Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the period between 16 Dec
2014 to 15 Jan
2014)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
Application
for EIA Study Brief
|
|
|
ESB-283/2014
|
Tung Chung New Town Extension
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb283/esb283.pdf
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
DIR-239/2014
|
Public Housing Development
at Lin Cheung Road Site - Temporary Sewage Pumping Station and Associated
Sewer Pipes
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir239/dir239.pdf
|
|
|
Application
for Approval of EIA Report
|
|
|
EIA-225/2014
|
Decommissioning of West
Portion of The Middle ASH Lagoon at Tsang Tsui, Tuen Mun
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2252014/HTML/Top%20Index.htm
|
|
|
Application
for Environmental Permit
|
|
|
Nil
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
VEP-454/2014
|
Improvement of Fresh Water Supply to Cheung Chau
|
Environmental Permit issued (EP-392/2010/A )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4542014.htm
|
|
|
VEP-455/2014
|
Yuen Long Kau Hui No. 2 Sewage Pumping Station
|
Environmental Permit issued (EP-325/2009/A )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4552014.htm
|
|
|
VEP-458/2014
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Environmental Permit issued (EP-404/2011/B)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4582014.htm
|
|
|
VEP-459/2014
|
Hong Kong - Zhuhai -
Macao Bridge Hong Kong Link Road
|
Environmental Permit issued (EP-352/2009/D)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4592014.htm
|
|
|
Application
for Further Environmental Permit
|
|
|
Nil
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition
Centre
|
Silt
Screen Deployment Plan
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
- Island District
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Feb
2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Oct 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Nov 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
12th Monthly EM&A Report (Nov 2014)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Eighth Monthly EM&A Report (Jun 2014)(HY/2012/07)(20141029)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Oct 2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1 Phase 1
Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1 Phase 2 -
Sok Kwu Wan Sewage
Collection, Treatment and Disposal Facilities
|
Monthly EM&A Report (Oct 2014)
(DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Oct
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Oct
2014)(HY/2011/09 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-353/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3432011_content.html
|
|
|
EP-353/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Nov
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3432011_content.html
|
|
|
EP-353/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Nov
2014)(HY/2011/09 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3432011_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Feb
2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Oct 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Oct
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Oct
2014)(HY/2013/01 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Nov 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Quarterly EM&A Report (Jul to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental Monitoring and Audit
Report (No. 111)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
110th Monthly EM&A Report (12 Oct 2014
to 11 Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping of
Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly Progress Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit
Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines
(GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit
Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
3rd Quarterly EM&A Report (HY/2012/08 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jul to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas Desulphurization
Plant Retrofit Project
|
Quarterly EM&A Report (Jul to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary
to Tung Chung Area 56 Public Housing Development
|
Monthly EM&A Report (Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Oct 2014) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Sep 2014) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Aug 2014) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
- North District
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in Northern New
Territories - Package C
|
Monthly EM&A Report(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Annual EM&A Review Report (Nov 2013 to
Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Quarterly EM&A Report (Aug 2014 to Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Final EM&A
Review Report (Nov 2009 to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
- Sai Kung
District
|
|
|
EP-448/2013
|
Natural Terrain Hazard Mitigation Works at
Study Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung
|
Monthly EM&A
Report (Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung
Kwan O Area 137
|
Monthly EM&A Report (Oct
2014)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong
Line Extension
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-410/2010/A
|
Phase III Redevelopment of The Hong
Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Quarterly EM&A Report (Aug to Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3962013_content.html
|
|
|
EP-435/2011
|
Sewerage Works at Pik
Shui Sun Tsuen
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html
|
|
|
EP-435/2011
|
Sewerage Works at Pik
Shui Sun Tsuen
|
Monthly EM&A Report (Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html
|
|
|
- Sha Tin
District
|
|
|
EP-135/2002/J
|
Sha Tin New Town - Stage II TrunkRoad T3 and Associated Roadworks
|
Monthly Environmental Monitoring and Audit Report
(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4282014_content.html
|
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
- Tai Po District
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Oct
2014) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Oct
2014) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Annual EM&A Review Report (Nov 2013 to
Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Quarterly EM&A Report (Aug 2014 to Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Final EM&A
Review Report (Nov 2009 to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
- Tsuen Wan District
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2007/23)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
- Tuen Mun District
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-331/2009
|
Widening of Tsing
Lun Road, Tuen Mun
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank
at Tuen Mun Area 38
|
Monthly EM&A Report (Oct 2014) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54
Sewage Pumping Station
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
3rd Quarterly EM&A Report (HY/2012/08 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-321/2008/B
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Quarterly EM&A Report (Aug to Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html
|
|
|
- Yuen Long District
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road
(Section 3)
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
EP-411/2011
|
Improvement to Pok
Oi Interchange
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
EP-490/2014
|
Drainage Works at Mai Po
|
Monthly EM&A Report(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4902014_content.html
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
- Kwai Tsing District
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin
and its Approach Channel
|
Monthly Environmental Monitoring &
Audit Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin
and its Approach Channel
|
Monthly Environmental Monitoring &
Audit Report (Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2007/23)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
- Central & Western District
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Oct
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2007/23)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-313/2008/I
|
West Island Line
|
Monthly EM&A Report(Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4302014_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Oct 2014)
(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Aug 2014 to Oct
2014) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
Monthly EM&A Report (No.36)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
12th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Nov
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/C
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Nov
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4432014_content.html
|
|
|
- Wan Chai District
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Oct
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2007/23)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-444/2012/A
|
MTR Wan Chai
Station Lee Tung Street Subway
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html
|
|
|
EP-444/2012/A
|
MTR Wan Chai
Station Lee Tung Street Subway
|
Monthly EM&A Report (Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Oct 2014)
(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Aug 2014 to Oct
2014) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Nov
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/C
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Nov
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4432014_content.html
|
|
|
- Eastern District
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Oct
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2007/23)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning
of Cape Collinson Crematorium
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Oct 2014)
(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Aug 2014 to Oct
2014) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/C
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Nov
2014)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4432014_content.html
|
|
|
- Southern District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2007/23)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-487/2014
|
Tai Shue Wan Development
at Ocean Park
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html
|
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
- Kowloon City District
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report No.22 (Jun
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report No.26 (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong
Line Extension
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts
(EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former
Kai Tak Airport
|
Monthly Environmental Monitoring &
Audit Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
- Kwun Tong
District
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Monthly EM&A Report (Oct
2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Monthly EM&A Report (Oct
2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard
Sites
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard
Sites
|
Quarterly EM&A Report (Jul to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts
(EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former
Kai Tak Airport
|
Monthly Environmental Monitoring &
Audit Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
- Sham Shui Po
District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2007/23)(Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul
to Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
- Wong Tai Sin District
|
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Oct 2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Oct
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS
Building, Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly Environmental Monitoring &
Audit Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
- Yau Tsim Mong District
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Monthly
EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Monthly
EM&A Report (Nov 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report No.22 (Jun
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report No.26 (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-438/2012/H
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong
Line Extension
|
Monthly EM&A Report (Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-317/2009
|
Tsim Sha Tsui Station Northern Subway
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
EP-317/2009/A
|
Tsim Sha Tsui Station Northern Subway
|
Monthly EM&A Report (Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4232014_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (Oct 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (Nov
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
|
|
|
|
|