Monthly
Update of Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the
period between 16 February 2013 to 15 March
2013)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
ESB-257/2013
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and Related
Facilities at Sandy
Ridge Cemetery
|
Project
Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb257/esb257.pdf
|
|
|
|
ESB-258/2013
|
Port Shelter Sewerage, Stage3 -
Sewerage Works at Po Toi O
|
Project
Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb258/esb258.pdf
|
|
|
|
ESB-259/2013
|
Pyrolysis Plant at EcoPark
|
Project
Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb259/esb259.pdf
|
|
|
|
ESB-256/2013
|
New Wang Tong
River Bridge
|
EIA
Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-256.pdf
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
DIR-227/2013
|
Improvement
of Yuen Long Town
Nullah (Town Centre Section)
|
Project
Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir227/dir227.pdf
|
|
|
|
DIR-224/2013
|
Decommissioning
of the Magazine Site at Victoria
Road for West Island
Line
|
Decision
of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2242013.htm
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
EIA-206/2013
|
Drainage
Improvement Works at Ngong Ping
|
EIA
Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2062012/index.html
|
|
|
|
EIA-207/2013
|
Kai
Tak Development – Roads D3A
& D4A
|
EIA
Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2072012/index.html
|
|
|
|
Application
for Environmental Permit
|
|
|
|
Nil
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
VEP-391/2013
|
Development of a Biodiesel Plant
at Tseung Kwan O Industrial Estate
|
Environmental Permit issued
(EP-319/2009/C)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3912013.htm
|
|
|
|
VEP-392/2013
|
Cement Silos addition works in
Tai Po Cement Depot
|
Environmental Permit issued
(EP-169/2003/B )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3922013.htm
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
FEP-144/2013
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel
Work
|
Environmental Permit issued
(FEP-09/364/2009/B)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1442013.htm
|
|
|
|
FEP-145/2013
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine
Work
|
Environmental Permit issued
(FEP-06/356/2009)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1452013.htm
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Sixth
Weekly Site Inspection Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Fourth Weekly
Site Inspection Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
|
EP-436/2012
|
Shatin to Central Link - Hung Hom to Admiralty Section
|
Contamination
Assessment Plan
|
http://www.epd.gov.hk/eia/english/register/aep/ep4362012_content.html
|
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and Associated
Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
8th Coral
Impact report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and Associated
Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
9th Coral
Impact report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and Associated
Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
10th Coral
Impact report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
|
EP-438/2012/B
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Transplantation
Proposal for Plant Species of Conservation Importance
|
http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html
|
|
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Baseline
Ground - borne Noise Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin and Tai Po
|
Review Note
No.2 for Landscape Plan(Rev.3)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
13th Weekly
Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
14th Weekly
Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
15th Weekly
Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
16th Weekly
Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
17th Weekly
Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
Post
Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Proposal
for Alternative Construction Dust Monitoring Location CD2a and Construction Noise Monitoring
Location CN4a
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area 137
|
Baseline Water Quality Monitoring
Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
- Island District
|
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (Oct
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Monthly EM&A Report (No. 27)
(Oct 2012) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
86th Monthly EM&A Report (12 Oct to 11 Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part
& remaining part)
|
Monthly Environmental Monitoring and Audit Report (No. 87)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
EP-312/2008/A
|
Disposal of Contaminated Sediment - Dredging,
Management and Capping of sediment Disposal Facility at Sha Chau
|
38th Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5
& GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring
And Audit Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma
Extension
|
Monthly Environmental Monitoring
and Audit Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue
Gas Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jul to
Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jul to
Sep 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
EP-281/2007/A
|
Outlying Islands
Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and
Disposal Facilities
|
Quarterly EM&A Report (Aug
2012 to Oct 2012) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
|
- North District
|
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop
Shek Crematorium
|
Monthly EM&A Report
(Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop
Shek Crematorium
|
Quarterly EM&A Report (Aug -
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary
Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road
(Section 2 Lok Ma Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental Monitoring
and Audit Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
- Sai Kung District
|
|
|
|
FEP-01/410/2010
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1272011_content.html
|
|
|
|
FEP-02/410/2010
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1372012_content.html
|
|
|
|
EP-319/2009/A
|
Development of a Biodiesel Plant at Tseung Kwan
O Industrial Estate
|
Monthly Environmental Monitoring
& Audit Report (Nov 2012) (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
|
EP-319/2009/A
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Quarterly Environmental
Monitoring & Audit Report (Sep to Nov 2012) (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
|
EP-397/2010
|
Renewable Energy Supply on Town Island
(also known as Dawn
Island)
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3972010_content.html
|
|
|
|
FEP-01/428/2011/A
|
Drainage Diversion Works For the
Comprehensive Residential Development At Various Lots In DD227 & DD229,
Tai Po Tsai, Sai Kung
|
Monthly EM&A Report (Oct
2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1352012_content.html
|
|
|
|
EP-319/2009/A
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly Environmental Monitoring
& Audit Report (Oct 2012) (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html
|
|
|
|
- Sha Tin District
|
|
|
|
EP-438/2012/B
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html
|
|
|
|
- Tai Po District
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Oct
2012) (DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Oct
2012) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B
|
Monthly Environmental and Audit
Report (Oct 2012) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B
|
Monthly Environmental and Audit
Report (Oct 2012) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in
Upper Tai Po River
|
Monthly EM&A Report (Sep 2012) (DC/2007/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Revised Monthly Environmental and
Audit Report (Oct 2012) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental Monitoring
and Audit Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
-
Tsuen Wan District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Aug to Oct 2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan and Kwai
Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
|
-
Tuen Mun District
|
|
|
|
EP-321/2008
|
Upgrading of Pillar Point Sewage
Treatment Works
|
Monthly EM&A Report (Oct
2012) No.24
|
http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html
|
|
|
|
FEP-01/334/2009/B
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3652012_content.html
|
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Quarterly EM&A Report (Aug to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
|
EP-321/2008
|
Upgrading of Pillar Point Sewage
Treatment Works
|
Monthly EM&A Report (Nov
2012) No.25
|
http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html
|
|
|
|
EP-210/2005/A
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Monthly Environmental Monitoring
and Audit Report (CV/2009/02) (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
|
EP-210/2005/A
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Monthly Environmental Monitoring
and Audit Report (CV/2009/02) (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
|
- Yuen Long District
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary
Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A Report (Oct
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
FEP-02/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 2 Lok Ma
Chau Control Point to Ng Tung River)
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3162010_content.html
|
|
|
|
- Kwai Tsing District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct 2012)
(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Aug to Oct 2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan and Kwai
Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
|
- Central & Western District
|
|
|
|
EP-408/2011/B
|
Central Police Station
Conservation and Revitalisation Project
|
Monthly EM&A Report (No.12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Monthly EM&A Report (Oct
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
EP-313/2008/E
|
West Island Line
|
EM&A Report No.39
|
http://www.epd.gov.hk/eia/english/register/index8/vep3722012_content.html
|
|
|
|
EP-273/2007
|
Laying of Western
Cross Harbour
Main and Associated Land Mains from West Kowloon
to Sai Ying Pun
|
Quarterly EM&A Report (Aug to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Aug to Oct 2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and
Revitalisation Project
|
4th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.16)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and
Revitalisation Project
|
Monthly EM&A Report (No.12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and
Revitalisation Project
|
Monthly EM&A Report (No.13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
- Wan Chai District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.16)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Monthly EM&A Report (Oct
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Aug to Oct 2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report No.12
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
- Eastern District
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Monthly EM&A Report (Oct
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson
Crematorium
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson
Crematorium
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Aug to Oct 2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report No.12
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
|
EP-442/2012
|
EMSD Hong Kong
Workshop at Sheung On Street, Chai Wan
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html
|
|
|
|
- Southern District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.16)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Aug to Oct 2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
|
EP-407/2010/B
|
South
Island Line (East)
|
Monthly EM&A Report No.17
|
http://www.epd.gov.hk/eia/english/register/index8/vep3842012_content.html
|
|
|
|
- Kowloon City District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Quarterly EM&A Report(Aug to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly EM&A Report(Aug to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-438/2012/B
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html
|
|
|
EP-285/2008
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
Final Environmental Monitoring
and Audit Summary Report (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2852008_content.html
|
|
|
EP-285/2008
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
Final Environmental Monitoring
and Audit Report (Feb to May
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2852008_content.html
|
|
|
- Kwun Tong District
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving
Kai Tak Development
|
Monthly EM&A Report(Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Quarterly EM&A Report(Aug to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly EM&A Report(Aug to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
EP-285/2008
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
Final Environmental Monitoring
and Audit Summary Report (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2852008_content.html
|
|
EP-285/2008
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
Final Environmental Monitoring
and Audit Report (Feb to May
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2852008_content.html
|
|
|
- Sham Shui Po District
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Aug to Oct 2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/23, DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Oct
2012) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Wong Tai Sin District
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Quarterly EM&A Report(Aug to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Quarterly EM&A Report(Aug to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-438/2012/B
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html
|
|
|
EP-285/2008
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
Final Environmental Monitoring
and Audit Summary Report (Version 1.0)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2852008_content.html
|
|
|
EP-285/2008
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
Final Environmental Monitoring
and Audit Report (Feb to May
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2852008_content.html
|
|
|
- Yau Tsim Mong District
|
|
|
EP-273/2007
|
Laying of Western
Cross Harbour
Main and Associated Land Mains from West Kowloon
to Sai Ying Pun
|
Quarterly EM&A Report (Aug to
Oct 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T
in West Kowloon
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-366/2009/A
|
Road Works at West
Kowloon
|
Monthly EM&A Report (Nov 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-438/2012/B
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html
|
|
|
EP-349/2009/I
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Nov
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html
|
|
|
|
|
|
|
|
|
|
|