|
| |
|
|
|
Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
|
(for the period between 16 Jun 2017 to 15 Jul 2017)
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
Nil
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
DIR-254/2017
|
Pacific
Light Cable Network (PLCN)– Deep Water Bay
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2542017.pdf
|
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
EIA-251/2017
|
Improvement Dredging for Lamma Power Station Navigation Channel
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2512017/html/index.htm
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
AEP-537/2017
|
Proposed
Extension of Academic Block, The Swire Institute of Marine Science, Faculty
of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Environmental Permit issued (EP-537/2017)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5372017.htm
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
Nil
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
Nil
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
FEP-05/039/2000/F
|
East Rail
Extensions - Tai Wai to
Ma On Shan
|
Monthly
Noise Monitoring Report No.5(Jun 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1322012_content.html
|
|
|
|
|
EP-489/2014
|
Expansion
of Hong Kong International Airport into a Three-Runway System
|
Construction Phase Monthly
EM&A Report No.17
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
EP-489/2014
|
Expansion
of Hong Kong International Airport into a Three-Runway System
|
Construction Works Schedule and
Location Plans
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
As-built drawing(s) for the
Operation Groud-Borne Noise Mitigation Measure
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
Operation Ground-borne Noise
Performance Test Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
Fixed Plant Noise Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
Tunnel Water-tight Liner Audit
Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
Landscape Visual Plan - Wvlie Road Ancillary Building
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
Proposal for Alternative
Operational Groud-Borne Noise Monitoring Location
GN1a
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
Proposal for Termination of
Construction Noise Monitoring Location CN1,CN2
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
Proposal for Termination of
Construction Dust Monitoring Location CD1a and Construction Noise
Monitoring Location CN3a
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
Proposal for Termination of
Construction Dust Monitoring Location CD2a, CD3a and Construction Noise
Monitoring Location CN4a, CN6
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line
Extension
|
Proposal for Termination of
Construction Dust Monitoring Location CD5 and Construction Noise Monitoring
Location CN9 - CN12
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-454/2013
|
Reprovisioning of FEHD Sai
Yee Street Vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area
|
Submission of Environmental Impact Monitoring Report(May
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
- Island District
|
|
|
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and Audit
Report (Sep 2016 to Nov 2016)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Second Annual Environmental Monitoring
& Audit (EM&A) Report (HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Third Annual Environmental Monitoring &
Audit (EM&A) Report (Nov 2015 to Oct 2016)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2016 to Nov 2016)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Feb 2017 to Apr 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(May 2017)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2014/05)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2016 to Nov 2016)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report(May 2017)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report(May 2017)
(HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Twenty-Founrth Monthly
EM&A Summary Report(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Eighth Quarterly EM&A Summary Report(Mar
2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly Environmental Monitoring and Audit Report Unit
L10 (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7)
into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport into a
Three-Runway System
|
Quarterly EM&A Report No.5 (Jan to Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part &
remaining part)
|
Monthly Environmental Monitoring and Audit Report (No. 142)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
141st Monthly EM&A Report (12 May 2017 to 11 Jun 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging, Management
and Capping of sediment Disposal Facility at Sha Chau
|
Monthly Progress Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping of Contaminated Sediment
Disposal Facility to the South of The Brothers
|
Monthly Progress Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary to Tung Chung
Area 56 Public Housing Development
|
Monthly EM&A Report (Feb 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
|
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary to Tung Chung
Area 56 Public Housing Development
|
Monthly EM&A Report (Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Quarterly EM&A Report no.2
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.6
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jan to Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant
Retrofit Project
|
Quarterly EM&A Report (Jan to Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
|
- North District
|
|
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further
Expansion at Fanling North New Development Area
|
Monthly EM&A Report(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening of ToloHighway/FanlingHighway between Island
House Interchange and Fanling
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha
Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to
Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang /
Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang /
Heung Yuen Wai Boundary
Control Point and Associated Works
|
Quarterly EM&A Report (Nov 2016 to Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-324/2008/C
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Mar 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4702015_content.html
|
|
|
|
|
EP-324/2008/C
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Jun 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4702015_content.html
|
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental Monitoring and Audit Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Mar 2017)(version
3.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Quarterly EM&A Report (Feb 2017 to Apr
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (May 2017)(version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Quarterly EM&A Report (Feb 2017 to Apr
2017)(version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-435/2011/A
|
Sewerage Works at Pik Shui
Sun Tsuen
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4482014_content.html
|
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
EP-319/2009/A
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly Environmental Monitoring & Audit Report (Dec
2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly EM&A Report (May 2017)(CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly EM&A Report (May 2017)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works
|
Monthly EM&A Report No.15
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Tai Po District
|
|
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further
Expansion at Fanling North New Development Area
|
Monthly EM&A Report(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening of ToloHighway/FanlingHighway between Island
House Interchange and Fanling
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/C
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Mar 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4702015_content.html
|
|
|
|
|
EP-324/2008/C
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Jun 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4702015_content.html
|
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental Monitoring and Audit Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
|
- Tsuen Wan
District
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Twenty-Founrth Monthly
EM&A Summary Report(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Eighth Quarterly EM&A Summary Report(Mar
2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Dec 2016 to Feb
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/10,DC/2009/17,DC/2009/18)(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Mar
2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Feb
2017 to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport into a
Three-Runway System
|
Quarterly EM&A Report No.5 (Jan to Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
FEP-01/497/2015
|
Decommissioning of West Portion of the Middle Ash Lagoon
at Tsang Tsui, Tuen Mun
|
Monthly EM&A Report(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1692016_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and Audit
Report (Sep 2016 to Nov 2016)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Second Annual Environmental Monitoring
& Audit (EM&A) Report (HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Third Annual Environmental Monitoring &
Audit (EM&A) Report (Nov 2015 to Oct 2016)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2016 to Nov 2016)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2017)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Feb 2017 to Apr 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express
Rail Link
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-068/2000/A
|
Tuen Mun
Sewerage - Eastern Coastal Sewerage Extension
|
Monthly EM&A Report (May 2017)(DC/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4712015_content.html
|
|
|
|
|
EP-068/2000/A
|
Tuen Mun
Sewerage - Eastern Coastal Sewerage Extension
|
Quarterly EM&A Report (Mar 2017 to May
2017)(DC/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4712015_content.html
|
|
|
|
|
EP-381/2009
|
Tuen Mun
Area 54 Sewage Pumping Station
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (May 2017) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (May 2017) (CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road, TuenMun
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
|
|
EP-507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.6
|
http://www.epd.gov.hk/eia/english/register/aep/ep5072016_content.html
|
|
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Quarterly EM&A Report no.2
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.6
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
|
|
FEP-01/334/2009/E
|
Sludge Treatment Facilities
|
Monthly EM&A Report(Jun 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4932016_content.html
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport into a
Three-Runway System
|
Quarterly EM&A Report No.5 (Jan to Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha
Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Quarterly EM&A Report no.2
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.6
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
|
|
EP-311/2008/D
|
Proposed Comprehensive Development at Wo Shang Wai,
Yuen Long
|
Quarterly EM&A Report(Feb 2017 to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3932013_content.html
|
|
|
|
|
EP-311/2008/D
|
Proposed Comprehensive Development at Wo Shang Wai,
Yuen Long
|
Monthly EM&A Report(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3932013_content.html
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha
Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-343/2009
|
Hang Hau Tsuen Channel at Lau Fau Shan
|
Quarterly EM&A Report (Sep 2012 to Oct
2012) (Version 1.1)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3432009_content.html
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Dec 2016 to Feb
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/10,DC/2009/17,DC/2009/18)(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Mar
2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Feb
2017 to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel
|
Monthly Environmental Monitoring & Audit Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel
|
Quarterly Environmental Monitoring & Audit Report
(Feb 2017 to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
- Central & Western District
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Dec 2016 to Feb
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/10,DC/2009/17,DC/2009/18)(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Mar
2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Feb
2017 to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-520/2016
|
Agreement No. CE 24/2012 (GE) Landslip
Prevention and Mitigation Programme,
2012, Package A Landslip Prevention and Mitigation Works - Investigation,
Design and Construction - Landslip Prevention and Mitigation Works at
Feature Nos. 11SW-A/R94 and 11SW-A/FR218, Caine Lane, Mid-Levels
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5202016_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (May 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-408/2011/C
|
Central Police Station Conservation and Revitalisation Project
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4992016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai
Bypass
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and Exhibition Centre
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai East
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai
Bypass
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and Exhibition Centre
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai East
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Mar 2017 to May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP- 02/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central
- Wan Chai Bypass -
Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report No.71
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to
Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-408/2011/B
|
Central
Police Station Conservation and Revitalisation
Project
|
22nd Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
|
EP-313/2008/H
|
West
Island Line
|
Monthly EM&A Report (No.52)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4222013_content.html
|
|
|
|
|
EP-313/2008/H
|
West
Island Line
|
Monthly EM&A Report (No.59)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4222013_content.html
|
|
|
|
|
- Wan Chai
District
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Dec 2016 to Feb
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/10,DC/2009/17,DC/2009/18)(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Mar
2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Feb
2017 to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai
Bypass
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and Exhibition Centre
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai East
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai
Bypass
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and Exhibition Centre
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai East
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Mar 2017 to May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP- 02/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central
- Wan Chai Bypass -
Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-444/2012/A
|
MTR Wan Chai
Station Lee Tung Street Subway
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (May 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report No.71
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to
Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
- Eastern District
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Dec 2016 to Feb
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/10,DC/2009/17,DC/2009/18)(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Mar
2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Feb
2017 to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai
Bypass
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and Exhibition Centre
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai East
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai
Bypass
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and Exhibition Centre
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai East
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Mar 2017 to May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Mar 2017 to May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai
East(CWB Tunnel)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP- 02/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai
Bypass at Wan Chai West
(Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central
- Wan Chai Bypass -
Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Mar 2017)(version
3.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Quarterly EM&A Report (Feb 2017 to Apr
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (May 2017)(version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Quarterly EM&A Report (Feb 2017 to Apr
2017)(version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to
Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (May 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
- Southern District
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Dec 2016 to Feb
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/10,DC/2009/17,DC/2009/18)(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Mar
2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Feb
2017 to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report No.71
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to
Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-487/2014
|
Tai Shue
Wan Development at Ocean Park
|
Monthly EM&A Report (17 May 2017 - 31
May 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (May 2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Quarterly EM&A Report (Mar 2017 to May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May
2017)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Apr
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Mar 2017 to May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Quarterly EM&A Report (Mar 2017 to May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Monthly EM&A
Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-445/2013/A
|
Kai Tak
Development – Roads D3A & D4A
|
Monthly EM&A Report (May
2017)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
EP-437/2012
|
Shatin to
Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (Mar
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
|
|
EP-437/2012
|
Shatin to
Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May
2017)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Apr
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Mar 2017 to May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Quarterly EM&A Report (Mar 2017 to May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Mar 2017)(version
3.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Quarterly EM&A Report (Feb 2017 to Apr
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (May 2017)(version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Quarterly EM&A Report (Feb 2017 to Apr
2017)(version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for
Development at Anderson Road
|
Monthly EM&A Report (May
2017)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for
Development at Anderson Road
|
Monthly EM&A Report (Apr
2017)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for
Development at Anderson Road
|
Quarterly EM&A Report (Mar 2017 to May
2017)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for
Development at Anderson Road
|
Monthly EM&A Report (May
2017)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Annual EM&A Review Report (Oct 2013 to
Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Annual EM&A Review Report (Nov 2011 to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Aug 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Quarterly EM&A Report (May to Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Jul 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Quarterly EM&A Report (Feb to Apr 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Apr 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Mar 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Quarterly EM&A Report (Nov 2011 to Jan
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Jan 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Dec 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Nov 2011)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
|
|
- Sham Shui Po
District
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Dec 2016 to Feb
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report
(DC/2009/10,DC/2009/17,DC/2009/18)(May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Mar
2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Feb
2017 to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May
2017)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Apr
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Mar 2017 to May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Quarterly EM&A Report (Mar 2017 to May
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Yau Tsim
Mong District
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Quarterly EM&A Report (Nov to Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Quarterly EM&A Report (Feb to Apr 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover
Serving the West Kowloon Cultural District
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to
Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-437/2012
|
Shatin to
Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (Mar
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
|
|
EP-437/2012
|
Shatin to
Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (May
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Mar 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-440/2012
|
MTR Tsim
Sha Tsui Station Carnarvon Subway and Entrances
Modification Works
|
Monthly EM&A Report (May 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
|
|
EP-440/2012
|
MTR Tsim
Sha Tsui Station Carnarvon Subway and Entrances
Modification Works
|
Quarterly EM&A Report (Mar 2017 to May 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
|
|
EP-317/2009/A
|
Tsim Sha Tsui Station Northern Subway
|
Monthly EM&A Report (Sep 2015)(Final)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4232014_content.html
|
|
|
|
|
EP-317/2009
|
Tsim Sha Tsui
Station Northern Subway
|
Monthly EM&A Report (Apr 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|