Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
|
(for the period between 16
December 2020 to 15 January 2021)
|
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
|
ESB-336/2020
|
Upgrading of Nim Wan
Road (North)
|
Study Briefs
|
https://www.epd.gov.hk/eia/register/study/latest/esb-336.pdf
|
|
|
|
|
|
ESB-337/2020
|
Road P1 (Tai Ho - Sunny Bay Section), Lantau
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/esb337/esb337.pdf
|
|
|
|
|
|
ESB-338/2021
|
Improvement to So Kwun Po Interchange
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/esb338/esb338.pdf
|
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
|
DIR-280/2020
|
Sewage Pumping Stations at
North East New Territories
|
Decisions of the DEP
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2802020.pdf
|
|
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
|
EIA-264/2020
|
Pier
Improvement at Lai Chi Wo
|
Approval
Conditions
|
https://www.epd.gov.hk/eia/register/report/conditions/aeiar2642020.pdf
|
|
|
|
|
|
EIA-265/2020
|
Pier
Improvement at Tung Ping Chau
|
Approval
Conditions
|
https://www.epd.gov.hk/eia/register/report/conditions/aeiar2652020.pdf
|
|
|
|
|
|
EIA-266/2020
|
A
Rooftop Helipad at New Acute Hospital at Kai Tak Development
Area
|
Approval
Conditions
|
https://www.epd.gov.hk/eia/register/report/conditions/aeiar2662020.pdf
|
|
|
|
|
|
EIA-267/2020
|
Revised
Austin Road Flyover
|
EIA Reports
|
https://www.epd.gov.hk/eia/register/report/eiareport/eia_2672020/Index.htm
|
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
|
AEP-579/2020
|
A Rooftop Helipad at New Acute Hospital at Kai Tak Development Area
|
Environmental
Permit issued (EP-579/2020)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5792020.htm
|
|
|
|
|
|
AEP-583/2020
|
Drainage Improvement Works at Nam Wa Po
|
Environmental
Permit issued (EP-583/2020)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5832020.htm
|
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
|
VEP-585/2020
|
New Wang Tong River Bridge
|
Environmental
Permit issued (EP-555/2018/A)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5852020.htm
|
|
|
|
|
|
VEP-586/2020
|
Hong Kong Offshore LNG Terminal - Works
associated with the subsea gas pipeline for Lamma
Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Environmental
Permit issued (FEP-02/558/2018/A)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5862020.htm
|
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
|
Nil
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage Treatment Works
|
Proposed
Fine Adjustment for Kowloon City Baptist Church Hay Nien
Primary School
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage Treatment Works
|
Supplementary
Contamina Assessment Plan for the existing DSD
staff quarter (revision 2.1)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
EP-456/2013/A
|
Drainage Improvement
Works at Ngong Ping
|
Floral Transplantation
Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer
Terminal – Bonded Vehicular Bridge and Associated Roads
|
Silt Curtain and
Cofferdam Deployment Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer
Terminal – Bonded Vehicular Bridge and Associated Roads
|
Landscape and Visual
Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
EP-313/2008/J
|
West Island Line
|
Method Statement for the
removal for 714 site office area
|
https://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
|
|
|
|
EP-313/2008/J
|
West Island Line
|
Sampling and Testing
Report in Works Area B
|
https://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
|
|
|
|
EP-313/2008/J
|
West Island Line
|
Sampling and Testing
proposal for the general fill in Works Area B
|
https://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
|
|
|
|
EP-555/2018/A
|
New Wang Tong River
Bridge
|
Breeding Bird Survey
Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html
|
|
|
|
|
|
EP-456/2013/A
|
Drainage Improvement
Works at Ngong Ping
|
Aquatic Fauna
Translocation Plan(Rev.H)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Silt Curtain Deployment Plan(Rev7)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter
section) Contract No. HY/2009/15 - Marine Works
|
Silt curtain deployment
plan(Rev8)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-02/558/2018
|
Hong Kong Offshore LNG
Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas
Receiving Station (GRS) in LPS
|
Silt Curtain Deployment
Plan
|
https://www.epd.gov.hk/eia/english/register/index7/fep1952019_content.html
|
|
|
|
|
|
EP-560/2018
|
Intermodal Transfer
Terminal – Bonded Vehicular Bridge and Associated Roads
|
Construction Works
Schedule and Location Plans
|
https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Submission Additional Mitigation
Plan for Slip Road 8 (Revision 7)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Ecological Monitoring Report for the Woodland
Compensation Area (Sep to Nov 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
FEP-01/381/2009
|
Tuen Mun Area 54 Sewage
Pumping Station
|
Operation Phase Final Odour Impact Monitoring Report
|
https://www.epd.gov.hk/eia/english/register/index7/fep1812018_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Schedule
of Submissions for Environmental Permit
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass Eastern Section
|
Submission of Layout
Plans
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
|
- Island District
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly EM&A
Report(Nov 2020) (HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Final Environmental Monitoring and Audit Report(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Nov 2020) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
|
FEP-01/558/2018
/ FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A) Report(Nov
2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1942019_content.html
|
|
|
|
|
|
FEP-02/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power Station
(LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A) Report(Nov
2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1952019_content.html
|
|
|
|
|
|
FEP-03/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A) Report(Nov
2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1962019_content.html
|
|
|
|
|
|
EP-071/2000/D
|
1,800 MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit Report Unit L11& L12
(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
EP-071/2000/D
|
1,800 MW Gas-Fired Power Station at Lamma Extension
|
Environmental Monitoring and Audit Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html
|
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's
Bay (part & remaining part)
|
Monthly Environmental Monitoring and Audit Report (No. 184)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Nov 2020) (HY/2011/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.29(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
FEP-02/131/2002
|
Low-level Radioactive
Waste Storage Facility
|
5th EM&A Report(Operation Phase)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1632015_content.html
|
|
|
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jul 2020 to Sep 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jul 2020 to Sep 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7)
into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2020)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Final Environmental Monitoring and Audit Report(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2020)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit Report (Nov
2020)(HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-489/2014
|
Expansion of
Hong Kong International Airport into a Three-Runway System
|
Construction Phase Monthly EM&A Report No.59
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai Chi Yuen Cemetery Extension
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
|
|
EP-535/2017
|
Improvement
Dredging for Lamma Power Station Navigation
Channel
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html
|
|
|
|
|
|
EP-535/2017
|
Improvement
Dredging for Lamma Power Station Navigation
Channel
|
Quality EM&A Report (Aug 2020 to Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html
|
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park
at Penny's Bay, Lantau
|
183th Monthly EM&A Report (12 Nov 2020 to 11 Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Sixty-sixth Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
22nd Quarterly EM&A Summary Report (Sep 2020 to Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
EP-312/2008/A
|
Disposal
of Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha Chau
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town Extension
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
EP-519/2016
|
Tung Chung New Town Extension
|
Monthly EM&A Report(Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
|
- North District
|
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
|
EP-534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge
Cemetery
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
FEP-01/460/2013
|
Development of
Organic Waste Treatment Facilities, Phase 2
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1912019_content.html
|
|
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monitoring Report for Wetland Compensation Area(No.2)
(Nov 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control
Point and Associated Works
|
Monitoring Report for Wetland Compensation Area(No.1)
(Oct 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Quarterly EM&A Report (Aug 2020 to Oct 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monthly EM&A Report (Nov 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Aug 2020 - Oct 2020)
(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Annual EM&A Report (Nov 2019 - Oct 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Nov 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment
Works
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
EP-517/2017/A
|
Expansion of Sha Tau Kok Sewage Treatment Works
|
Monthly EM&A
Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
EP-517/2017/A
|
Expansion of Sha Tau Kok Sewage Treatment Works
|
Quarterly EM&A
Report(Sep 2020 to Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Monthly EM&A Report
(Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Quarterly EM&A
Report (Oct 2020 to Dec 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road Diversion
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New
Development Area Road P1 and P2 and Associated New Kwu
Tung Interchange and Pak Shek Au Interchange
Improvement
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly
EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Quarterly EM&A Report No.3(Sep 2020 to Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly EM&A Report (Nov 2020) (V.1)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
|
EP-503/2015/A
|
Desalination
Plant at Tseung Kwan O
|
28th
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Nov 2020)(Version 2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Quarterly EM&A Report (Jul 2020 to Sep 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.19 (Jul 2020)(v1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.20 (Aug 2020)(v1)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.23 (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
EP-134/2002/N
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly Environmental Monitoring and Audit Report (Nov
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report
(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of Sha
Tin Water Treatment Works - South
Works
|
Monthly
EM&A Report No.57
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
EP-463/2013/B
|
Widening and
Reconstruction of Tai Po Road (Sha Tin Section)
|
Monthly
EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
EP-463/2013/B
|
Widening and
Reconstruction of Tai Po Road (Sha Tin Section)
|
Quarterly
EM&A Report (Dec 2019 to Feb 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
|
|
EP-345/2009
|
Inter-reservoirs Transfer Scheme (IRTS) - Water
Tunnel between Kowloon Byewash Reservoir and
Lower Shing Mun
Reservoir
|
17th
Monthly EM&A Report(Rev.1)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3452009_content.html
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage
Treatment Works
|
Monthly
EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage
Treatment Works
|
Quaterly Environmental Monitoring and Audit Summary Report (Sep
2020 - Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage
Treatment Works
|
Update EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
|
|
- Tai Po District
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Aug 2020 - Oct 2020)
(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Annual EM&A Report (Nov 2019 - Oct 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Nov 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
|
EP-388/2010
|
Development
of a Bathing Beach at Lung Mei, Tai Po
|
Monthly
EM&A Report(Sep 2020) (CV/2012/05)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment
Works
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
|
|
EP-468/2013/A
|
Kwu Tung North New Development Area Road D1 to D5
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html
|
|
|
|
|
|
EP-466/2013
|
NENT - Castle Peak Road Diversion
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html
|
|
|
|
|
|
EP-467/2013/A
|
Kwu Tung North New
Development Area Road P1 and P2 and Associated New Kwu
Tung Interchange and Pak Shek Au Interchange
Improvement
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html
|
|
|
|
|
|
EP-469/2013
|
NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
- Tsuen Wan District
|
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Monthly Environmental Monitoring And Audit
Report (Nov 2020)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov 2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-489/2014
|
Expansion of
Hong Kong International Airport into a Three-Runway System
|
Construction
Phase Monthly EM&A Report No.59
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Sixty-sixth Monthly EM&A Report(Nov
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
22nd Quarterly
EM&A Summary Report (Sep 2020 to Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Nov 2020)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Nov 2020)(HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Final Environmental Monitoring and
Audit Report(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring
and Audit Report (Nov 2020)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.29(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
|
|
EP-507/2016/C
|
Installation
of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black
Point Power Station
|
Monthly
EM&A Report no.48
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
|
|
FEP-03/507/2016/C
|
Additional
Gas-fired Generation units Project - Installation of one additional
gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power
Station
|
Monthly
EM&A Report no.48
|
https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html
|
|
|
|
|
|
FEP-01/558/2018
/ FEP-01/558/2018/A
|
Hong Kong Offshore LNG Terminal - Works associated
with the double berth jetty at LNG Terminal
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1942019_content.html
|
|
|
|
|
|
FEP-02/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Lamma Power
Station (LPS) and the associated Gas Receiving Station (GRS) in LPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1952019_content.html
|
|
|
|
|
|
FEP-03/558/2018
|
Hong Kong Offshore LNG Terminal - Works associated
with the subsea gas pipeline for Black Point Power Station (BPPS) and the
associated Gas Receiving Station (GRS) in BPPS
|
Monthly Environmental Monitoring and Audit (EM&A)
Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1962019_content.html
|
|
|
|
|
|
EP-534/2017
|
Site Formati3on and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works for Development
of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation and
Water Management Facilities at the Castle Peak Power Station (CPPS)
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
|
|
EP-210/2005/D
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html
|
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.59
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov 2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
- Central & Western District
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Nov 2020) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including
its road tunnel and slip roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Nov 2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Oct
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Nov 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass - Tunnel
(Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Nov 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Nov 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-408/2011/C
|
Central Police Station
Conservation and Revitalisation Project
|
Monthly EM&A Report
(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4992016_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Nov 2020) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central
- Wan Chai Bypass - Central Interchange (Contract
No. HY/2009/18)
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5742020_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Nov 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Nov 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Nov 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling Bypass
Eastern Section
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
- Eastern District
|
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Nov 2020) (HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
|
EP-364/2009/H
|
Central-Wanchai Bypass (CWB) including
its road tunnel and slip roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5722020_content.html
|
|
|
|
|
|
FEP-01/364/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
|
FEP-06/364/2009/A
|
Central
- Wan Chai Bypass - Central Interchange (Contract
No. HY/2009/18)
|
Monthly EM&A Report (Nov 2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
|
FEP-07/364/2009/H
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
FEP-10/364/2009/B
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Nov 2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
|
FEP-11/364/2009/E
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Nov 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass - Tunnel
(Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Nov 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Nov 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly
EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Nov 2020)(Version
2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Nov
2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
|
EP-473/2013/A
|
Fanling
Bypass Eastern Section
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html
|
|
|
|
|
|
- Southern District
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas Desulphurization
Plant Retrofit Project
|
Quarterly EM&A
Report (Jul 2020 to Sep 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
|
|
EP-537/2017
|
Proposed Extension of Academic Block, The Swire Institute
of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Monthly EM&A Report No.38
|
http://www.epd.gov.hk/eia/8english/register/aep/ep5372017_content.html
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at
Ocean Park
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan Development at
Ocean Park
|
Quarterly EM&A Report (Sep 2020 to Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin
Tunnel and Associated Works
|
Monthly
EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov 2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Oct
2020)(ED/2018/04)(Version 1.2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Nov 2020) (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Nov 2020)(KL/2014/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
|
EP-563/2018
|
The Development of AFCD Animal Management and Animal
Welfare Building Complex in Kai Tak Development
|
Monthly EM&A Report(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Nov 2020)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Nov 2020)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Nov 2020)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West (HY/2014/07)
|
Monthly EM&A Report (Nov 2020)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Nov 2020)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report
(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A
Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04
- Cha Kwo Ling
|
Monthly EM&A Report (Nov2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Nov 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Nov 2020)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Nov 2020)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Nov 2020)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A
Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West
(HY/2014/07)
|
Monthly
EM&A Report (Nov 2020)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Nov 2020)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
- Sham Shui Po
District
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2020)(DE/2018/17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov 2020)(DC/2009/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov 2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Nov 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A
Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report
(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
- Yau
Tsim Mong District
|
|
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving the West
Kowloon Cultural District
|
Quarterly EM&A Report (Aug 2020 to Oct 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving the West
Kowloon Cultural District
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon Reclamation
Development Phase 1
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Nov 2020)(HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201420.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Nov 2020)(HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201802.html
|
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Nov 2020)(HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016hy201808.html
|
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak West (HY/2014/07)
|
Monthly EM&A Report (Nov 2020)(HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018hy201407.html
|
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Nov 2020)(HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018hy201408.html
|
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report
(Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (Nov 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|