Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
(for the period between 16 Dec 2015 to 15 Jan 2016)
|
|
Application No. / Permit No.
|
Project Title
|
Document Name
|
Hyperlink
|
|
Application for EIA Study Brief
|
|
ESB-291/2015
|
Hung
Shui Kiu New
Development Area
|
EIA
Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-291.pdf
|
|
Application for Permission to Apply Directly
for Environmental Permit
|
|
DIR-243/2015
|
Tseung Kwan O Express -
Cable System
|
Project
Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir243/dir243.pdf
|
|
Application for Approval of EIA Report
|
|
N/A
|
|
Application for Environmental Permit
|
|
AEP-504/2015
|
Chai Wan Government Complex and
Vehicle Depot
|
Environmental
Permit issued (EP-504/2015)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5042015.htm
|
|
AEP-505/2015
|
Chai Wan Government Complex
and Vehicle Depot
|
Environmental
Permit issued (EP-505/2015)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5052015.htm
|
|
Application for Variation of an
Environmental Permit
|
|
VEP-487/2015
|
Organic
Waste Treatment Facilities, Phase I
|
Environmental
Permit issued ( FEP-01/395/2010/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4872015.htm
|
|
VEP-488/2015
|
Organic
Waste Treatment Facilities, Phase I
|
Environmental
Permit issued ( EP-395/2010/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4882015.htm
|
|
VEP-489/2015
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Environmental
Permit issued (EP-458/2013/B)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4892015.htm
|
|
Application for Further Environmental
Permit
|
|
FEP-165/2015
|
Cyberport Development -
Northern Access Road
|
Environmental
Permit issued ( FEP-02/065/2000/A )
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1652015.htm
|
|
Submission as required by Environmental
Permit Condition - Design / Environmental Submissions
|
|
EP-427/2011/A
|
Dredging, Management and Capping of Contaminated Sediment Disposal
Facility to the South of The Brothers
|
Monthly Progress Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
EP-427/2011/A
|
Dredging, Management and Capping of Contaminated Sediment Disposal
Facility to the South of The Brothers
|
Monthly Progress Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine Cable Circuit Connecting
Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
Baseline Water Quality Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Hong Kong Convention and
Exhibition Centre
|
Silt Screen Deployment Plan(HK/2009/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
Submission as required by Environmental
Permit Condition - EM&A Reports
|
|
|
Island
District
|
Central
& Western District
|
|
|
|
North
District
|
Wan
Chai District
|
|
|
|
Sai
Kung District
|
Eastern
District
|
|
|
|
Sha
Tin District
|
Southern
District
|
|
|
|
Tai
Po District
|
Kowloon
City District
|
|
|
|
Tsuen
Wan District
|
Kwun
Tong District
|
|
|
|
Tuen
Mun District
|
Sham
Shui Po District
|
|
|
|
Yuen
Long District
|
Wong
Tai Sin District
|
|
|
|
Kwai
Tsing District
|
Yau
Tsim Mong District
|
|
|
- Island District
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly
Environmental Monitoring and Audit Report (Mar 2015 to May
2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly
Environmental Monitoring and Audit Report (Nov 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Oct
2015)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Quarterly Environmental Monitoring and Audit Report (Aug 2015 to
Oct 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Dec
2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7) into a
Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Oct
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung Chau
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
FEP-01/395/2010/B
|
Organic Waste Treatment Facilities, Phase I
|
Fifth
Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1602015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong
Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Oct
2015)(HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Oct
2015)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong
Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Oct
2015)(HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Oct
2015)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong
Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Oct
2015)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and Audit Report (Jul 2015 to
Sep 2015)(HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Dec
2015)(HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Link Road
|
Monthly Environmental Monitoring and Audit Report (Oct
2015)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Link Road
|
Monthly EM&A Report(Oct 2015) (HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Link Road
|
Quarterly Environmental Monitoring and Audit Report (Jun 2015 to
Aug 2015)(HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Link Road
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Link Road
|
Monthly EM&A Report(Nov 2015) (HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
EP-392/2010/A
|
Improvement of Fresh Water Supply to Cheung Chau
|
Quarterly EM&A Report (Jul 2015 to Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4542014_content.html
|
|
EP-392/2010/A
|
Improvement of Fresh Water Supply to Cheung Chau
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4542014_content.html
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring & Audit Report (Aug 2015) (DP
04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring & Audit Report (Sep 2015) (DP
04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary to Tung Chung Area 56
Public Housing Development
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary to Tung Chung Area 56 Public
Housing Development
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall
|
Quarterly EM&A Summary Report (Feb 2015 to Apr 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
122nd Monthly EM&A Report (12 Oct 2015 to 11 Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part & remaining part)
|
Monthly Environmental Monitoring and Audit Report (No. 123)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
FEP-01/395/2010/B
|
Organic Waste Treatment Facilities, Phase I
|
Sixth Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1602015_content.html
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma
Extension
|
Monthly Environmental Monitoring and Audit Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
- North District
|
|
EP-404/2011/C
|
Liantang / Heung Yuen Wai Boundary Control Point
and Associated Works
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Jun 2015)(chi)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Jul 2015)(chi)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Aug 2015)(chi)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Oct 2015) (DC/2011/06)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Aug 2015 to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui
Sewage Treatment Works - Further Expansion at Fanling
North New Development Area
|
Monthly EM&A Report(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
- Sai Kung District
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly
EM&A Report (Oct 2015)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
EP-448/2013
|
Natural Terrain Hazard Mitigation Works at Study Area No.
12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
EP-435/2011/A
|
Sewerage Works at Pik Shui
Sun Tsuen
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4482014_content.html
|
|
EP-410/2010
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups
Jockey Club Sai Kung Outdoor Training Camp
|
Quarterly EM&A Report (Aug 2015 to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4102010_content.html
|
|
EP-438/2012/I
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4842015_content.html
|
|
EP-438/2012/I
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4842015_content.html
|
|
- Sha Tin District
|
|
EP-135/2002/J
|
Sha Tin New Town - Stage II TrunkRoad T3 and
Associated Roadworks
|
Monthly Environmental Monitoring and Audit Report (Oct
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4282014_content.html
|
|
EP-438/2012/I
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4842015_content.html
|
|
EP-438/2012/I
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4842015_content.html
|
|
- Tai Po
District
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai
Po
|
Monthly EM&A Report (Oct 2015) (DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai
Po
|
Monthly EM&A Report (Nov 2015) (DC/2009/22)(DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Aug 2015 to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui
Sewage Treatment Works - Further Expansion at Fanling
North New Development Area
|
Monthly EM&A Report(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly Post-Construction Ecological Monitoring Report (No.13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly Post-Construction Ecological Monitoring Report (No.14)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly Post-Construction Ecological Monitoring Report (No.15)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly Post-Construction Ecological Monitoring Report (No.16)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly Post-Construction Ecological Monitoring Report (No.17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly Post-Construction Ecological Monitoring Report (No.18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly Post-Construction Ecological Monitoring Report (No.19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly Post-Construction Ecological Monitoring Report (No.20)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Post-Construction Ecological Monitoring Annual Report 2014
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
- Tsuen Wan District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (DC/2007/23)(Jun to Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul 2015 to Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May to Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17,
DC/2009/18)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report (DC/2009/23)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
- Tuen Mun District
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Quarterly Environmental Monitoring and Audit Report (Mar 2015 to
May 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Oct
2015)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Quarterly Environmental Monitoring and Audit Report (Aug 2015 to
Oct 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Dec
2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2015)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-331/2009
|
Widening of Tsing Lun
Road, Tuen Mun
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
EP-331/2009
|
Widening of Tsing Lun
Road, Tuen Mun
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Quarterly EM&A Report (Aug 2015 to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen
Mun Area 38
|
Monthly EM&A Report (Oct 2015) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
EP-321/2008/B
|
Upgrading of Pillar Point Sewage Treatment Works
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html
|
|
- Yuen
Long District
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Quarterly EM&A Report (Aug 2015 to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
EP-490/2014
|
Drainage Works at Mai Po
|
Monthly EM&A Report(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4902014_content.html
|
|
EP-490/2014
|
Drainage Works at Mai Po
|
Monthly EM&A Report(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4902014_content.html
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
- Kwai Tsing District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (DC/2007/23)(Jun to Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul 2015 to Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May to Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17,
DC/2009/18)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report (DC/2009/23)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai
Tsing Container Basin and its Approach Channel
|
Monthly Environmental Monitoring & Audit Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai
Tsing Container Basin and its Approach Channel
|
Monthly Environmental Monitoring & Audit Report (Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
- Central
& Western District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (DC/2007/23)(Jun to Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Jul 2015 to Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(May to Jul 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17,
DC/2009/18)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report (DC/2009/23)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-313/2008/J
|
West Island Line
|
Monthly EM&A Report(Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
EP-122/2002/D
|
Central
Reclamation Phase III
|
Monthly
EM&A Report (Oct 2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Aug 2015 to Oct 2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Nov 2015) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Oct 2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Aug to Oct 2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Nov 2015)(HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
EP-364/2009/D
|
Central-Wanchai Bypass (CWB) including
its road tunnel and slip roads
|
Monthly EM&A Report (Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html
|
|
|
|
|
|
|
|
|
|