Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the
period between 16 Feb
2014
to 15 Mar
2014)
|
|
|
Application No. / Permit
No.
|
Project Title
|
Document Name
|
Hyperlink
|
|
|
Application for EIA Study
Brief
|
|
|
ESB-267/2014
|
Chai Wan Government Complex and Vehicle
Depot
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-267.pdf
|
|
|
ESB-268/2014
|
Development of Anderson Road Quarry
site - Road Improvement Works
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-268.pdf
|
|
|
ESB-269/2014
|
Development of Anderson Road Quarry
site - Rock Cavern Developments
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-269.pdf
|
|
|
ESB-270/2014
|
Planning and Engineering Study
on Future Land Use at Ex-Lamma Quarry Area at Sok Kwu Wan, Lamma Island -
Feasibility Study
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb270/esb270.pdf
|
|
|
ESB-271/2014
|
Site Formation and Associated
Infrastructural Works for Development of Columbarium, Crematorium and
Related Facilities at Sandy
Ridge Cemetery
- March 2014
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb271/esb271.pdf
|
|
|
Application for
Permission to Apply Directly for Environmental Permit
|
|
|
Nil
|
|
|
Application for Approval
of EIA Report
|
|
|
Nil
|
|
|
Application for
Environmental Permit
|
|
|
AEP-485/2014
|
Asia Pacific Gateway (APG) - Tseung Kwan O
|
Environmental Permit issued
(EP-485/2014)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4852014.htm
|
|
|
AEP-486/2014
|
Reuse of
Treated Wastewater for Cooling
Tower make up in Planned
Food Factory at No. 3 Dai Shun Street Tai Po Industrial Estate
|
Environmental Permit issued
(EP-486/2014)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4862014.htm
|
|
|
Application for Variation
of an Environmental Permit
|
|
|
Nil
|
|
|
Application for Further
Environmental Permit
|
|
|
Nil
|
|
|
Submission as required by
Environmental Permit Condition - Design / Environmental Submissions
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Proposal for Termination
of TSP Monitoring at CD6a
Harbourfront Horizon
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Third Weekly Site
Inspection Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Seventh Weekly Site
Inspection Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
Second Weekly Impact
Water Quality Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link -
Tai Wai to Hung Hom Section
|
Construction Noise
Mitigation Measures Plan (CNMMP)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link -
Tai Wai to Hung Hom Section
|
Continuous Noise
Monitoring Plan (CNMP)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen
Sewage Pumping Station
|
Landscape and Visual
Impact Monitoring (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen
Sewage Pumping Station
|
Landscape and Visual
Impact Monitoring (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
EP-313/2008/H
|
West Island
Line
|
Archaeological Watching Brief
Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep4222013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Noise Management Plan
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
Submission as required by
Environmental Permit Condition - EM&A Reports
|
|
|
|
Island
District
|
Central
& Western District
|
|
|
|
|
North
District
|
Wan Chai
District
|
|
|
|
|
Sai Kung
District
|
Eastern
District
|
|
|
|
|
Sha Tin
District
|
Southern
District
|
|
|
|
|
Tai Po
District
|
Kowloon
City District
|
|
|
|
|
Tsuen Wan
District
|
Kwun
Tong District
|
|
|
|
|
Tuen Mun
District
|
Sham Shui
Po District
|
|
|
|
|
Yuen Long
District
|
Wong Tai
Sin District
|
|
|
|
|
Kwai Tsing
District
|
Yau Tsim
Mong District
|
|
|
|
-
Island District
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental
Monitoring and Audit Report (No. 99)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5
Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jul
to Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Jul
to Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines
(GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental
Monitoring And Audit Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai - Macao
Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Nov
2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Nov
2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station
at Lamma Extension
|
Monthly Environmental
Monitoring and Audit Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report (Nov
2013)(HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report (Nov
2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental
Monitoring & Audit Report (Oct 2013) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
FEP-01/059/2000
|
The Theme Park at Penny's Bay,
Lantau
|
Monthly Environmental
Monitoring and Audit Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0292000.html
|
|
|
EP-427/2011/A
|
Dredging, Management and
Capping of Contaminated Sediment Disposal Facility to the South of The
Brothers
|
Monthly Progress Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
-
North District
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Oct
2013)(DC/2011/06)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Oct
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River
Stage IV
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Monthly EM&A Report (Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in
Northern New Territories - Package C
|
Monthly EM&A Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Quarterly EM&A Report (Aug
2013 to Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-329/2009
|
Provision of Cremators at Wo
Hop Shek Crematorium
|
Quarterly EM&A Report (Aug
- Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Nov
2013) (Stage 1)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly Environmental
Monitoring and Audit Report (Aug to Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental Monitoring
and Audit Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental
Monitoring and Audit Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
-
Sai Kung District
|
|
|
EP-435/2011
|
Sewerage Works at Pik Shui Sun
Tsuen
|
Monthly
EM&A Report (Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html
|
|
|
EP-435/2011
|
Sewerage Works at Pik Shui Sun
Tsuen
|
Monthly EM&A Report (Feb
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html
|
|
|
FEP-02/428/2011/A
|
Drainage Diversion Works For the
Comprehensive Residential Development At Various Lots In DD227 & DD229,
Tai Po Tsai, Sai Kung
|
14th Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html
|
|
|
FEP-02/428/2011/A
|
Drainage Diversion Works For
the Comprehensive Residential Development At Various Lots In DD227 &
DD229, Tai Po Tsai, Sai Kung
|
15th Monthly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.14
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.15
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-410/2010
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Monthly EM&A
Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4102010_content.html
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly EM&A
Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-397/2010
|
Renewable Energy Supply on Town Island
(also known as Dawn
Island)
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3972010_content.html
|
|
|
EP-435/2011
|
Sewerage Works at Pik Shui Sun
Tsuen
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html
|
|
|
EP-410/2010/A
|
Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai
Kung Outdoor Training Camp
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3962013_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
10th Weekly Site Inspection
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
-
Sha Tin District
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.14
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.15
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
-
Tai Po District
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Nov 2013) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit
Report (Nov 2013) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Oct
2013) (DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (Nov 2013) (DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-223/2005/A
|
Drainage Improvement Works in
Upper Tai Po River
|
Monthly EM&A Report (Oct
2013) (DC/2007/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-419/2011/A
|
Sediment Removal at Yim Tin Tsai
(East) Fish Culture Zone
|
Monthly Environmental
Monitoring and Audit Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3562012_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly Environmental
Monitoring and Audit Report (Aug to Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental
Monitoring and Audit Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly Environmental
Monitoring and Audit Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
- Tsuen Wan District
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Aug
to Oct 2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
FEP-01/059/2000
|
The Theme Park at Penny's Bay,
Lantau
|
Monthly Environmental
Monitoring and Audit Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0292000.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
- Tuen Mun District
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point
Sewage Treatment Works
|
Quarterly EM&A Report (Aug
to Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point Sewage
Treatment Works
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point
Sewage Treatment Works
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-334/2009
|
Sludge Treatment Facilities
|
Monthly EM&A Report (Nov
2013) (EP/SP/58/08)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3342009_content.html
|
|
|
EP-334/2009
|
Sludge Treatment Facilities
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3342009_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-354/2009/A
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Nov
2013)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep3312012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Quarterly EM&A Report (Aug
2013 to Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road, Tuen Mun
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
-
Yuen Long District
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary Boundary
Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 3)
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary
Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road
(Section 3)
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A Report (Oct
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping
Station
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Quarterly EM&A Report (Sep
to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
-
Kwai Tsing District
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Aug
to Oct 2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
-
Central & Western District
|
|
|
EP-356/2009
|
Wan Chai Development Phase
II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central - Wan
Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass - Tunnel
(Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine
Works
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central - Wan
Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Aug
to Oct 2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Dec
2013) No.29
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Jan
2014) No.30
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and
Revitalisation Project
|
Monthly EM&A Report (No.25)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Quarterly EM&A Report (Jul
to Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Oct
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
     Â
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
     Â
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Nov
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-286/2007/B
|
The Expansion of Heliport Facilities at Macau Ferry Terminal
|
Monthly EM&A Report No.27
|
http://www.epd.gov.hk/eia/english/register/index8/vep2802008_content.html
|
|
|
-
Wan Chai District
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central - Wan
Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass - Tunnel
(Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine
Works
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Aug
to Oct 2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Quarterly EM&A Report (Jul
to Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Oct
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
     Â
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
     Â
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Nov
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link
Protection Works at Causeway
Bay Typhoon Shelter
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Dec
2013) No.29
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Jan
2014) No.30
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
-
Eastern District
|
|
|
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central - Wan
Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai Development
Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II -
Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) -
Marine Work
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central -
Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Aug
to Oct 2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link
Protection Works at Causeway
Bay Typhoon Shelter
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
FEP-01/272/2007/B
|
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage
Tunnel
|
Quarterly EM&A Report (Jul
to Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
5th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
6th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
18th Monthly EM&A Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Oct
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai Bypass (CWB) including its
road tunnel and slip roads
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
     Â
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
     Â
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jan
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Nov
2013 to Jan 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of Cape Collinson
Crematorium
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
10th Weekly Site Inspection
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
EP-442/2012
|
EMSD Hong Kong
Workshop at Sheung On Street, Chai Wan
|
Monthly EM&A Report (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html
|
|
|
-
Southern District
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Aug
to Oct 2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Dec
2013) No.29
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-407/2010/D
|
South Island Line (East)
|
Monthly EM&A Report (Jan
2014) No.30
|
http://www.epd.gov.hk/eia/english/register/index8/vep4192013_content.html
|
|
|
EP-433/2011
|
Asia Submarine-cable Express (ASE) - Tseung Kwan O
|
10th Weekly Site Inspection
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4332011_content.html
|
|
|
-
Kowloon City District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Nov
2013)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise
Terminal at Kai Tak
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
5th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
6th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
18th Monthly EM&A Report (Dec 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.14
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.15
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.14
(Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.15 (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
-
Kwun Tong District
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Nov
2013)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise
Terminal at Kai Tak
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Oct
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Nov
2013)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Nov
2013)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering
Feasibility Study for Development at Anderson Road
|
Monthly EM&A Report (Dec
2013)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Oct
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard Sites
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
-
Sham Shui Po District
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Aug
to Oct 2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18,DC/2009/19)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A report (Jun
to Aug2012)(DC/2007/23,DC/2009/10,DC/2009/17,DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A report (Nov
2013)(DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Nov
2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
-
Wong Tai Sin District
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.14
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.15
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Nov
2013)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving
the Planned Kai Tak Development
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise
Terminal at Kai Tak
|
Quarterly EM&A Report (Sep
2013 to Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
-
Yau Tsim Mong District
|
|
|
EP-317/2009
|
Tsim Sha Tsui Station Northern
Subway
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T
in West Kowloon
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.14
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-438/2012/D
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report No.15
|
http://www.epd.gov.hk/eia/english/register/index8/vep4122013_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.14
(Oct 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom Section
|
Monthly EM&A Report No.15 (Nov 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-366/2009/A
|
Road Works at West
Kowloon
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-366/2009/A
|
Road Works at West
Kowloon
|
Monthly EM&A Report (Dec
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-349/2009/K
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Nov
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4202013_content.html
|
|
|
|
|
|
|
|
|
|