Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
|
(for the period between 16 May 2018
to 15 Jun 2018)
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
ESB-308/2018
|
Aberdeen Boat Club, Middle Island Development
Phase III, IV and V
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/esb308/esb308.pdf
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
DIR-261/2018
|
Slope Upgrading Works of Feature No. 12NW-C/C8
Above Ha Yeung and Leung Fai Tin Along Clear
Water Bay Road, Sai Kung
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/dir261/dir261.pdf
|
|
|
|
DIR-262/2018
|
Slope Upgrading Works at Feature No.
11SW-A/R526, King's College, Bonham Road, Hong Kong
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/dir262/dir262.pdf
|
|
DIR-263/2018
|
The Development of AFCD Animal Management and
Animal Welfare Building Complex in Kai Tak
Development
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/dir263/dir263.pdf
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
EIA-256/2018
|
Hong Kong Offshore LNG Terminal
|
Project Profile
|
https://www.epd.gov.hk/eia/register/report/eiareport/eia_2562018/HTML/0359722_HKOLNG%20EIA_index.htm
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
AEP-559/2018
|
Natural Terrain Hazard Mitigation Works at
Study Area 11NE-B/SA3,Razor Hill, Clear Water Bay Road
|
Environmental Permit issued (EP-559/2018)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5592018.htm
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
Nil
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
FEP-187/2018
|
South East New Territories (SENT) Landfill
Extension
|
Environmental Permit issued (FEP-01/308/2008/B)
|
https://www.epd.gov.hk/eia/register/permit/latest/fep1872018.htm
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental Submissions
|
|
|
|
|
EP-454/2013
|
Reprovisioning of FEHD Sai Yee Street Vehicle Depot at Yen Ming Road, West
Kowloon Reclamation Area
|
Submission
of Environmental Impact Monitoring Report(Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central
Kowloon Route - Kai Tak West
|
Baseline Monitoring
Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
EP-427/2011/A
|
Dredging, Management
and Capping of Contaminated Sediment Disposal Facility to the South of The
Brothers
|
Monthly
Progress Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central
Kowloon Route - Kai Tak West
|
Baseline
Monitoring Report (HY/2014/09)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
EP-312/2008/A
|
Disposal of
Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha Cha
|
Monthly
Progress Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
EP-539/2017
|
Pacific
Light Cable Network (PLCN)– Deep Water Bay
|
Phase 1-
Post Project Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep5392017_content.html
|
|
|
|
|
FEP-01/334/2009/E
|
Sludge
Treatment Facilities
|
Environmental
Monitoring Results in Operation Phase - Landfill Gas Monitoring (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4932016_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening
of Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
First
Operational Phase Noise Monitoring Report (Rev.3)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening
of Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
Second
Operational Phase Noise Monitoring Report (Rev.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition
Centre - Tunnel Works
|
Updated
Landscape Plan(Rev.5)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Commencement
of Construction Works and Management Organization of the Main Construction
Companies(CV/2013/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Commencement
of Construction Works and Management Organization of the Main Construction
Companies(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-324/2008/A
|
Widening of
Tolo Highway/Fanling
Highway between Island House Interchange and Fanling
|
Commencement
of Construction Works and Management Organization of the Main Construction
Companies(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Commencement
Date of Construction of the Project (CV/2012/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Commencement
Date of Construction(CV/2013/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Commencement
Date of Construction(CV/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Commencement
Date of Construction (NE/2014/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Proposed
Environmental Team(ET) and ET Leader(CV/2013/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Environmental
Team(ET) and ET Leader
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Management
Organization of the Main Construction Company(CV/2012/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Management
Organisation of the Main Contractor
Companies(CV/2013/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Management
Organisation of the Main Contractor
Companies(NE/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Management
Organisation of the Main Contractor Company
(NE/2014/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Submission
of Project Layout Plan for Contract 5 of the Project (Rev.01) (CV/2013/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Submission
of Project Layout Plan for Contract 3 of the Project(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Project
Layout Plan(CV/2012/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Submission
of Project Layout Plan (CV/2013/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Submission
of Project Layout Plan (CV/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Submission
of Project Layout Plan (NE/2014/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Vegetation
Survey Report(Revision 4)(CV/2013/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Vegetation
Survey Report(Revision 5)(CV/2013/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Woodland
Compensation Plan(Revision 1)(CV/2013/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Habitat
Creation and Management Plan(Revision2)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Landscape
Plan(Rev.2)(CV/2013/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Submission
of Topsoil Management Plan(Rev.01)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Submission
of Topsoil Management Plan(Rev.01) (CV/2013/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011/B
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Submission
of Updated Topsoil Management Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep4582014_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Submission
of Updated Topsoil Management Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Submission
of Updated Topsoil Management Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Submission
of Ecological Monitoring Reports for the Woodland Compensation Area - March
to May 2018
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
FEP-06/129/2002/G
|
Sheung Shui to Lok Ma Chau Spur Line
|
Habitat
Creation and Management Plan (Jan 2014)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4162013_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Silt
Curtain Deployment Plan (Rev. O)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
EP-545/2017
|
Decommissioning and Disposal of Clinical Waste
Incinerators at Block K, Queen Mary Hospital
|
Site
Audit Report NO. 3
|
https://www.epd.gov.hk/eia/english/register/aep/ep5452017_content.html
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
- Island District
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
152th Monthly EM&A Report (12 Apr 2018
to 11 May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7)
into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit
Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2017 to Nov 2017)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Submission of Contract Specific EM&A
Manual(Rev.9)(HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018) (HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018) (HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018) (HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018) (HY/2014/05)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Feb 2018) (HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Mar 2018)(HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Apr 2018)
(HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2017 to Nov 2017)(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly Environmental Monitoring and Audit Report Unit
L10& L11 (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part &
remaining part)
|
Monthly Environmental Monitoring and Audit Report (No.
153)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Thirty-fifth Monthly EM&A Summary Report(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.28
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
54th Monthly Environmental Monitoring and
Audit Report (Apr 2018)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2017 to Nov 2017)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Fourth Annual Environmental Monitoring and
Audit Report (May 2018)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
FEP-02/507/2016/A
|
Additional Gas-fired Generation units
Project - Installation of one additional gas-fired generation unit (CCGT
Unit No. 1) at the Black Point Power Station
|
Monthly
EM&A Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1762017_content.html
|
|
|
|
|
- North District
|
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Monthly EM&A Report(Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Feb 2018 to Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Submission of EM&A Programme
(Revision 7)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang
/ Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Quarterly EM&A Report (Feb 2018 to Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Final Quarterly EM&A Report (Feb 2018 - Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Final Quarterly EM&A Report (Feb 2018 - Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Apr 2018)(version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly EM&A Report (Apr 2018) (CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area
137
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)(CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of
Sha Tin Water Treatment Works - South Works
|
Monthly EM&A Report No.26
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Jun 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Jul 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Aug 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Oct 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Nov 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
- Tai Po District
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Final Quarterly EM&A Report (Feb 2018 - Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Final Quarterly EM&A Report (Feb 2018 - Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Monthly EM&A Report(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Jun 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Jul 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Aug 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Oct 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
EP-265/2007/A
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Nov 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4342014_content.html
|
|
|
|
|
- Tsuen Wan District
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Apr
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17)(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Sep 2017 to Nov 2017)
(DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Jan 2018 to Mar
2018)(Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.28
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Monthly Environmental Monitoring And Audit
Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Thirty-fifth Monthly EM&A Summary Report(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
54th Monthly Environmental Monitoring and Audit
Report (Apr 2018)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2017 to Nov 2017)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2018)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Fourth Annual Environmental Monitoring and
Audit Report (May 2018)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Apr 2018) (CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Quarterly EM&A Report (Feb 2018 to Apr 2018)
(CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
|
|
FEP-02/507/2016/A
|
Additional Gas-fired Generation units Project - Installation
of one additional gas-fired generation unit (CCGT Unit No. 1) at the Black
Point Power Station
|
Monthly EM&A
Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1762017_content.html
|
|
|
|
|
EP-507/2016/A
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A
Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5312017_content.html
|
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.28
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
EP-068/2000/A
|
Tuen Mun Sewerage - Eastern Coastal
Sewerage Extension
|
Monthly EM&A Report (Apr 2018)
(DC/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4712015_content.html
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Quarterly EM&A Report (Feb 2018 to Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Feb 2018 to Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang
/ Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A
Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Quarterly EM&A
Report (Feb 2018 to Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
FEP-02/507/2016/A
|
Additional Gas-fired Generation units Project -
Installation of one additional gas-fired generation unit (CCGT Unit No. 1)
at the Black Point Power Station
|
Monthly EM&A
Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1762017_content.html
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Apr
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17)(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Sep 2017 to Nov 2017)
(DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Jan 2018 to Mar
2018)(Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
- Central & Western District
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Feb 2018 to Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-408/2011/C
|
Central Police Station Conservation and Revitalisation
Project
|
Monthly EM&A Report(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4992016_content.html
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17)(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Sep 2017 to Nov 2017)
(DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Jan 2018 to Mar
2018)(Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Final EM&A Report Part 2
|
https://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Feb 2018 to Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Apr
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17)(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Sep 2017 to Nov 2017)
(DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Jan 2018 to Mar
2018)(Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Final EM&A Report Part 2
|
https://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
- Eastern District
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2017 to Feb 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass Tunnel
(North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2017 to Feb 2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Apr 2018)(version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Apr 2018) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Feb 2018 to Apr 2018)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Apr
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17)(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Sep 2017 to Nov 2017)
(DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Jan 2018 to Mar
2018)(Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
- Southern District
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan
Development at Ocean Park
|
Monthly EM&A Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Apr
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17)(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Sep 2017 to Nov 2017)
(DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Jan 2018 to Mar
2018)(Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-537/2017
|
Proposed Extension of Academic Block, The Swire Institute
of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Monthly EM&A Report No.7
|
http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html
|
|
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Final EM&A Report Part 2
|
https://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Apr 2018) (KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May
2018)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Apr 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Apr 2018)
(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Apr 2018)
(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (May 2018)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Apr 2018) (KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.1 (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.2 (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No. 3 (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.1 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.2 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No. 3 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.1 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.2 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No. 3 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May
2018)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Apr 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Apr 2018)
(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Apr 2018)
(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Apr 2018)(version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.1 (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.2 (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.3 (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.1 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.2 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.3 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.1 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.2 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.3 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
EP-140/2002
|
Po Lam Road - road widening
|
Quarterly EM&A Report (Dec 2017
to Feb 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep1402002cv200703.html
|
|
|
|
|
EP-140/2002
|
Po Lam Road - road widening
|
Monthly EM&A Report (Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep1402002cv200703.html
|
|
|
|
|
EP-140/2002
|
Po Lam Road - road widening
|
Monthly EM&A Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep1402002cv200703.html
|
|
|
|
|
- Sham Shui Po
District
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Apr
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17)(Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Sep 2017 to Nov 2017)
(DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Jan 2018 to Mar
2018)(Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (May 2018)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2018)
(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building, Radar
Station and Hong Kong Aviation Club) of the Former Kai Tak
Airport
|
Monthly EM&A Report (Apr 2018)
(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Apr 2018)
(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Apr 2018)
(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Yau
Tsim Mong District
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover
Serving the West Kowloon Cultural District
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving
the West Kowloon Cultural District
|
Quarterly EM&A Report (Feb 2018 to Apr
2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West
Kowloon Reclamation Development Phase 1
|
Monthly EM&A Report (Mar 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West
Kowloon Reclamation Development Phase 1
|
Monthly EM&A Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (May 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Monthly EM&A Report (May
2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Apr 2018)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (Apr 2018)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping Station and Dry Weather Flow Interceptor
at Cherry Street Box Culvert
|
Submission of Monthly EM&A Report No.4
|
http://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.1 (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.2 (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report No.3 (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.1 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.2 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report No.3 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.1 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.2 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report No.3 (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|