Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the period between 16 May 2014 to 15 Jun 2014)
|
|
|
Application No. / Permit
No.
|
Project Title
|
Document Name
|
Hyperlink
|
|
|
Application for EIA Study
Brief
|
|
|
ESB-272/2014
|
Sunny Bay Development
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-272.pdf
|
|
|
ESB-274/2014
|
Kai Tak Multi-purpose Sports
Complex
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb274/esb274.pdf
|
|
|
Application for
Permission to Apply Directly for Environmental Permit
|
|
|
DIR-237/2014
|
Natural
Terrain Hazard Mitigation Works at Study Area 12SW-A/SA1, Tai Wan Tau Road, Sai
Kung
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2372014.pdf
|
|
|
Application for Approval
of EIA Report
|
|
|
EIA-221/2014
|
Tai Shue Wan Development at Ocean Park
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2212014/index.htm
|
|
|
EIA-222/2014
|
Development of Anderson Road
Quarry
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2222014/main%20page.htm
|
|
|
Application for
Environmental Permit
|
|
|
AEP-490/2014
|
Drainage Works at Mai Po
|
Environmental Permit issued
(EP-490/2014)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4902014.htm
|
|
|
AEP-491/2014
|
Natural Terrain Hazard
Mitigation Works at Study Area 12NW-C/SA2, Sheung Yeung, Sai Kung
|
Environmental Permit issued
(EP-491/2014)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4912014.htm
|
|
|
AEP-492/2014
|
Natural Terrain Hazard
Mitigation Works at Study Area 12SW-A/SA1, Tai Wan Tau Road, Sai Kung
|
Environmental Permit issued
(EP-492/2014)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4922014.htm
|
|
|
Application for Variation
of an Environmental Permit
|
|
|
VEP-437/2014
|
Upgrading of Pillar Point Sewage
Treatment Works
|
Environmental Permit issued
(EP-321/2008/B)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4372014.htm
|
|
|
Application for Further
Environmental Permit
|
|
|
Nil
|
|
|
Submission as required by
Environmental Permit Condition - Design / Environmental Submissions
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Impact Water Quality
Monitoring Report (Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-392/2010
|
Improvement of Fresh
Water Supply to Cheung Chau
|
Baseline Monitoring
Report (TCS/00684/13)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Noise Management Plan
(Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
Submission as required by
Environmental Permit Condition - EM&A Reports
|
|
|
|
Island
District
|
Central
& Western District
|
|
|
|
|
North
District
|
Wan Chai
District
|
|
|
|
|
Sai Kung
District
|
Eastern
District
|
|
|
|
|
Sha Tin
District
|
Southern
District
|
|
|
|
|
Tai Po District
|
Kowloon
City District
|
|
|
|
|
Tsuen Wan
District
|
Kwun
Tong District
|
|
|
|
|
Tuen Mun
District
|
Sham Shui
Po District
|
|
|
|
|
Yuen Long
District
|
Wong Tai
Sin District
|
|
|
|
|
Kwai Tsing
District
|
Yau Tsim
Mong District
|
|
|
|
-
Island District
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Oct
to Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue
Gas Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Oct
to Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Mar
2014)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Feb
2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Mar
2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Apr
2014)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental
Monitoring and Audit Report (No. 103)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-352/2009/B
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Quarterly EM&A Report (Jun
to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4092013_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
102nd Monthly EM&A Report
(12 Feb 2014 to 11 Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-281/2007
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Quarterly EM&A Summary
Report (Sep 2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2812007_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Quarterly EM&A Summary
Report (Sep 2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Monthly EM&A Report (Feb 2014)
(DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Monthly EM&A Report (Mar
2014) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Quarterly EM&A Report (Nov
2013 to Jan 2014) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report (Mar
2014)(HY/2011/09 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report (Mar
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Mar
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao Bridge
Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Mar
2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas
Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental
Monitoring And Audit Report (Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station
at Lamma Extension
|
Monthly Environmental
Monitoring and Audit Report (Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental
Monitoring & Audit Report (Feb 2014) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Mar 2014)(HY/2010/02
)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
-
North District
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Monthly EM&A Report (Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Quarterly EM&A Report (Nov
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Monthly EM&A Report (Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Quarterly EM&A Report (Dec 2013
to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
-
Sai Kung District
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai
Wai to Hung Hom Section
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly
EM&A Report (Mar 2014) (CV/2013/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-410/2010/A
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Quarterly
EM&A Report (Jan to Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3962013_content.html
|
|
|
EP-435/2011
|
Sewerage Works at Pik Shui Sun Tsuen
|
Monthly EM&A Report (Apr
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html
|
|
|
-
Sha Tin District
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai
Wai to Hung Hom Section
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
-
Tai Po District
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Feb 2014) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Feb 2014) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Quarterly EM&A Report (Nov
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
EP-419/2011/B
|
Sediment Removal at Yim Tin
Tsai (East) Fish Culture Zone
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4272014_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
- Tsuen Wan District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Sep
2013 to Nov 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-275/2007
|
Drainage Improvement in
Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Final EM&A Report (Feb
2014)(DC/2007/12)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
- Tuen Mun District
|
|
|
EP-334/2009
|
Sludge Treatment Facilities
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3342009_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Quarterly EM&A Report (Nov
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Monthly EM&A Report (Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-226/2005
|
Development of an EcoPark in
Tuen Mun Area 38
|
Quarterly EM&A Report (Jan 2014 to Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2262005_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point
Sewage Treatment Works
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Mar
2014) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road, Tuen Mun
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road, Tuen Mun
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Mar
2014)(HY/2010/02 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road, Tuen Mun
|
Annual EM&A Report (Dec 2012 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
-
Yuen Long District
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary
Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road
(Section 3)
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary Boundary
Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 3)
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
-
Kwai Tsing District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Sep
2013 to Nov 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-275/2007
|
Drainage Improvement in
Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Final EM&A Report (Feb
2014)(DC/2007/12)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
-
Central & Western District
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Sep
2013 to Nov 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Mar
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-313/2008/H
|
West Island Line
|
Monthly EM&A Report (No.55)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4222013_content.html
|
|
|
EP-447/2013
|
Decommissioning of the Magazine Site at Victoria Road
for West Island Line
|
Monthly EM&A Report No.4
|
http://www.epd.gov.hk/eia/english/register/aep/ep4472013_content.html
|
|
|
EP-447/2013
|
Decommissioning of the Magazine Site at Victoria Road
for West Island Line
|
Monthly EM&A Report No.5
|
http://www.epd.gov.hk/eia/english/register/aep/ep4472013_content.html
|
|
|
EP-286/2007/B
|
The Expansion of Heliport Facilities at Macau Ferry Terminal
|
Monthly EM&A Report No.28
|
http://www.epd.gov.hk/eia/english/register/index8/vep2802008_content.html
|
|
|
-
Wan Chai District
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Sep
2013 to Nov 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Mar 2014)
(HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Apr
2014) No.33
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
-
Eastern District
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Sep
2013 to Nov 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
7th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
22nd Monthly EM&A Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Mar
2014) (HK/2001/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson
Crematorium
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
-
Southern District
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Apr
2014) No.33
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Sep
2013 to Nov 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
-
Kowloon City District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Quarterly EM&A Report (Oct
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving
Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
7th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
22nd Monthly EM&A Report (Apr 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.19
(Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai
Wai to Hung Hom Section
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
-
Kwun Tong District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Quarterly EM&A Report (Oct
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving
Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Feb
2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Feb
2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Mar
2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Quarterly EM&A Report (Jan
to Mar 2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
-
Sham Shui Po District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (Sep
2013 to Nov 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Mar
2014)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
-
Wong Tai Sin District
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Dec
2013 to Feb 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Quarterly EM&A Report (Oct
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving
Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Feb
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai
Wai to Hung Hom Section
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
-
Yau Tsim Mong District
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station
Carnarvon Subway and Entrances Modification Works
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-317/2009
|
Tsim Sha Tsui Station Northern
Subway
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-438/2012/E
|
Shatin to Central Link - Tai
Wai to Hung Hom Section
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4322014_content.html
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Mar
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T
in West Kowloon
|
Monthly EM&A Report (Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.19
(Mar 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
|
|
|
|
|
|
|