Monthly
Update of Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the
period between 16 May 2013 to 15 Jun
2013)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
Application
for EIA Study Brief
|
|
|
ESB-261/2013
|
Tai Shue Wan Development at Ocean Park
|
EIA
Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-261.pdf
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
DIR-228/2013
|
Asia Pacific Gateway (APG)
- Tseung Kwan O
|
Project
Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir228/dir228.pdf
|
|
|
DIR-229/2013
|
Replacement of the Existing 11KV
Submarine Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
Project
Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir229/dir229.pdf
|
|
|
Application
for Approval of EIA Report
|
|
|
Nil
|
|
|
Application
for Environmental Permit
|
|
|
AEP-450/2013
|
Construction of Cycle Tracks and
the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung
River
|
Environmental Permit issued (EP-450/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4502013.htm
|
|
|
AEP-452/2013
|
Temporary Sewage Pumping Station
Ancillary to Tung Chung Area 56 Public Housing Development
|
Environmental Permit issued (EP-452/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4522013.htm
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
VEP-403/2013
|
Organic Waste Treatment
Facilities, Phase I
|
Environmental Permit issued (EP-395/2010/B )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4032013.htm
|
|
|
VEP-404/2013
|
West Island Line
|
Environmental Permit issued (EP-313/2008/G )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4042013.htm
|
|
|
Application
for Further Environmental Permit
|
|
|
Nil
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
EP-407/2010/B
|
South Island Line (East)
|
Trial Mix Test Result Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3842012_content.html
|
|
|
EP-407/2010/B
|
South Island Line (East)
|
Construction & Demolition Materials Management Plan (April 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3842012_content.html
|
|
|
EP-438/2012/B
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Archaeological Action Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
- Island District
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part
& remaining part)
|
Monthly Environmental Monitoring
and Audit Report (No. 91)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
90th Monthly EM&A Report (12 Feb 2013 to
11 Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue
Gas Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Oct to
Dec 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging,
Management and Capping of sediment Disposal Facility at Sha Chau
|
Monthly EM&A Report (Feb
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging,
Management and Capping of sediment Disposal Facility at Sha Chau
|
43th Monthly Progress Report (Jan 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Monthly EM&A Report (Feb 2013) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma
Extension
|
Monthly Environmental Monitoring
and Audit Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5
& GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring
And Audit Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Oct 2012)(DC/2006/11)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Nov 2012) (DC/2006/11)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern
Lantau
|
Monthly Environmental Monitoring
& Audit Report (Dec 2012) (DC/2006/11)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station
at Lamma Extension
|
Monthly Environmental Monitoring
and Audit Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas
Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring
And Audit Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Quarterly EM&A Report (Sep
2012 to Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping
of Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly EM&A Report (Feb
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping
of Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly EM&A Report (Jan 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring
& Audit Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
- North District
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Dec 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence and
new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Final EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop
Shek Crematorium
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop
Shek Crematorium
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
- Sai Kung District
|
|
|
FEP-02/428/2011/A
|
Drainage Diversion Works For the
Comprehensive Residential Development At Various Lots In DD227 & DD229,
Tai Po Tsai, Sai Kung
|
6th Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly EM&A Report (Feb
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
EP-410/2010
|
Phase III Redevelopment of The Hong
Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor
Training Camp
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4102010_content.html
|
|
|
- Sha Tin District
|
|
|
Nil
|
|
|
- Tai Po District
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in
Upper Tai Po River
|
Monthly EM&A Report (Jan 2013)
(DC/2007/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in
Upper Tai Po River
|
Monthly EM&A Report (Dec 2012)
(DC/2007/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in Upper Tai Po River
|
Monthly EM&A Report (Feb
2013) (DC/2007/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Feb
2013) (DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B
|
Monthly Environmental and Audit
Report (Feb 2013) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B
|
Monthly Environmental and Audit
Report (Feb 2013) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
-
Tsuen Wan District
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan and Kwai
Chung - Tsuen Wan Drainage Tunnel
|
Quarterly EM&A Report (Oct to
Dec 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan and Kwai Chung
- Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Feb 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
-
Tuen Mun District
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road, Tuen Mun
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Monthly EM&A Report (Feb 2013) Final
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Monthly EM&A Report (Mar 2013) Final
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Quarterly EM&A Report (Nov
2012 to Jan 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping
Station
|
Monthly EM&A Report (Feb
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Feb 2013)(EP/SP/58/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
FEP-01/334/2009/A
|
Sludge Treatment Facilities
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3452011_content.html
|
|
|
EP-321/2008
|
Upgrading of Pillar Point Sewage
Treatment Works
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road, Tuen Mun
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
EP-210/2005/A
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Quarterly Environmental
Monitoring and Audit Report (Dec 2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
EP-391/2010/A
|
Black Point Gas Supply Project
(First Phase)
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3402011_content.html
|
|
|
EP-391/2010/A
|
Black Point Gas Supply Project
(First Phase)
|
Monthly EM&A Report (Apr
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3402011_content.html
|
|
|
- Yuen Long District
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Dec 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Final EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Quarterly EM&A Report (Nov
2012 to Jan 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
- Kwai Tsing District
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan and Kwai
Chung - Tsuen Wan Drainage Tunnel
|
Quarterly EM&A Report (Oct to
Dec 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan and Kwai
Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Feb 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Central & Western District
|
|
|
EP-313/2008/F
|
West Island Line
|
Monthly EM&A Report No.43
|
http://www.epd.gov.hk/eia/english/register/index8/vep3762012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2012 to Feb
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and
Revitalisation Project
|
Monthly EM&A Report (No.17)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central - Wan Chai Bypass - North Point Reclamation
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase
II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central - Wan
Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Feb 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Monthly EM&A Report (Feb
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
- Wan Chai District
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection
Works at Causeway
Bay Typhoon Shelter
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2012 to Feb
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II
- Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central - Wan Chai Bypass - North Point Reclamation
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Feb 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase
II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central - Wan
Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
- Eastern District
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2012 to Feb
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-442/2012
|
EMSD Hong Kong Workshop at
Sheung On Street, Chai Wan
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection
Works at Causeway
Bay Typhoon Shelter
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson
Crematorium
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central - Wan Chai Bypass - North Point Reclamation
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine
Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development
|
3rd Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine
Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development
|
10th Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-442/2012
|
EMSD Hong
Kong Workshop at Sheung On Street, Chai Wan
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Feb 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase
II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central - Wan
Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
- Southern District
|
|
|
EP-407/2010/B
|
South Island Line (East)
|
Monthly EM&A Report No.21
|
http://www.epd.gov.hk/eia/english/register/index8/vep3842012_content.html
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Feb 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2013)(DC/2007/23,DC/2009/10,
DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Kowloon City District
|
|
|
EP-401/2010
|
Installation of Submarine
Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development
|
3rd Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-401/2010
|
Installation of Submarine
Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development
|
10th Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
- Kwun Tong District
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
- Sham Shui Po District
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Feb 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Feb
2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Wong Tai Sin District
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Dec
2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
- Yau Tsim Mong District
|
|
|
EP-317/2009
|
Tsim Sha Tsui Station Northern Subway
|
Monthly EM&A Report (Feb
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T
in West Kowloon
|
Monthly EM&A Report (Mar 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
|
|
|
|
|