Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

Application for EIA Study Brief

 

ESB-230/2011

Proposed Residential Development East of Ping Kong, Sheung Shui, N. T.

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb230/esb230.pdf

 

ESB-231/2011

EMSD Hong Kong Workshop at Sheung On Street, Chai Wan

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb231/esb231.pdf

 

ESB-232/2011

Planning and Engineering Study on Future Land Use at Ex-Lamma Quarry Area at Sok Kwu Wan, Lamma Island – Feasibility Study

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb232/esb232.pdf

 

ESB-225/2011

Harvest Fatty Acid Methyl Ester and Edible Oil Plant Development at Yuen Long Industrial Estate

EIA Study Brief

http://www.epd.gov.hk/eia/register/study/latest/esb-225.pdf

 

ESB-226/2011

Development of Organic Waste Treatment Facilities, Phase 2

EIA Study Brief

http://www.epd.gov.hk/eia/register/study/latest/esb-226.pdf

 

ESB-227/2011

Drainage Improvement Works at Ngong Ping

EIA Study Brief

http://www.epd.gov.hk/eia/register/study/latest/esb-227.pdf

 

ESB-228/2011

Slip Roads from Tsing Tsuen Road to Tsuen Wan Road, and from Ma Tau Pa Road / Wing Shun Street to Tsuen Wan Bypass

EIA Study Brief

http://www.epd.gov.hk/eia/register/study/latest/esb-228.pdf

 

Application for Permission to Apply Directly for Environmental Permit

 

DIR-212/2011

Installation of a 500mm NB Gas Pipeline Inside the Existing Disused Tunnel (Old Beacon Hill Tunnel)

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/dir212/dir212.pdf

 

Application for Approval of EIA Report

 

Nil

 

Application for Environmental Permit

 

Nil

 

Application for Variation of an Environmental Permit

 

Nil

 

Application for Further Environmental Permit

 

Nil

 

 

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

EP-349/2009/B

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Supplementary Contamination Assessment Report and Remediation Action Plan for Kwai Chung Ventilation Building Works Area (Site H)

http://www.epd.gov.hk/eia/english/register/index8/vep3342010_content.html

 

EP-349/2009/B

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Baseline Monitoring Report (Part 13) (Rev.2)

http://www.epd.gov.hk/eia/english/register/index8/vep3342010_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Noise Management Plan

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Updated EM&A Manual (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-399/2010/A

Kwun Tong Line Extension

Alternative Proposal for Noise Monitoring Station CN5 and Dust Monitoring Stations CD3, CD 4 and CD6 (Revision A)

http://www.epd.gov.hk/eia/english/register/index8/vep3292011_content.html

 

Submission as required by Environmental Permit Condition - EM&A Reports

 

 

Island District

Central & Western District

 

 

 

North District

Wan Chai District

 

 

 

Sai Kung District

Eastern District

 

 

 

Sha Tin District

Southern District

 

 

 

Tai Po District

Kowloon City District

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

- Island District

 

EP-01/059/2000/B 

The Theme Park at Penny's Bay, Lantau

Monthly Environmental Monitoring and Audit Report for 67th Operating Month (12 Mar 2011-11 Apr 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html

 

FEP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 68)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

EP-071/2000/C

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

EP-071/2000/C 

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

EP-170/2003/B

Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha

Bi - Monthly EM&A Report (Sep 2010)

http://www.epd.gov.hk/eia/english/register/index8/vep2152006_content.html

 

EP-229/2005

Development of SkyCity Golf Course

EM&A Quarterly Compliance Report (Feb 2011 to Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-281/2007/A

Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A Report (No.8) (Mar 2011) (DC/2009/13)

http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html

 

EP-282/2007

Outlying Islands Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall

Monthly EM&A Report (No.7) (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html

 

- North District

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Mar 2011) (Stage 1)

http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html

 

EP-324/2008 

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Apr 2011) (Stage 1)

http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report ( Feb 2011 )

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report ( Mar 2011 )

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report ( Apr 2011 )

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

EP-400/2010 

Major Restoration to the Residence of Ip Ting-sz, Lin Ma Hang Tsuen, Sha Tau Kok, N.T.

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep4002010_content.html

 

FEP-03/347/2009

Construction of a Secondary Boundary Fence at Sha Tau Kok

Monthly EM&A Report ( Feb 2011 )

http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html

 

FEP-03/347/2009

Construction of a Secondary Boundary Fence at Sha Tau Kok

Monthly EM&A Report ( Mar 2011 )

http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html

 

FEP-03/347/2009

Construction of a Secondary Boundary Fence at Sha Tau Kok

Monthly EM&A Report ( Apr 2011 )

http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html

 

FEP-04/347/2009/A 

Construction of a Secondary Boundary Fence at Sha Tau Kok (Remaining Section)

Monthly EM&A Report ( Feb 2011 )

http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html

 

FEP-04/347/2009/A 

Construction of a Secondary Boundary Fence at Sha Tau Kok (Remaining Section)

Monthly EM&A Report ( Mar 2011 )

http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html

 

FEP-04/347/2009/A 

Construction of a Secondary Boundary Fence at Sha Tau Kok (Remaining Section)

Monthly EM&A Report ( Apr 2011 )

http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html

 

FEP-01/347/2009

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road - Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai Po to Lok Ma Chau Control Point"

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html

 

FEP-01/347/2009

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road - Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai Po to Lok Ma Chau Control Point"

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html

 

FEP-02/347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma Chau Control Point to Ng Tung River)

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html

 

FEP-02/347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma Chau Control Point to Ng Tung River)

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html

 

- Sai Kung District

 

EP-134/2002/H

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Contract No.: CV/2009/02) (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2752008.html

 

EP-134/2002/I 

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Mar 2011) (CV/2010/05)

http://www.epd.gov.hk/eia/english/register/index8/vep3322011.html

 

EP-319/2009/A

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly Environmental Monitoring & Audit Report (Mar 2011) (Version 1.0)

http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html

 

- Sha Tin District

 

EP-332/2009

Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha Phase One Project

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3322009_content.html

 

EP-332/2009

 Road D1(N), Road D1(W) and Box Culvert of Whitehead & Lok Wo Sha Phase One Project

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3322009_content.html

 

- Tai Po District

 

EP-265/2007

Tai Po Sewage Treatment Works, Stage V

Monthly Environmental and Audit Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Mar 2011) (Stage 1)

http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html

 

EP-324/2008 

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Apr 2011) (Stage 1)

http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html

 

- Tsuen Wan District

 

EP-01/059/2000/B 

The Theme Park at Penny's Bay, Lantau

Monthly Environmental Monitoring and Audit Report for 67th Operating Month (12 Mar 2011-11 Apr 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html

 

FEP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 68)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report No.15 (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jan 2011 to Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

- Tuen Mun District

 

EP-210/2005/A

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly Environmental Monitoring and Audit Report (CV/2009/02) (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html

 

EP-226/2005/A

Development of an EcoPark in Tuen Mun Area 38

Quarterly EM&A Compliance Report (Nov 2010 to Jan 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2212006_content.html

 

EP-251/2006 

Emissions Control Project at Castle Peak Power Station "B" Units

Environmental Monitoring and Audit Monthly Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2512006_content.html

 

EP-296/2007

Proposed Joint User Complex and Wholesale Fish Market at Area 44 Tuen Mun

Monthly Environmental Monitoring & Audit Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2962007_content.html

 

EP-296/2007

Proposed Joint User Complex and Wholesale Fish Market at Area 44 Tuen Mun

Monthly Environmental Monitoring & Audit Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2962007_content.html

 

EP-321/2008

Upgrading of Pillar Point Sewage Treatment Works

Monthly EM&A Report No.5

http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html

 

EP-321/2008

Upgrading of Pillar Point Sewage Treatment Works

Monthly EM&A Report No.6

http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html

 

EP-342/2009/B

Traffic Improvements to Tuen Mun Road Town Centre Section

Monthly EM&A Report (Mar 2011) (Final)

http://www.epd.gov.hk/eia/english/register/index8/vep3352011_content.html

 

EP-342/2009/B

Traffic Improvements to Tuen Mun Road Town Centre Section

Monthly EM&A Report (Apr 2011) (Final)

http://www.epd.gov.hk/eia/english/register/index8/vep3352011_content.html

 

EP-391/2010

Black Point Gas Supply Project (First Phase)

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3912010_content.html

 

EP-391/2010

Black Point Gas Supply Project (First Phase)

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3912010_content.html

 

FEP-01/334/2009

Sludge Treatment Facilities

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1152010_content.html

 

FEP-01/334/2009 

Sludge Treatment Facilities

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1152010_content.html

 

- Yuen Long District

 

EP-263/2007

Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2632007_content.html

 

EP-263/2007 

Yuen Long, Kam Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam Tin Secondary Drainage Channel KT13

Monthly EM&A Report (Feb 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2632007_content.html

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report (Feb 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

EP-347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html

 

FEP-01/347/2009

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road - Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai Po to Lok Ma Chau Control Point"

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html

 

FEP-01/347/2009

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road - Contract No. SSW317 "Construction of a Secondary Boundary Fence from Mai Po to Lok Ma Chau Control Point"

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0992010_content.html

 

FEP-02/347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma Chau Control Point to Ng Tung River)

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html

 

FEP-02/347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma Chau Control Point to Ng Tung River)

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html

 

- Kwai Tsing District

 

EP-121/2002/A

Demolition of Kwai Chung Incineration Plant

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2842009_content.html

 

EP-121/2002/A 

Demolition of Kwai Chung Incineration Plant

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2842009_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report No.15 (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jan 2011 to Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

- Central & Western District

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

EP-313/2008/C

West Island Line

Environmental Monitoring & Audit Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2982009.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report No.15 (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jan 2011 to Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2010 to Feb 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3912010_content.html

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

FEP-05/356/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

FEP-01/272/2007/B 

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Jan to Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

- Wan Chai District

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report No.15 (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jan 2011 to Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Dec 2010 to Feb 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html

 

EP-364/2009/A

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep3912010_content.html

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-02/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

FEP-05/356/2009/A

Central - Wan Chai Bypass - Central Interchange (Contract No. HY/2009/18)

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html

 

FEP-01/272/2007/B 

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Jan to Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

- Eastern District

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report No.15 (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jan 2011 to Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

FEP-01/356/2009

Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

FEP-01/356/2009

 Wan Chai Development Phase II and Central - Wan Chai Bypass - North Point Reclamation

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

- Southern District

 

EP-249/2006/A

Repositioning and Long Term Operation Plan of Ocean Park

Monthly Environmental Monitoring and Audit Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html

 

EP-249/2006/A 

Repositioning and Long Term Operation Plan of Ocean Park

Quarterly Environmental Monitoring and Audit Report (Jan to Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2232006_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report No.15 (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jan 2011 to Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

FEP-01/272/2007/B 

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (DC/2007/10) (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

FEP-01/275/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Jan to Mar 2011)

http://www.epd.gov.hk/eia/english/register/index7/fep0962009_content.html

 

- Kowloon City District

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

- Kwun Tong District

 

Nil

 

- Sham Shui Po District

 

EP-253/2006

Mass Transit Railway - Lai Chi Kok Station Cheung Lai Street Pedestrian Subway and Entrances Works

Monthly Environmental Monitoring And Audit Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2532006_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Dec 2010 to Feb 2011) (Ver 1.1) (DC/2007/23, DC/2009/05, DE/2009/02, DC/2009/17)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report No.15 (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Apr 2011) (Ver 1.1) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Jan 2011 to Mar 2011) (DC/2008/09) (Ver 2.0)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

- Wong Tai Sin District

 

Nil

 

- Yau Tsim Mong District

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

EP-414/2011

Reprovision of Bridges D1 and T in West Kowloon

Monthly EM&A Report (Mar 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html

 

EP-414/2011

Reprovision of Bridges D1 and T in West Kowloon

Monthly EM&A Report (Apr 2011)

http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html