Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
(for the period between 16 Feb 2017 to 15 Mar 2017)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
Application
for EIA Study Brief
|
|
|
ESB-297/2017
|
Tuen Mun Western Bypass
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-297.pdf
|
|
|
ESB-298/2017
|
Proposed
Explosive Magazine Site at Tseung Kwan O Area 137
for Tseung Kwan O – Lam Tin Tunnel
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb298/esb298.pdf
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
DIR-251/2017
|
Landfill
Gas Power Generation Project at the West New Territories (WENT) Landfill
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir251/dir251.pdf
|
|
|
Application
for Approval of EIA Report
|
|
|
Nil
|
|
|
Application
for Environmental Permit
|
|
|
AEP-527/2017
|
Construction
of New Primary Distributor Road (Road P1) in Hung Shui
Kiu New Development Area
|
Environmental Permit issued (EP-527/2017)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5272017.htm
|
|
|
AEP-528/2017
|
Construction
of Eight New District Distributor Roads (Road D1 to D8) in Hung Shui Kiu New Development Area
|
Environmental Permit issued (EP-528/2017)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5282017.htm
|
|
|
AEP-529/2017
|
Construction
of Slip Roads between: Road D8 Junction and Existing Castle Peak Road;
Junction of D8/P1 and Junction of D7/P1; and Kong Sham Western Highway Connection
to Road D3 in Hung Shui Kiu
New Development Area
|
Environmental Permit issued (EP-529/2017)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5292017.htm
|
|
|
AEP-530/2017
|
Construction
of Partly Depressed and Partly Decked-over Roads Located at Roads D2, D4
and D6 in Hung Shui Kiu
New Development Area
|
Environmental Permit issued (EP-530/2017)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5302017.htm
|
|
|
AEP-531/2017
|
Construction
of Road P1 and a Slip Road from Kong Sham Western Highway to Road D3 Partly
Located within the “Conservation Area” of Yuen Tau Shan in Hung Shui Kiu New Development Area
|
Environmental Permit issued (EP-531/2017)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5312017.htm
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
Nil
|
|
|
Application
for Further Environmental Permit
|
|
|
Nil
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
EP-404/2011/C
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Submission
of Vegetation Survey Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
EP-454/2013
|
Reprovisioning of FEHD Sai Yee Street Vehicle Depot at Yen Ming Road, West
Kowloon Reclamation Area
|
Submission
of Environmental Impact Monitoring Report(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html
|
|
|
EP-454/2013
|
Reprovisioning of FEHD Sai Yee Street Vehicle Depot at Yen Ming Road, West
Kowloon Reclamation Area
|
Submission
of Environmental Impact Monitoring Report(Feb 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html
|
|
|
EP-313/2008/J
|
West
Island Line
|
Aesthetic Landscape
and Architectural Proposal (Apr 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
|
EP-313/2008/J
|
West Island
Line
|
Aesthetic
Landscape and Architectural Proposal (Part 2)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
|
EP-313/2008/J
|
West
Island Line
|
Removal
Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
|
FEP-01/334/2009
|
Sludge Treatment
Facilities
|
Landfill
Gas Monitoring (Feb 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1152010_content.html
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
Post-Construction Ecological Monitoring Report (No.22)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
Post-Construction Ecological Monitoring Report (No.23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
Post-Construction Ecological Monitoring Report (No.24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-489/2014
|
Expansion
of Hong Kong International Airport into a Three-Runway System
|
Construction
Phase Monthly EM&A Report No.13
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
EP-451/2013
|
Trunk Road
T2
|
Summary of
Reconnaissance Site Visit
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
EP-451/2013
|
Trunk Road
T2
|
Supplementary
Contamination Assessment Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
EP-455/2013
|
Proposed
Road Improvement Works in West Kowloon Reclamation Development Phase 1
|
Environmental
Monitoring Proposal - 24-hrs TSP
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
EP-455/2013
|
Proposed
Road Improvement Works in West Kowloon Reclamation Development Phase 1
|
Environmental
Baseline Monitoring (24-hr TSP AM4-A) Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
EP-455/2013
|
Proposed
Road Improvement Works in West Kowloon Reclamation Development Phase 1
|
Environmental
Baseline Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
EP-455/2013
|
Proposed
Road Improvement Works in West Kowloon Reclamation Development Phase 1
|
Baseline
Environmental Monitoring (AM1 & AM3-A 24 hr TSP) Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
- Island District
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.2
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Monthly EM&A Report (Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Jan 2017)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2014/05)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly
Environmental Monitoring and Audit Report (Sep 2016 to Nov
2016)(HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2016 to Nov 2016)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Dec 2016)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2013/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
EP-392/2010/B
|
Improvement of Fresh Water Supply to Cheung Chau
|
Quarterly EM&A Report (Oct to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5022016_content.html
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Jan 2017)
(HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Jan 2017)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2016 to Nov 2016)(HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly Environmental Monitoring and Audit Report Unit
L10 (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7)
into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary to Tung Chung Area
56 Public Housing Development
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part &
remaining part)
|
Monthly Environmental Monitoring and Audit Report (No.
138)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
137th Monthly EM&A Report (12 Jan 2017 to 11 Feb
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
- North District
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Quarterly EM&A Report (Aug 2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage
Treatment Works - Further Expansion at Fanling North
New Development Area
|
Quarterly EM&A Report(Oct 2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage
Treatment Works - Further Expansion at Fanling North
New Development Area
|
Monthly EM&A Report(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Apr 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang /
Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang /
Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (Feb 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
EP-324/2008/D
|
Widening of ToloHighway/FanlingHighway between Island House Interchange and Fanling
|
Monthly EM&A Report
(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_index.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly Environmental Monitoring and Audit Summary
Report (Nov 2016 to Jan 2017) (CV/2012/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
- Sai Kung
District
|
|
|
EP-399/2010/D
|
Kwun Tong
Line Extension
|
Monthly EM&A
Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
EP-435/2011/A
|
Sewerage Works at Pik
Shui Sun Tsuen
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4482014_content.html
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung Kwan
O Industrial Estate
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung Kwan
O Industrial Estate
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung Kwan
O Industrial Estate
|
Quarterly EM&A Report (Oct to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly EM&A Report (Jan 2017)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-438/2012/K
|
Shatin to
Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
- Sha Tin
District
|
|
|
EP-494/2015
|
In-situ Reprovisioning of
Sha Tin Water Treatment Works - South Works
|
Monthly EM&A Report
No.11
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
EP-438/2012/K
|
Shatin to Central Link -
Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
- Tai Po District
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage
Treatment Works - Further Expansion at Fanling North
New Development Area
|
Quarterly EM&A Report(Oct 2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment
Works - Further Expansion at Fanling North
New Development Area
|
Monthly EM&A Report(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
EP-324/2008/D
|
Widening of ToloHighway/FanlingHighway between Island House Interchange and Fanling
|
Monthly EM&A Report
(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai Boundary
Control Point and Associated Works
|
Quarterly EM&A Report (Aug 2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly Environmental Monitoring and Audit Summary
Report (Nov 2016 to Jan 2017) (CV/2012/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
- Tsuen Wan District
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
2016 to Oct 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Sep
to Nov 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Oct
2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
- Tuen Mun District
|
|
|
FEP-01/497/2015
|
Decommissioning of West Portion of the Middle Ash Lagoon
at Tsang Tsui, Tuen Mun
|
Monthly EM&A Report(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1692016_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Jan 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-068/2000/A
|
Tuen Mun Sewerage
- Eastern Coastal Sewerage Extension
|
Monthly EM&A Report (Jan 2017)(DC/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4712015_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area
54 Sewage Pumping Station
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen MunArea 38
|
Monthly EM&A Report (Jan 2017) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road, TuenMun
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-507/2016
|
Installation of One additional gas-fired generation unit (CCGT
Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.2
|
http://www.epd.gov.hk/eia/english/register/aep/ep5072016_content.html
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.2
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
- Yuen Long District
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung
River
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_index.html
|
|
|
EP-411/2011
|
Improvement
to Pok Oi Interchange
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-411/2011
|
Improvement
to Pok Oi Interchange
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Sep 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Apr 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at Tai
Shu Ha, Yuen Long for Liantang /
Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang /
Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (Feb 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
EP-311/2008/D
|
Proposed Comprehensive Development at Wo
Shang Wai, Yuen Long
|
Monthly EM&A Report(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3932013_content.html
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.2
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
- Kwai Tsing District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
2016 to Oct 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Sep
to Nov 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Oct
2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing
Container Basin and its Approach Channel
|
Monthly Environmental Monitoring & Audit Report (Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
- Central & Western District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
2016 to Oct 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Sep
to Nov 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Oct
2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jan 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Nov 2016 to Jan 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
EP-408/2011/C
|
Central Police Station Conservation and RevitalisationProject
|
Monthly EM&A Report(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4992016_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
FEP- 02/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
FEP-07/364/2009/D
|
Central - WanchaiBypass Tunnel (North Point
Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
FEP-11/364/2009/E
|
Central
- Wan Chai Bypass - Tunnel Buildings, Systems and
Fittings, and Works Associated with Tunnel Commissioning (Contract No.
HY/2011/08)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report
No.67
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Final Monthly EM&A Report Part 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
- Wan Chai District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
2016 to Oct 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Sep
to Nov 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Oct
2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
FEP- 02/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
FEP-07/364/2009/D
|
Central - WanchaiBypass Tunnel (North Point
Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
FEP-11/364/2009/E
|
Central
- Wan Chai Bypass - Tunnel Buildings, Systems and
Fittings, and Works Associated with Tunnel Commissioning (Contract No.
HY/2011/08)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
EP-444/2012/A
|
MTR Wan Chai Station Lee Tung
Street Subway
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Jan 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Quarterly EM&A Report (Nov 2016 to Jan 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report
No.67
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Final Monthly EM&A Report Part 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
- Eastern District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report(DC/2009/10,DC/2009/17,DC/2009/18)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
2016 to Oct 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Sep
to Nov 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Oct
2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Jan 2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
FEP- 02/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
FEP-07/364/2009/D
|
Central - WanchaiBypass Tunnel (North Point
Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4862015_content.html
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
FEP-11/364/2009/E
|
Central
- Wan Chai Bypass - Tunnel Buildings, Systems and
Fittings, and Works Associated with Tunnel Commissioning (Contract No.
HY/2011/08)
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5132016_content.html
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB) including its road tunnel and slip
roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report
No.67
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Final Monthly EM&A Report Part 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
- Southern District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
2016 to Oct 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Sep
to Nov 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Oct
2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-487/2014
|
Tai Shue Wan
Development at Ocean Park
|
Quarterly EM&A Report (Oct 2016 - Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html
|
|
|
EP-487/2014
|
Tai Shue Wan
Development at Ocean Park
|
Monthly EM&A Report (Jan 2017 - Feb 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html
|
|
|
EP-487/2014
|
Tai Shue Wan
Development at Ocean Park
|
Monthly EM&A Report (17 Jan 2017 - 16 Feb 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report
No.67
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Final Monthly EM&A Report Part 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
- Kowloon City District
|
|
|
EP-437/2012
|
Shatin to
Central Link - Mong Kok East
to Hung HomSection
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-445/2013/A
|
Kai Tak Development – Roads D3A & D4A
|
Monthly EM&A Report (Jan 2017)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Jan 2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFSBuilding,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly
EM&A Report (Jan 2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFSBuilding,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly
EM&A Report (Jan 2017)(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai TakDevelopment
|
Monthly EM&A Report (Jan
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-399/2010/D
|
Kwun Tong
Line Extension
|
Monthly EM&A
Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
EP-438/2012/K
|
Shatin to
Central Link - Tai Wai to Hung Hom Section
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
- Kwun Tong
District
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai TakDevelopment
|
Monthly EM&A Report (Jan
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan 2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFSBuilding, Radar
Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly
EM&A Report (Jan 2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFSBuilding,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly
EM&A Report (Jan 2017)(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for
Development at Anderson Road
|
Monthly EM&A Report (Jan
2017)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for
Development at Anderson Road
|
Monthly EM&A Report (Jan
2017)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
- Sham Shui Po
District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2009/24)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Aug
2016 to Oct 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/20)(Sep
to Nov 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(DC/2009/24)(Oct
2016 to Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
- Wong Tai Sin District
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2014/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai TakDevelopment
|
Monthly EM&A Report (Jan
2017)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFSBuilding,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly
EM&A Report (Jan 2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak Development
|
Monthly EM&A Report (Jan
2017)(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFSBuilding,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly
EM&A Report (Jan 2017)(KL/2015/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-438/2012/K
|
Shatin to
Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
- Yau Tsim Mong District
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Monthly EM&A Report (Feb 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Quarterly EM&A Report (Sep 2016 to Nov 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West Kowloon
Reclamation Development Phase 1
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover
Serving the West Kowloon Cultural District
|
Monthly EM&A Report (Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover
Serving the West Kowloon Cultural District
|
Quarterly EM&A Report (Nov 2016 to Jan
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Dec 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-399/2010/D
|
Kwun Tong
Line Extension
|
Monthly EM&A
Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
EP-437/2012
|
Shatin to
Central Link - Mong Kok East to Hung HomSection
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-414/2011
|
Reprovision of
Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-414/2011
|
Reprovision of
Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (Feb 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-317/2009/A
|
Tsim Sha Tsui
Station Northern Subway
|
Monthly EM&A Report (Dec 2016)(Final)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4232014_content.html
|
|
|
EP-317/2009/A
|
Tsim Sha Tsui
Station Northern Subway
|
Monthly EM&A Report (Jan 2017)(Final)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4232014_content.html
|
|
|
EP-438/2012/K
|
Shatin to
Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Jan 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|