Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
|
(for the period between 16 May 2020
to 15 June
2020)
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
ESB-329/2020
|
Tung
Chung Line Extension
|
Study Brief
|
https://www.epd.gov.hk/eia/register/study/latest/esb-329.pdf
|
|
|
|
ESB-331/2020
|
Re-provision
of Open Cycle Gas Turbines at Lamma Power Station
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/esb331/esb331.pdf
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
DIR-274/2020
|
Drainage Improvement Works at Shek Kiu Tau
|
Project Profile
|
https://www.epd.gov.hk/eia/register/profile/latest/dir274/dir274.pdf
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
EIA-261/2020
|
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road
|
EIA Reports Approved
|
https://www.epd.gov.hk/eia/register/report/conditions/aeiar2612019.pdf
|
|
|
|
Application
for Environmental Permit
|
|
|
|
AEP-575/2020
|
H2H Express Submarine Cable
|
Environmental Permit issued (EP-575/2020)
|
https://www.epd.gov.hk/eia/register/permit/latest/ep5752020.htm
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
VEP-576/2020
|
Submarine Cable for the Development of the
Integrated Waste Management Facilities Phase 1
|
Environmental Permit issued (FEP-02/429/2012/B)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5762020.htm
|
|
|
|
VEP-577/2020
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Environmental Permit issued (EP-210/2005/D)
|
https://www.epd.gov.hk/eia/register/permit/latest/vep5772020.htm
|
|
Application
for Further Environmental Permit
|
|
|
|
FEP-198/2020
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Environmental Permit issued (FEP-03/376/2009)
|
https://www.epd.gov.hk/eia/register/permit/latest/fep1982020.htm
|
|
|
|
FEP-199/2020
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Environmental Permit issued (FEP-13/364/2009/H)
|
https://www.epd.gov.hk/eia/register/permit/latest/fep1992020.htm
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
EP-312/2008/A
|
Disposal of
Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha Chau
|
Monthly Progress
Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary Control Point
and Associated Works
|
Ecological
Monitoring Report for the Woodland Compensation Area (Mar to Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West Kowloon
|
Landscape
Plan
|
https://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
As-bulit Drawings of Mitigating Landscape and Visual
Impacts
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly
Operational Airborne Rail Noise Monitoring Report (Festival City)No.3
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
EP-210/2005/D
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Second
Annual Air Quality Impact Assessment Review
|
https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html
|
|
|
|
EP-313/2008/K
|
West Island Line
|
West
Island Line Audit Report for Compensatory Trees – supplementary paper
|
https://www.epd.gov.hk/eia/english/register/index8/vep5502018_content.html
|
|
|
|
EP-454/2013
|
Reprovisioning
of FEHD Sai Yee Street Vehicle Depot at Yen Ming
Road, West Kowloon Reclamation Area
|
Submission
of Environmental Impact Monitoring Report(Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html
|
|
|
|
EP-507/2016/C
|
Installation of One Additional Gas-fired
Generation Unit (CCGT Unit No.2) at the Black Point Power Station
|
Effluent
Discharge Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai Chi Yuen Cemetery Extension
|
Baseline Monitoring
Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
EP-489/2014
|
Expansion of Hong
Kong International Airport into a Three-Runway System
|
Management
Organisations(May 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
FEP-01/381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Operation
Phase Second Odour Impact Monitoring Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1812018_content.html
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling
|
Waste
Management Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html
|
|
|
|
EP-226/2005/F
|
Development of an
EcoPark in Tuen Mun Area 38
|
Technical
proposal (Jan 2020 to May 2022)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5482018_content.html
|
|
|
|
EP-539/2017
|
Pacific Light
Cable Network (PLCN)– Deep Water Bay
|
As-Built
Plans Submission
|
https://www.epd.gov.hk/eia/english/register/aep/ep5392017_content.html
|
|
|
|
EP-539/2017
|
Pacific Light
Cable Network (PLCN)– Deep Water Bay
|
As-Built
Plans Submission(2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5392017_content.html
|
|
|
|
EP-507/2016/C
|
Installation of
One additional gas-fired generation unit (CCGT Unit No. 1) at the Black
Point Power Station
|
Vessel
Control Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html
|
|
|
|
FEP-01/247/2006/B
|
Development of a
Grease Trap Waste Treatment Facility at West Kowloon Transfer Station
|
Operation
Plan(Jun 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5712019_content.html
|
|
|
|
EP-129/2002/F
|
Sheung Shui to Lok Ma Chau Spur Line
|
East Rail
Extensions LCC-202 West Section alignment and Associated Works - Final EM
& A Report
|
https://www.epd.gov.hk/eia/english/register/index8/vep2032019_content.html
|
|
|
|
FEP-02/034/2000
|
West Rail Contract
No. CC402 Construction and Widening of Road P1; Improvement Works and Road
Reconstruction at Sham Wong Roade
|
Revised Final
Report Version 2 (Sep 2002)
|
https://www.epd.gov.hk/eia/english/register/index7/fep0202000_content.html
|
|
|
|
EP-453/2013/A
|
Underpass Road
and Austin Road Flyover Serving the West Kowloon Cultural District
|
Construction and
Demolition Material Management Plan
|
https://www.epd.gov.hk/eia/english/register/index8/vep4252014_content.html
|
|
|
|
EP-222/2005
|
Improvement
Works to Tung Ping Chau Public Pier
|
Environmental
Monitoring and Audit (EM&A) Programme
|
https://www.epd.gov.hk/eia/english/register/aep/ep2222005_content.html
|
|
|
|
EP-222/2005
|
Improvement
Works to Tung Ping Chau Public Pier
|
Report on Coral
Translocation and Baseline Survey at Tung Ping Chau
|
https://www.epd.gov.hk/eia/english/register/aep/ep2222005_content.html
|
|
|
|
EP-222/2005
|
Improvement
Works to Tung Ping Chau Public Pier
|
Final Monitoring
Coral Report for the Tung Ping Chau Public Pier
|
https://www.epd.gov.hk/eia/english/register/aep/ep2222005_content.html
|
|
|
|
EP-517/2017/A
|
Expansion of Sha Tau Kok Sewage Treatment
Works
|
Proposal for
Changes of the Environmental Monitoring Methodology and Requirement (Operation
Phase of Odour Monitoring)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon
Route - Kai Tak West
|
Construction
Noise Mitigation Measures Plan (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon
Route - Yau Ma Tei East
|
Construction
Noise Mitigation Measures Plan (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
- Island District
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
176th Monthly EM&A Report (12 Apr 2020
to 11 May 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Apr 2020)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Apr 2020) (HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Mar 2020) (HY/2019/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Apr 2019)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Apr 2020)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit Report Unit
L10& L11 (Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly EM&A Report (Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part &
remaining part)
|
Monthly Environmental Monitoring and Audit Report (No.
177)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Fifty-ninth Monthly
EM&A Report(Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Sixtieth Monthly
EM&A Report(May 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.22
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
6th Quarterly EM&A Report(Rev.B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.22(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7)
into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Apr
2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Twenty-fifth Quarterly Environmental
Monitoring and Audit Report (HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2020)(HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
7th Quarterly EM&A Report (Dec 2019 to
Feb 2020) (HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Dec 2019 to Mar 2020)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2020)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-489/2014
|
Expansion of
Hong Kong International Airport into a Three-Runway System
|
Construction
Phase Monthly EM&A Report No.52
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
EP-489/2014
|
Expansion of
Hong Kong International Airport into a Three-Runway System
|
Quarterly
EM&A Report No.17 (Jan to Mar 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
EP-519/2016
|
Tung Chung New
Town Extension
|
Monthly EM&A
Report(Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
EP-519/2016
|
Tung Chung New
Town Extension
|
Monthly EM&A
Report(Mar 2020)(Revision 1)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5192016_content.html
|
|
|
|
EP-532/2017/A
|
Mui Wo Lai Chi Yuen Cemetery Extension
|
Monthly EM&A
Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html
|
|
|
|
EP-535/2017
|
Improvement
Dredging for Lamma Power Station Navigation
Channel
|
Monthly EM&A
Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html
|
|
|
|
EP-426/2011
|
Providing
Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel
|
Quarterly
Environmental Monitoring & Audit Report (Sep 2019 to Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4262011_content.html
|
|
|
|
EP-312/2008/A
|
Disposal of
Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha Chau
|
Quarterly
EM&A Report (Jan to Mar 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
- North District
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Monthly EM&A Report(Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
FEP-02/474/2013
|
Shek Wu Hui Effluent Polishing Plant
|
Quarterly EM&A Report(Dec 2019 to Mar
2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html
|
|
|
|
EP-534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge
Cemetery
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
FEP-01/460/2013
|
Development of
Organic Waste Treatment Facilities, Phase 2
|
Baseline
Environmental Monitoring and Audit Report – Background Noise
|
https://www.epd.gov.hk/eia/english/register/index7/fep1912019_content.html
|
|
|
|
FEP-01/460/2013
|
Development of Organic
Waste Treatment Facilities, Phase 2
|
Monthly
EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1912019_content.html
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Monthly EM&A Report (Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Quarterly EM&A Report (Feb 2020 to Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
EP-517/2017/A
|
Expansion of Sha Tau Kok Sewage Treatment Works
|
Monthly EM&A Report(Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
EP-517/2017/A
|
Expansion of Sha Tau Kok Sewage Treatment Works
|
Monthly EM&A Report(May 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Final EM&A Review Report (Nov 2009 - Sep 2014)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Apr 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Apr 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (May 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Feb 2019 - Apr 2020)
(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Monthly EM&A Report (Mar 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment
Works
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
onthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report (Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report (Dec 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report (Jan 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Monthly EM&A Report (Apr 2020)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report
(Apr 2020)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Quarterly EM&A
Report (Feb 2020 to Apr 2020)(YL/2015/01)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang
/ Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report
(Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
- Sai Kung
District
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report(Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
FEP-01/503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly EM&A Report (Apr 2020) (V.1)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
EP-503/2015/A
|
Desalination Plant at Tseung
Kwan O
|
21st Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Mar 2020)(revised)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Quarterly EM&A Report (Sep 2019 to Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
3rd Quarterly EM&A Report (Jun 2019 to Aug 2019)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Quarterly EM&A Report (Dec 2019 to Feb 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Quarterly EM&A Report (Jan 2020 to Mar 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
FEP-01/308/2008/B
|
South-East New Territories Landfill Extension
|
Monthly EM&A Report No.16 (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
EP-134/2002/M
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly Environmental Monitoring and Audit Report (Mar
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5532018_content.html
|
|
|
|
EP-134/2002/M
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly Environmental Monitoring and Audit Report (Apr
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5532018_content.html
|
|
|
|
EP-134/2002/M
|
Fill Bank at Tseung Kwan O Area
137
|
Quarterly Environmental Monitoring and Audit Report (Feb
2020 - Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5532018_content.html
|
|
|
|
- Sha Tin
District
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of
Sha Tin Water Treatment Works - South Works
|
Monthly EM&A Report No.50
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
EP-463/2013/B
|
Widening and Reconstruction of Tai Po Road (Sha Tin Section)
|
Quarterly EM&A Report (Sep 2019 to Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html
|
|
|
|
EP-533/2017
|
Sha Tin Cavern Sewage Treatment Works
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html
|
|
|
|
EP-345/2009
|
Inter-reservoirs Transfer Scheme (IRTS) - Water Tunnel
between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir
|
10th Monthly EM&A Report(Rev.2)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3452009_content.html
|
|
|
|
EP-345/2009
|
Inter-reservoirs Transfer Scheme (IRTS) - Water
Tunnel between Kowloon Byewash Reservoir and
Lower Shing Mun
Reservoir
|
10th Monthly EM&A Report(Rev.0)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3452009_content.html
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
- Tai Po District
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Monthly EM&A Report(Feb 2020) (CV/2012/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Monthly EM&A Report(Mar 2020) (CV/2012/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Monthly EM&A Report(Apr 2020) (CV/2012/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
EP-388/2010
|
Development of a Bathing Beach at Lung Mei, Tai Po
|
Monthly EM&A Report(Apr 2020) (CV/2012/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Final EM&A Review Report (Nov 2009 - Sep 2014)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Apr 2020)(CV/2012/09)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Apr 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (May 2020)(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
EP-324/2008/E
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Feb 2019 - Apr 2020)
(HY/2012/06)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html
|
|
|
|
EP-470/2013
|
NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment
Works
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report (Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report (Dec 2019)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
EP-475/2013/A
|
Reprovision of temporary Wholesale Market in Fanling
North New Development Area
|
Monthly EM&A Report (Jan 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html
|
|
|
|
- Tsuen Wan
District
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Monthly Environmental Monitoring And Audit
Report (Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
EP-076/2000
|
Upgrading of Siu
Ho Wan Sewage Treatment Plant
|
Quarterly Environmental Monitoring And
Audit Report (Feb 2020 to Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/10)(Apr
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DE/2018/17)(Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan 2020 to Mar
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jan 2020 to Mar
2020)(DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-489/2014
|
Expansion of Hong
Kong International Airport into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.52
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
EP-489/2014
|
Expansion of
Hong Kong International Airport into a Three-Runway System
|
Quarterly EM&A Report No.17 (Jan to Mar
2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Fifty-ninth
Monthly EM&A Report(Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste
Treatment Facilities, Phase I
|
Sixtieth
Monthly EM&A Report(May 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
EP-426/2011
|
Providing Sufficient
Water Depth for Kwai Tsing
Container Basin and its Approach Channel
|
Quarterly Environmental Monitoring &
Audit Report (Sep 2019 to Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4262011_content.html
|
|
|
|
- Tuen Mun District
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Twenty-fifth Quarterly Environmental
Monitoring and Audit Report (HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2020)(HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
7th Quarterly EM&A Report (Dec 2019 to
Feb 2020) (HY/2017/10)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Dec 2019 to Mar 2020)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek
Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Apr 2020)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.22
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
6th Quarterly EM&A Report(Rev.B)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
EP-429/2012/A
FEP-01/429/2012/A
|
Development of the Integrated Waste Management Facilities
Phase 1
|
Monthly EM&A Report No.22(Rev A)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html
|
|
|
|
FEP-02/507/2016/B
|
Additional Gas-fired Generation units Project -
Installation of one additional gas-fired generation unit (CCGT Unit No. 1)
at the Black Point Power Station
|
Monthly EM&A Report no.41
|
https://www.epd.gov.hk/eia/english/register/index8/vep5522018_content.html
|
|
|
|
EP-507/2016/B
|
Installation of One additional gas-fired generation unit (CCGT
Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.41
|
https://www.epd.gov.hk/eia/english/register/index8/vep5512018_content.html
|
|
|
|
EP-534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html
|
|
|
|
EP-534/2017/A
|
Site Formation and Associated Infrastructural Works
for Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html
|
|
|
|
FEP-01/534/2017
|
Site Formation and Associated Infrastructural Works for
Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html
|
|
|
|
FEP-01/534/2017/A
|
Site Formation and Associated Infrastructural Works
for Development of Columbarium, Crematorium and Related Facilities at Sandy
Ridge Cemetery
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html
|
|
|
|
EP-441/2012/A
|
Enhanced Ash Utilisation and
Water Management Facilities at the Castle Peak Power Station (CPPS)
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Construction Phase Monthly EM&A Report
No.52
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Quarterly EM&A Report No.17 (Jan to Mar
2020)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
EP-210/2005/C
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5452018_content.html
|
|
|
|
EP-210/2005/C
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Mar 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5452018_content.html
|
|
|
|
EP-210/2005/C
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Quarterly EM&A Report (Feb 2020 to Apr
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5452018_content.html
|
|
|
|
- Yuen Long District
|
|
|
|
EP-477/2013
|
Development of Lok Ma Chau Loop
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Feb 2020 to Apr
2020)(YL/2015/01)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Monthly EM&A Report (Apr 2020)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Apr 2020)(Version 1.0)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Feb 2020 to Apr 2020)(YL/2015/01)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang
/ Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
- Kwai Tsing District
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/10)(Apr
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DE/2018/17)(Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan 2020 to Mar
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jan 2020 to Mar
2020)(DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai
Tsing Container Basin and its Approach Channel
|
Monthly Environmental Monitoring & Audit Report (Apr
2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
|
EP-426/2011
|
Providing Sufficient Water Depth for Kwai
Tsing Container Basin and its Approach Channel
|
Quarterly Environmental Monitoring & Audit Report
(Sep 2019 to Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4262011_content.html
|
|
|
|
- Central & Western District
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Apr 2020) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Feb 2020 to Apr 2020)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
EP-364/2009/G
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2019 to Feb 2020) (HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5652019_content.html
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A Report (Dec 2019 to Feb 2020)
(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2019 to Feb 2020)
(HK/2019/18)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Apr 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Apr 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Apr 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Apr 2020)(HY/2019/18)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Quarterly
EM&A Report (Dec 2019 to Feb 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly
EM&A Report (Dec 2019 to Feb 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly
EM&A Report (Dec 2019 to Feb 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly
EM&A Report (Dec 2019 to Feb 2020)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/10)(Apr
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DE/2018/17)(Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan 2020 to Mar
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jan 2020 to Mar
2020)(DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report(Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Quarterly EM&A Report (Sep 2019 to Nov
2019)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
3rd Quarterly EM&A Report (Jun 2019 to
Aug 2019)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
EP-459/2013
|
Cross Bay Link, Tseung Kwan O
|
Quarterly EM&A Report (Dec 2019 to Feb
2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4592013_content.html
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Apr 2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Feb 2020 to Apr
2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Apr 2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Feb 2020 to Apr
2020)(HK/2015/01)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
- Southern District
|
|
|
|
EP-487/2014/A
|
Tai Shue Wan
Development at Ocean Park
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/10)(Apr
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DE/2018/17)(Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan 2020 to Mar
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jan 2020 to Mar
2020)(DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-537/2017
|
Proposed Extension of Academic Block, The Swire Institute
of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O
|
Monthly EM&A Report No.31
|
http://www.epd.gov.hk/eia/8english/register/aep/ep5372017_content.html
|
|
|
|
EP-426/2011
|
Providing Sufficient Water Depth for Kwai
Tsing Container Basin and its Approach Channel
|
Quarterly Environmental Monitoring & Audit Report
(Sep 2019 to Nov 2019)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4262011_content.html
|
|
|
|
- Kowloon City District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2020)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Apr
2020)(KL/2012/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Apr
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Apr
2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Apr
2020)(ED/2018/04)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
EP-445/2013
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Apr 2020) (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4452012_content.html
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Apr 2020)(KL/2014/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A
& D4A
|
Monthly EM&A Report (Apr 2020) (ED/2018/01)
|
https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2014/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2014/20)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2018/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2018/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
- Kwun Tong
District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Apr
2020)(KL/2012/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Apr 2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report(Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Mar 2020)(revised)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
EP-513/2016
|
Development of Anderson Road Quarry site - Road
Improvement Works
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2014/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
- Sham Shui Po
District
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/10)(Apr
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DE/2018/17)(Apr 2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/10)(Jan 2020 to Mar
2020)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jan 2020 to Mar
2020)(DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
- Wong Tai Sin District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2016/05)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2020)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr
2020)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Apr 2020)
(ED/2018/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Apr
2020)(KL/2012/03)
|
https://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Apr 2020)(KL/2014/03)
|
https://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
EP-544/2017
|
Kai Tak Sports Park
|
EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html
|
|
|
|
- Yau
Tsim Mong District
|
|
|
|
EP-436/2012/F
|
Shatin to Central Link - Hung Hom to
Admiralty Section
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5562018_content.html
|
|
|
|
EP-437/2012/A
|
Shatin to Central Link - Mong Kok East to Hung Hom Section
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5352017_content.html
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover Serving the West
Kowloon Cultural District
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Monthly EM&A Report (Apr 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Monthly EM&A Report (May 2020)
|
https://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2014/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2014/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
EP-457/2013/C
|
Central Kowloon Route
|
Monthly EM&A Report (Apr 2020) (HY/2018/08)
|
https://www.epd.gov.hk/eia/english/register/index8/vep5172016_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-01/457/2013/C
|
Central Kowloon Route - Kai Tak
West
|
Monthly EM&A Report (Apr 2020) (HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1822018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2014/08)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2014/07)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2014/20)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
FEP-02/457/2013/C
|
Central Kowloon Route - Yau Ma Tei East
|
Monthly EM&A Report (Apr 2020) (HY/2018/02)
|
https://www.epd.gov.hk/eia/english/register/index7/fep1832018_content.html
|
|
|
|
EP-523/2016
|
Proposed Sewage Pumping Station and Dry Weather Flow
Interceptor at Cherry Street Box Culvert
|
Submission of Monthly EM&A Report No.28
|
https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|