Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the period between 16 Jun 2014 to 15 Jul 2014)
|
|
|
Application No. / Permit
No.
|
Project Title
|
Document Name
|
Hyperlink
|
|
|
Application for EIA Study
Brief
|
|
|
ESB-275/2014
|
Kau
Sai Chau Golf Academy
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb275/esb275.pdf
|
|
|
ESB-273/2014
|
Sha Tin Cavern Sewage Treatment Works
|
Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-273.pdf
|
|
|
Application for Permission
to Apply Directly for Environmental Permit
|
|
|
DIR-238/2014
|
Construction
of a Landing and Access Facility at Fung Wong Wat Beacon, Tolo Channel, Tai
Po
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir238/dir238.pdf
|
|
|
Application for Approval
of EIA Report
|
|
|
EIA-223/2014
|
Expansion
of Hong Kong International Airport
into a Three-Runway System
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2232014/html/index.htm
|
|
|
Application for
Environmental Permit
|
|
|
NIL
|
|
|
Application for Variation
of an Environmental Permit
|
|
|
VEP-441/2014
|
MTR Wan Chai Station Lee Tung
Street Subway
|
Environmental Permit issued
(EP-444/2012/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4412014.htm
|
|
|
VEP-442/2014
|
Connection of Existing 400kV
Transmission Circuit to Lai Chi Kok 400kV
Substation
|
Environmental Permit issued
(EP-387/2010/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4422014.htm
|
|
|
VEP-443/2014
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Environmental Permit issued
(EP-364/2009/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4432014.htm
|
|
|
VEP-438/2014
|
Repositioning and Long Term
Operation Plan of Ocean
Park
|
Environmental Permit issued
(EP-249/2006/D)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4382014.htm
|
|
|
VEP-439/2014
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Environmental Permit issued
(EP-349/2009/L)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4392014.htm
|
|
|
VEP-440/2014
|
Central Kowloon Route
|
Environmental Permit issued
(EP-457/2013/A)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4402014.htm
|
|
|
Application for Further
Environmental Permit
|
|
|
Nil
|
|
|
Submission as required by
Environmental Permit Condition - Design / Environmental Submissions
|
|
|
EP-427/2011/A
|
Dredging, Management and
Capping of Contaminated Sediment Disposal Facility to the South of The
Brothers
|
Monthly Progress Report
(Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping of
Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly Progress Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping of
Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly Progress Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap
Kok Link
|
Second Quarterly
Post-Translocation Coral Monitoring Report (HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap
Kok Link
|
Second Quarterly
Post-Translocation Coral Monitoring Report (Apr 2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly Environmental
Monitoring and Audit Summary Report (Feb 2014 to Apr 2014) (CE 20/2009
(EP))
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Proposal for Termination
of TSP Monitoring at CD6a Harbourfront Horizon
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-407/2010/D
|
South
Island Line (East)
|
Ecological Planting &
Landscape Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-313/2008/I
|
West Island
Line
|
Noise Performance Test Proposal
|
http://www.epd.gov.hk/eia/english/register/index8/vep4302014_content.html
|
|
|
Submission as required by
Environmental Permit Condition - EM&A Reports
|
|
|
|
Island
District
|
Central
& Western District
|
|
|
|
|
North
District
|
Wan Chai
District
|
|
|
|
|
Sai Kung
District
|
Eastern
District
|
|
|
|
|
Sha Tin
District
|
Southern
District
|
|
|
|
|
Tai Po District
|
Kowloon
City District
|
|
|
|
|
Tsuen Wan
District
|
Kwun
Tong District
|
|
|
|
|
Tuen Mun
District
|
Sham Shui
Po District
|
|
|
|
|
Yuen Long
District
|
Wong Tai
Sin District
|
|
|
|
|
Kwai Tsing
District
|
Yau Tsim
Mong District
|
|
|
|
-
Island District
|
|
|
EP-352/2009
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Quarterly EM&A Report (Sep
to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3522009_content.html
|
|
|
EP-229/2005
|
Development of SkyCity
Golf Course
|
Quarterly EM&A Report
(Feb 2014 to Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2292005_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly EM&A Report (Apr 2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap
Kok Link
|
Quarterly EM&A Report (Nov
2013 to Feb 2014)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap
Kok Link
|
Quarterly EM&A Report (Nov
2013 to Feb 2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap
Kok Link
|
Monthly EM&A Report (May
2014)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental
Monitoring and Audit Report (No. 104)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental
Monitoring and Audit Report (No. 105)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
103rd Monthly EM&A Report
(12 Mar 2014 to 11 Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
104th Monthly EM&A Report
(12 Apr 2014 to 11 May 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan
Sewerage, Sewage Treatment Works and Outfall
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan
Sewerage, Sewage Treatment Works and Outfall
|
Monthly EM&A Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-392/2010
|
Improvement of Fresh Water
Supply to Cheung Chau
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas
Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental
Monitoring And Audit Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station
at Lamma Extension
|
Monthly Environmental
Monitoring and Audit Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Jun
to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Quarterly EM&A Report (Sep
to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Mar
2014)(HY/2010/02 ) (Rev.1)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Apr
2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Apr
2014)(HY/2011/09 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Apr
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal
Facilities
|
Monthly EM&A Report (Apr
2014) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
-
North District
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Monthly EM&A Report (Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Monthly EM&A Report (Jan
2014) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Monthly EM&A Report (Feb
2014) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Quarterly EM&A Report (Nov
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Final EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Quarterly EM&A Report (Feb
2014 to Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
The Fifth Monthly EM&A Report (Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Monthly EM&A Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Quarterly EM&A Report (Feb 2014 to Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Monthly EM&A Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Work
|
Monthly EM&A
Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
-
Sai Kung District
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Quarterly
EM&A Report (Jan to Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly
EM&A Report (Apr 2014) (CV/2013/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly
EM&A Report (Apr 2014) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-410/2010/A
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp
|
Monthly
EM&A Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3962013_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
-
Sha Tin District
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
-
Tai Po District
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Mar 2014) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Mar 2014) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Quarterly Environmental and
Audit Report (Jan to Mar 2014) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Quarterly Environmental and
Audit Report (Jan to Mar 2014) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Apr 2014) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Apr 2014) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Monthly EM&A Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Quarterly EM&A Report (Feb 2014 to Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling
Highway between Island
House Interchange and Fanling
|
Monthly EM&A Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in
Upper Tai Po River
|
Quarterly EM&A
Report (Jan 2014 to Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
- Tsuen Wan District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
- Tuen Mun
District
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Quarterly EM&A Report (Feb 2014
to Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point
Sewage Treatment Works
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill
Bank at Tuen Mun Area
38
|
Quarterly EM&A Report (Jan
2014 to Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill
Bank at Tuen Mun Area
38
|
Monthly EM&A Report (Apr
2014) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road Town Centre
Section
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun
Road, Tuen Mun
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
-
Yuen Long District
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary
Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road
(Section 3)
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi Interchange
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
-
Kwai Tsing District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
-
Central & Western District
|
|
|
EP-313/2008/H
|
West Island Line
|
Monthly EM&A Report (No.56)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4222013_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Apr
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Feb
2014 to Apr 2014) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (May 2014)
No.34
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
-
Wan Chai District
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Apr
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Feb
2014 to Apr 2014) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (May
2014) No.34
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
-
Eastern District
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former
Kai Tak Airport
Development
|
23rd Monthly EM&A Report (May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Apr
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Feb
2014 to Apr 2014) (HK/2011/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning
of Cape Collinson
Crematorium
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
-
Southern District
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (May
2014) No.34
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
-
Kowloon City District
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former
Kai Tak Airport
Development
|
23rd Monthly EM&A Report (May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report No.20
(Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
-
Kwun Tong District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving
Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Quarterly EM&A Report (Jan
2014 to Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Quarterly EM&A Report (Oct
to Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility
Study for Development at Anderson
Road
|
Monthly EM&A Report (Mar
2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Apr
2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
-
Sham Shui Po District
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Apr
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Jan
to Mar 2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Dec
2013 to Feb 2014) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
-
Wong Tai Sin District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Mar
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
-
Yau Tsim Mong
District
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-317/2009
|
Tsim Sha Tsui
Station Northern Subway
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
EP-440/2012
|
MTR Tsim
Sha Tsui Station Carnarvon Subway and Entrances Modification Works
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report No.20
(Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
|
|
|
|
|