Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
|
(for the period between 16 Jun 2018
to 15 Jul 2018)
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
ESB-308/2018
|
Aberdeen Boat Club, Middle Island Development
Phase III, IV and V
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/study/latest/esb-308.pdf
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
DIR-261/2018
|
Slope Upgrading Works of Feature No. 12NW-C/C8
Above Ha Yeung and Leung Fai Tin Along Clear
Water Bay Road, Sai Kung
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2612018.pdf
|
|
|
|
DIR-262/2018
|
Slope Upgrading Works at Feature No. 11SW-A/R526,
King's College, Bonham Road, Hong Kong
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2622018.pdf
|
|
DIR-263/2018
|
The Development of AFCD Animal Management and
Animal Welfare Building Complex in Kai Tak
Development
|
EIA Study Brief
|
https://www.epd.gov.hk/eia/register/permission/conditions/dir2632018.pdf
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
EIA-257/2018
|
Intermodal Transfer Terminal - Bonded Vehicular
Bridge and Associated Roads
|
Project Profile
|
https://www.epd.gov.hk/eia/register/report/eiareport/eia_2572018/Index.htm
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
NIL
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
VEP-542/2018
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Environmental Permit issued (EP-349/2009/M )
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5422018.htm
|
|
|
|
|
VEP-543/2018
|
Enhanced Ash Utilisation
and Water Management Facilities at the Castle Peak Power Station (CPPS)
|
Environmental Permit issued (EP-441/2012/A )
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5432018.htm
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
NIL
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
EP-454/2013
|
Reprovisioning of FEHD Sai Yee Street Vehicle Depot at Yen Ming Road, West
Kowloon Reclamation Area
|
Submission
of Environmental Impact Monitoring Report(May 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html
|
|
|
|
|
EP-457/2013/C
|
Central
Kowloon Route
|
Construction
Noise Mitigation Measure Plan (HY/2014/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-427/2011/A
|
Dredging, Management
and Capping of Contaminated Sediment Disposal Facility to the South of The
Brothers
|
Monthly
Progress Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
|
|
EP-489/2014
|
Expansion
of Hong Kong International Airport into a Three-Runway System
|
Construction
Phase Monthly EM&A Report No.29
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
EP-312/2008/A
|
Disposal of
Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha Cha
|
Monthly
Progress Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
EP-136/2002/E
|
Demolition
of buildings and structures in the proposed Kennedy Town Comprehensive
Development Area Site
|
Submission
of Review Report for New World First Bus Depot
|
https://www.epd.gov.hk/eia/english/register/index8/vep4752015_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Complaint
Management Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Submission
of Proposal of Reporting Mechanism
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Submission
of Construction Works Schedule and Laocation
Plans
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Submission
of Waste Management Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Submission
of Works Vessel Travel Route Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Submission
of Silt Curtain Deplovment Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Submission
of Spill Response Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Submission
of Dolphin Watching Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Submission
of Updated EM&A Manual
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-519/2016
|
Tung Chung
New Town Extension
|
Baseline
Monitoring Report for Tung Chung New Town Extension (East)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
|
EP-539/2017
|
Pacific
Light Cable Network (PLCN)– Deep Water Bay
|
Baseline
Water Quality Monitoring Report (Zone A and Zone B for Phase 2
Installation)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5392017_content.html
|
|
|
|
|
FEP-01/334/2009/E
|
Sludge
Treatment Facilities
|
Environmental
Monitoring Results in Operation Phase - Landfill Gas Monitoring (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4932016_content.html
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
- Island District
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
153th Monthly EM&A Report (12 May 2018
to 11 Jun 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7)
into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit
Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018) (HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Nov 2017)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2018)(HY/2014/05)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2018)(HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2018)(HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2018)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and
Audit Report (Jan 2018 to Mar 2018)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (May 2018)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Nov 2017) (HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(May 2018)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(May 2018)
(HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(May 2018)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly Environmental Monitoring and Audit Report Unit
L10& L11 (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part & remaining
part)
|
Monthly Environmental Monitoring and Audit Report (No.
154)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Thirty-sixth Monthly EM&A Summary Report(May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Twelfth Quarterly EM&A Summary Report(Mar 2018 to May
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Quarterly EM&A Report No.9 (Jan to Mar
2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
55th Monthly Environmental Monitoring and
Audit Report (May 2018)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2018)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
FEP-02/507/2016/A
|
Additional Gas-fired Generation units
Project - Installation of one additional gas-fired generation unit (CCGT Unit
No. 1) at the Black Point Power Station
|
Monthly
EM&A Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1762017_content.html
|
|
|
|
|
FEP-02/507/2016/A
|
Additional Gas-fired Generation units
Project - Installation of one additional gas-fired generation unit (CCGT
Unit No. 1) at the Black Point Power Station
|
Quarterly
EM&A Report (No.6)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1762017_content.html
|
|
|
|
|
EP-248/2006
|
Lamma Power
Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jan to Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jan to Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
|
AEP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Quarterly EM&A Report No.9 (1 Jan to 31
Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
- North District
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Monthly EM&A Report(May 2018)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
EP-474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further Expansion at Fanling North New Development Area
|
Monthly EM&A Report(Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4742013_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at Tai
Shu Ha, Yuen Long for Liantang
/ Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Jun 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Jun 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (May 2018)(version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Quarterly EM&A Report (Nov 2017 to Jan
2018)(version 2.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Feb 2018)(version
2.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Apr 2018) (version
2.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly EM&A Report (May 2018)(CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of
Sha Tin Water Treatment Works - South Works
|
Monthly EM&A Report No.27
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Tai Po District
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Jun 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Jun 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Monthly EM&A Report(May 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
EP-474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further Expansion at Fanling North New Development Area
|
Monthly EM&A Report(Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4742013_content.html
|
|
|
|
|
- Tsuen Wan District
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Monthly Environmental Monitoring And Audit
Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Quarterly Environmental Monitoring And
Audit Report (Feb 2018 to Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Thirty-sixth Monthly EM&A Summary Report(May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Twelfth Quarterly EM&A Summary Report(Mar 2018 to May
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report(DC/2009/10,DC/2009/17) (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
AEP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Quarterly EM&A Report No.9 (1 Jan to 31
Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
55th Monthly Environmental Monitoring and
Audit Report (May 2018)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (May 2018)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (May 2018) (CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
|
|
FEP-02/507/2016/A
|
Additional Gas-fired Generation units Project - Installation
of one additional gas-fired generation unit (CCGT Unit No. 1) at the Black
Point Power Station
|
Monthly EM&A
Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1762017_content.html
|
|
|
|
|
FEP-02/507/2016/A
|
Additional Gas-fired Generation units Project -
Installation of one additional gas-fired generation unit (CCGT Unit No. 1) at
the Black Point Power Station
|
Quarterly EM&A
Report (No.6)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1762017_content.html
|
|
|
|
|
EP-507/2016/A
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A
Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5312017_content.html
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Quarterly EM&A Report No.9 (Jan to Mar
2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
EP-068/2000/A
|
Tuen Mun Sewerage - Eastern Coastal
Sewerage Extension
|
Monthly EM&A Report (May
2018)(DC/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4712015_content.html
|
|
|
|
|
EP-068/2000/A
|
Tuen Mun Sewerage - Eastern Coastal
Sewerage Extension
|
Quarterly EM&A Report (Mar 2018 to May
2018)(DC/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4712015_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
AEP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Quarterly EM&A Report No.9 (1 Jan to 31
Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Mar 2018 to May
2018)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
|
|
EP-311/2008/E
|
Proposed Comprehensive Development at Wo Shang Wai, Yuen Long
|
Monthly EM&A Report(May 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
|
|
|
|
|
EP-311/2008/E
|
Proposed Comprehensive Development at Wo Shang Wai, Yuen Long
|
Quarterly EM&A Report(Feb 2018 to Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html
|
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang
/ Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
|
FEP-02/507/2016/A
|
Additional Gas-fired Generation units Project - Installation
of one additional gas-fired generation unit (CCGT Unit No. 1) at the Black
Point Power Station
|
Monthly EM&A
Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1762017_content.html
|
|
|
|
|
FEP-02/507/2016/A
|
Additional Gas-fired Generation units Project -
Installation of one additional gas-fired generation unit (CCGT Unit No. 1) at
the Black Point Power Station
|
Quarterly EM&A
Report (No.6)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1762017_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17) (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
- Central & Western District
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (May
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-408/2011/C
|
Central Police Station Conservation and Revitalisation Project
|
Monthly EM&A Report(May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4992016_content.html
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17) (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (May
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17) (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-444/2012/A
|
MTR Wan Chai Station Lee Tung
Street Subway
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html
|
|
|
|
|
- Eastern District
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (May 2018)(version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Quarterly EM&A Report (Nov 2017 to Jan
2018)(version 2.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Feb 2018)(version
2.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Apr 2018) (version
2.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (May
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (May
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (May 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17) (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
- Southern District
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan
Development at Ocean Park
|
Monthly EM&A Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17) (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-537/2017
|
Proposed Extension of Academic Block, The Swire Institute
of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Monthly EM&A Report No.8
|
http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html
|
|
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant
Retrofit Project
|
Quarterly EM&A Report (Jan to Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (May 2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May 2018)
(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Mar 2018 to May
2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (May 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (May
2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Quarterly EM&A Report (Mar 2018 to May
2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.4 (HY/2014/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (May 2018) (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (May 2018) (HY/2014/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Baseline EM&A Report (May 2018) (HY/2014/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.4 (HY/2014/09)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (May 2018) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (May 2018) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.4 (HY/2014/09)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (May 2018) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (May 2018) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Baseline EM&A Report (May 2018) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May 2018)
(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Mar 2018 to May
2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (May 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (May
2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Quarterly EM&A Report (Mar 2018 to May
2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (May 2018)(version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Quarterly EM&A Report (Nov 2017 to Jan
2018)(version 2.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Feb 2018)(version
2.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Apr 2018) (version
2.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.4 (HY/2014/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (May 2018) (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (May 2018) (HY/2014/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Baseline EM&A Report (May 2018) (HY/2014/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.4 (HY/2014/09)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (May 2018) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (May 2018) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.4 (HY/2014/09)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (May 2018) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (May 2018) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Baseline EM&A Report (May 2018) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
- Sham Shui Po
District
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(May
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17) (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May 2018)
(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Mar 2018 to May
2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building, Radar
Station and Hong Kong Aviation Club) of the Former Kai Tak
Airport
|
Monthly EM&A Report (May 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (May
2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Quarterly EM&A Report (Mar 2018 to May
2018)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Yau
Tsim Mong District
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover
Serving the West Kowloon Cultural District
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West
Kowloon Reclamation Development Phase 1
|
Monthly EM&A Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon Subway
and Entrances Modification Works
|
Quarterly EM&A Report (Mar 2018 to May
2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (May 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping Station and Dry Weather Flow
Interceptor at Cherry Street Box Culvert
|
Submission of Monthly EM&A Report No.5
|
http://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.4 (HY/2014/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (May 2018) (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (May 2018) (HY/2014/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Baseline EM&A Report (May 2018) (HY/2014/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.4 (HY/2014/09)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (May 2018) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (May 2018) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.4 (HY/2014/09)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (May 2018) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (May 2018) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Baseline EM&A Report (May 2018) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|