Mar to May 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New Territories
- Package C
|
Quarterly EM&A Report (Jun to Aug 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Quarterly EM&A Report (Sep to Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Quarterly EM&A Report (Dec 2011 to Feb
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Quarterly EM&A Report (Mar 2012 to May
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New Territories
- Package C
|
Monthly EM&A Report (Jan 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Apr 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (May 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New Territories
- Package C
|
Monthly EM&A Report (Jun 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Jul 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Aug 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Sep 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Oct 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Jan 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Mar 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Apr 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-277/2007/A
|
Drainage Improvement in Northern New
Territories - Package C
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek
Crematorium
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
|
- Sai Kung District
|
|
|
|
EP-319/2009/A
|
Development of a Biodiesel Plant
at Tseung Kwan O Industrial Estate
|
Monthly Environmental Monitoring
& Audit Report (Sep 2012) (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
|
EP-319/2009/A
|
Development of a Biodiesel Plant
at Tseung Kwan O Industrial Estate
|
Quarterly Environmental
Monitoring & Audit Report (Jun to Aug 2012) (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
|
EP-319/2009/A
|
Development of a Biodiesel Plant
at Tseung Kwan O Industrial Estate
|
Monthly Environmental Monitoring
& Audit Report (Aug 2012) (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
|
EP-397/2010
|
Renewable Energy Supply on Town Island
(also known as Dawn
Island)
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3972010_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
Tenth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC)
Hong Kong Segment
|
Eleventh Weekly
Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-410/2010
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4102010_content.html
|
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly EM&A Report (Aug
2012) (Rev.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
|
- Sha Tin District
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.3
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.4
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
- Tai Po District
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental Monitoring
and Audit Report (Sep 2012) Stage 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental Monitoring
and Audit Report (Aug 2012) Stage 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly Environmental
Monitoring and Audit Report (May to Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
-
Tsuen Wan District
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-275/2007/A
|
Drainage Improvement in Tsuen Wan
and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly Environmental Monitoring
and Audit Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2642008_content.html
|
|
|
|
-
Tuen Mun District
|
|
|
|
EP-331/2009
|
Proposed Widening of Tsing Lun Road
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
|
FEP-01/334/2009/B
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3652012_content.html
|
|
|
|
FEP-01/334/2009/B
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3652012_content.html
|
|
|
|
EP-321/2008
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Monthly EM&A Report (Sep
2012) No.23
|
http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html
|
|
|
|
EP-321/2008
|
Upgrading of Pillar Point Sewage
Treatment Works
|
Monthly EM&A Report (Aug
2012) No.22
|
http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html
|
|
|
|
EP-321/2008
|
Upgrading of Pillar Point Sewage
Treatment Works
|
Quarterly EM&A Report (May
2012 to Jul 2012) No.7
|
http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html
|
|
|
|
EP-391/2010/A
|
Black
Point Gas Supply Project (First Phase)
|
Monthly
EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3402011_content.html
|
|
|
|
EP-391/2010/A
|
Black
Point Gas Supply Project (First Phase)
|
Monthly
EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3402011_content.html
|
|
|
|
EP-391/2010/A
|
Black
Point Gas Supply Project (First Phase)
|
Monthly
EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3402011_content.html
|
|
|
|
EP-391/2010/A
|
Black
Point Gas Supply Project (First Phase)
|
Monthly
EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3402011_content.html
|
|
|
|
EP-391/2010/A
|
Black
Point Gas Supply Project (First Phase)
|
Monthly
EM&A Report (Dec 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3402011_content.html
|
|
|
|
EP-210/2005/A
|
Expansion
and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly
Environmental Monitoring and Audit Report (CV/2009/02) (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
|
- Yuen Long District
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-349/2009/H
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3732012_content.html
|
|
|
|
EP-349/2009/H
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3732012_content.html
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
- Kwai Tsing District
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-275/2007/A
|
Drainage Improvement in Tsuen Wan
and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly Environmental Monitoring
and Audit Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2642008_content.html
|
|
|
|
- Central & Western District
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-408/2011/B
|
Central Police Station
Conservation and Revitalisation Project
|
Monthly EM&A Report (No.10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
EP-408/2011/B
|
Central Police Station
Conservation and Revitalisation Project
|
Monthly EM&A Report (No.11)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.15)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.14)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-273/2007
|
Laying of Western
Cross Harbour
Main and Associated Land Mains from West Kowloon
to Sai Ying Pun
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-273/2007
|
Laying of Western
Cross Harbour
Main and Associated Land Mains from West Kowloon
to Sai Ying Pun
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
EP-408/2011/A
|
Central Police Station
Conservation and Revitalisation Project
|
Third Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3502011_content.html
|
|
|
|
EP-313/2008/E
|
West Island Line
|
EM&A Report No.38
|
http://www.epd.gov.hk/eia/english/register/index8/vep3722012_content.html
|
|
|
|
- Wan Chai District
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.15)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.14)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection
Works at Causeway
Bay Typhoon Shelter
|
Monthly EM&A Report No.9
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
- Eastern District
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection
Works at Causeway
Bay Typhoon Shelter
|
Monthly EM&A Report No.9
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson
Crematorium
|
Monthly EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson
Crematorium
|
Monthly EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson
Crematorium
|
Monthly EM&A Report (Jul
2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines
and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development
|
1st Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
|
|
- Southern District
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.15)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.14)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
Tenth Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC)
Hong Kong Segment
|
Eleventh Weekly
Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-249/2006/B
|
Repositioning and Long Term
Operation Plan of Ocean
Park
|
Monthly Environmental Monitoring
and Audit Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3262012_content.html
|
|
|
|
EP-249/2006/A
|
Repositioning and Long Term
Operation Plan of Ocean
Park
|
Noise Review Study Report (Oct
2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html
|
|
|
|
- Kowloon City District
|
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise
Terminal at Kai Tak
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.3
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.4
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-401/2010
|
Installation of Submarine Gas
Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development
|
1st Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
|
- Kwun Tong District
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
- Sham Shui Po District
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Sep
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report (Aug
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
- Wong Tai Sin District
|
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.3
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.4
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
- Yau Tsim Mong District
|
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
|
EP-273/2007
|
Laying of Western
Cross Harbour
Main and Associated Land Mains from West Kowloon
to Sai Ying Pun
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-273/2007
|
Laying of Western
Cross Harbour
Main and Associated Land Mains from West Kowloon
to Sai Ying Pun
|
Quarterly EM&A Report (May to
Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T
in West Kowloon
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
EP-366/2009/A
|
Road Works at West
Kowloon
|
Monthly EM&A Report (Aug
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
|
EP-366/2009/A
|
Road Works at West
Kowloon
|
Monthly EM&A Report (Sep
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.3
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
EP-438/2012/A
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.4
|
http://www.epd.gov.hk/eia/english/register/index8/vep3702012_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|