Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
Application
for EIA Study Brief
|
|
Nil
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
DIR-244/2016
|
Asia-Africa-Europe-1 (AAE-1) Cable System
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2442016.pdf
|
|
Application
for Approval of EIA Report
|
|
Nil
|
|
Application
for Environmental Permit
|
|
Nil
|
|
Application
for Variation of an Environmental Permit
|
|
VEP-492/2016
|
Kwun Tong Line Extension
|
Environmental Permit issued (EP-99/2010/D)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4922016.htm
|
|
VEP-494/2016
|
Development of an EcoPark in Tuen Mun Area 38
|
Environmental Permit issued (EP-226/2005/D)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4942016.htm
|
|
VEP-495/2016
|
Shatin to Central Link - Tai Wai to
Hung Hom Section
|
Environmental Permit issued (EP-438/2012/J)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4952016.htm
|
|
VEP-497/2016
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Environmental Permit issued (EP-353/2009/J )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4972016.htm
|
|
Application
for Further Environmental Permit
|
|
FEP-166/2016
|
Demolition of buildings and structures in the proposed
Kennedy Town Comprehensive Development Area Site
|
Environmental Permit issued (FEP-01/136/2002/E)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1662016.htm
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
EP-427/2011/A
|
Dredging, Management and Capping of
Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly Progress Report (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
Bi-weekly Impact Water Quality Monitoring
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
5th White-bellied Sea Eagle Impact Monitoring
Survey Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
5th Weekly Coral Impact Monitoring Survey
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
4th Weekly Coral Impact Monitoring Survey
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
FEP-06/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Silt Curtain Deployment Plan(HK/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
EP-068/2000/A
|
Tuen Mun Sewerage -
Eastern Coastal Sewerage Extension
|
Baseline Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep4712015_content.html
|
|
EP-078/2000/B
|
Shenzhen River Regulation Project Stage III
|
Baseline Monitoring Report Phase I
|
http://www.epd.gov.hk/eia/english/register/index8/vep0442001_content.html
|
|
EP-078/2000/B
|
Shenzhen River Regulation Project Stage III
|
Baseline Monitoring Report Phase II Contract A
|
http://www.epd.gov.hk/eia/english/register/index8/vep0442001_content.html
|
|
EP-078/2000/B
|
Shenzhen River Regulation Project Stage III
|
Baseline Monitoring Report Phase II Contract B
|
http://www.epd.gov.hk/eia/english/register/index8/vep0442001_content.html
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
Island District
|
Central & Western District
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
- Island District
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Seventh Quarterly Environmental Monitoring and Audit Report
(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Annual EM&A Review Report (Mar 2013 to Feb 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Jun 2015 to Aug 2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines
(GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit
Report (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Monthly EM&A Report (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and Audit
Report (Mar to May 2015)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and
Audit Report (Oct 2015 to Dec 2015)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Annual EM&A Review Report (Mar 2013 to Feb 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Jan 2016)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2015 to Nov 2015)(HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015) (HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-353/2009/I
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Dec 2015) (HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4772015_content.html
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary
to Tung Chung Area 56 Public Housing Development
|
Monthly EM&A Report (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1 Phase 1
Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Quarterly EM&A Summary Report (Aug 2015
to Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
124th Monthly EM&A Report (12 Dec 2015
to 11 Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental Monitoring and Audit
Report (No. 125)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit
Report (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental
Monitoring and Audit Report Unit L10 (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
EP-353/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and
Audit Report (Mar to May 2015)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3552012_content.html
|
|
EP-392/2010/A
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Quarterly EM&A Report (Oct 2015 to Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4542014_content.html
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1 Phase 2 -
Sok Kwu Wan Sewage Collection,
Treatment and Disposal Facilities
|
Quarterly EM&A Report (Sep 2015 to Nov
2015) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1 Phase 2 -
Sok Kwu Wan Sewage
Collection, Treatment and Disposal Facilities
|
Quarterly EM&A Report (Jun 2015 to Aug
2015) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport
into a Three-Runway System
|
Monthly EM&A Report No.1 (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
- North District
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Quarterly EM&A Report (Sep 2015 to Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further Expansion at Fanling North New Development Area
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
Monthly EM&A Report(Jan
2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
EP-436/2012/C
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report(Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4822015_content.html
|
|
- Sai Kung
District
|
|
EP-134/2002/K
|
Fill Bank at Tseung
Kwan O Area 137
|
Monthly EM&A Report (Dec 2015)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
EP-134/2002/K
|
Fill Bank at Tseung
Kwan O Area 137
|
Quarterly EM&A Report (Oct 2015 to Dec
2015)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
EP-448/2013
|
Natural Terrain Hazard Mitigation Works at
Study Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung
|
Monthly EM&A Report (Dec
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
EP-435/2011/A
|
Sewerage Works at Pik
Shui Sun Tsuen
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4482014_content.html
|
|
EP-410/2010
|
Phase III Redevelopment of The Hong Kong
Federation of Youth Groups Jockey Club Sai Kung
Outdoor Training Camp
|
Quarterly EM&A Report (Nov 2015 to Jan
2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4102010_content.html
|
|
- Sha Tin
District
|
|
EP-438/2012/I
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4842015_content.html
|
|
EP-438/2012/I
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4842015_content.html
|
|
- Tai Po District
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further Expansion at Fanling North New Development Area
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
EP-303/2008
|
Drainage Improvement in Sha
Tin and Tai Po
|
Monthly EM&A Report (Dec 2015)
(DC/2009/22)(DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
- Tsuen Wan District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17, DC/2009/18)(Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jun 2015 to
Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Oct
2015 to Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Jan
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Monthly EM&A Report No.1 (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
- Tuen Mun District
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Seventh Quarterly Environmental Monitoring
and Audit Report (HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Annual EM&A Review Report (Mar 2013 to Feb 2014)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Jun 2015 to Aug 2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
EP-321/2008/B
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Quarterly EM&A Report (Aug 2015 to Oct
2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html
|
|
EP-321/2008/B
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html
|
|
EP-226/2005/C
|
Development of an EcoPark
in Tuen Mun Area 38
|
Annual EM&A Report (2015)_issue 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep4082013_content.html
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Monthly EM&A Report No.1 (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
- Yuen Long District
|
|
EP-411/2011
|
Improvement to Pok
Oi Interchange
|
Monthly EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
EP-411/2011
|
Improvement to Pok
Oi Interchange
|
Quarterly EM&A Report (Sep 2015 to Nov
2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
EP-411/2011
|
Improvement to Pok
Oi Interchange
|
Monthly EM&A Report (Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
EP-490/2014
|
Drainage Works at Mai Po
|
Final EM&A Report (Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4902014_content.html
|
|
- Kwai Tsing District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17, DC/2009/18)(Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jun 2015 to
Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Oct
2015 to Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Jan
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
- Central & Western District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17, DC/2009/18)(Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Jun 2015 to
Aug 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Oct
2015 to Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Jan
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-313/2008/J
|
West Island Line
|
Monthly EM&A Report(Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Quarterly EM&A Report (Nov 2015 to Jan
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Jan
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Quarterly EM&A Report (Nov 2015 to Jan
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Jan
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
EP-364/2009/D
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Jan
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html
|
|
|
|
|
|
|
|
|
|