Monthly Update of Documents Uploaded

 

       Documents Uploaded to the EIAO Website

       (for the period between 16 April 2013 to 15 May 2013)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

ESB-260/2013

Improvement of Yuen Long Town Nullah (Town Centre Section)

EIA Study Brief

http://www.epd.gov.hk/eia/register/study/latest/esb-260.pdf

 

 

ESB-261/2013

Tai Shue Wan Development at Ocean Park

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb261/esb261.pdf

 

 

ESB-262/2013

Drainage Improvement Works in San Tin (Remaining Works)

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb262/esb262.pdf

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

Nil

 

 

Application for Approval of EIA Report

 

 

EIA-206/2013

Drainage Improvement Works at Ngong Ping

Approval Condition

 

http://www.epd.gov.hk/eia/register/report/conditions/aeiar2062012.pdf

 

 

Application for Environmental Permit

 

 

AEP-445/2012

Kai Tak Development – Roads D3A & D4A

Environmental Permit issued (EP-445/2012)

http://www.epd.gov.hk/eia/register/permit/latest/ep4452012.htm

 

 

Application for Variation of an Environmental Permit

 

 

VEP-398/2013

Upgrading of Pillar Point Sewage Treatment Works

Environmental Permit issued (EP-321/2008/A )

http://www.epd.gov.hk/eia/register/permit/latest/vep3982013.htm

 

 

VEP-399/2013

South Island Line (East)

Environmental Permit issued (EP-407/2010/C )

http://www.epd.gov.hk/eia/register/permit/latest/vep3992013.htm

 

 

VEP-400/2013

Restoration to Yan Tun Kong Study Hall at Ping Shan, Yuen Long, New Territories

Environmental Permit issued (EP-420/2011/A  )

http://www.epd.gov.hk/eia/register/permit/latest/vep4002013.htm

 

 

VEP-401/2013

Shatin to Central Link - Tai Wai to Hung Hom Section

Environmental Permit issued (EP-438/2012/C )

http://www.epd.gov.hk/eia/register/permit/latest/vep4012013.htm

 

 

VEP-402/2013

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Environmental Permit issued (EP-353/2009/F  )

http://www.epd.gov.hk/eia/register/permit/latest/vep4022013.htm

 

 

Application for Further Environmental Permit

 

 

Nil

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

EP-327/2009/A

Expansion of Ha Tsuen Sewage Pumping Station

Landscape and visual Impact Monitoring Result (No.33) (Oct 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html

 

 

EP-327/2009/A

Expansion of Ha Tsuen Sewage Pumping Station

Landscape and visual Impact Monitoring Result (No.34) (Nov 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html

 

 

EP-327/2009/A

Expansion of Ha Tsuen Sewage Pumping Station

Landscape and visual Impact Monitoring Result (No.35) (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Silt Curtain Deployment Plan

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

Submission as required by Environmental Permit Condition - EM&A Reports

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 89)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

88th Monthly EM&A Report (12 Dec 2012 to 11 Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

EP-427/2011/A 

Dredging, Management and Capping of Contaminated Sediment Disposal Facility to the South of The Brothers

Revised Updated EM&A Manual

http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html

 

 

EP-229/2005

Development of SkyCity Golf Course

Quarterly EM&A Report (Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep2292005_content.html

 

 

EP-282/2007

Outlying Islands Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html

 

 

EP-281/2007/A

Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A Report (Jan 2013) (DC/2009/13)

http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html

 

 

EP-071/2000/C

1,800MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

EP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 90)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

89th Monthly EM&A Report (12 Jan 2013 to 11 Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

EP-349/2009/I

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html

 

 

EP-237/2005/B 

Drainage Improvements in Southern Lantau

Monthly Environmental Monitoring & Audit Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html

 

 

- North District

 

 

EP-430/2011

Regulation of Shenzhen River Stage IV

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html

 

 

EP-277/2007/A

Drainage Improvement in Northern New Territories - Package C

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

EP-324/2008/A

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual Environmental Monitoring and Audit Report (Nov 2011 to Oct 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html

 

 

EP-324/2008/A

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly Environmental Monitoring and Audit Report (Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html

 

 

EP-329/2009

Provision of Cremators at Wo Hop Shek Crematorium

Quarterly EM&A Report (Nov 2012 - Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html

 

 

- Sai Kung District

 

 

FEP-02/410/2010

Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp

Quarterly EM&A Report (Oct to Dec 2012)

http://www.epd.gov.hk/eia/english/register/index7/fep1372012_content.html

 

 

FEP-02/428/2011/A

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

4th Monthly EM&A Report

http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

EP-438/2012/B

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html

 

 

FEP-02/410/2010

Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1372012_content.html

 

 

EP-399/2010/B

Kwun Tong Line Extension

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html

 

 

EP-134/2002/J

Fill Bank at Tseung Kwan O Area 137

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html

 

 

EP-319/2009/A

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly Environmental Monitoring & Audit Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html

 

 

FEP-02/428/2011/A 

Drainage Diversion Works For the Comprehensive Residential Development At Various Lots In DD227 & DD229, Tai Po Tsai, Sai Kung

5th Monthly EM&A Report

http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html

 

 

FEP-02/410/2010

Phase III Redevelopment of The Hong Kong Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1372012_content.html

 

 

EP-399/2010/B

Kwun Tong Line Extension

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html

 

 

EP-319/2009/A

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly Environmental Monitoring & Audit Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2812009.html

 

 

EP-319/2009/C

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Quarterly Environmental Monitoring & Audit Report (Dec 2012 to Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3912013_content.html

 

 

- Sha Tin District

 

 

EP-438/2012/B

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html

 

 

EP-438/2012/B

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html

 

 

- Tai Po District

 

 

EP-303/2008

Drainage Improvement in Sha Tin and Tai Po

Monthly EM&A Report (Dec 2012) (DC/2009/22)

http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html

 

 

EP-223/2005/A

Drainage Improvement Works in Upper Tai Po River

Monthly EM&A Report (Nov 2012) (DC/2007/06)

http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html

 

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html

 

 

EP-303/2008

Drainage Improvement in Sha Tin and Tai Po

Monthly EM&A Report (Dec 2012) (DC/2010/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html

 

 

EP-303/2008

Drainage Improvement in Sha Tin and Tai Po

Quarterly EM&A Report (Oct to Dec 2012) (DC/2010/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html

 

 

EP-303/2008

Drainage Improvement in Sha Tin and Tai Po

Monthly EM&A Report (Jan 2013) (DC/2009/22)

http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html

 

 

EP-303/2008

Drainage Improvement in Sha Tin and Tai Po

Monthly EM&A Report (Jan 2013) (DC/2010/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html

 

 

EP-324/2008/A

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Annual Environmental Monitoring and Audit Report (Nov 2011 to Oct 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html

 

 

EP-324/2008/A

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Quarterly Environmental Monitoring and Audit Report (Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html

 

 

EP-265/2007

Tai Po Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B

Monthly Environmental and Audit Report (Jan 2013) (DE/2009/09)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

 

EP-265/2007

Tai Po Sewage Treatment Works Stage 5 Phase 2A-Disinfection and Stage 5 Phase 2B

Monthly Environmental and Audit Report (Jan 2013) (DC/2009/09)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

 

- Tsuen Wan District

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Sep to Nov 2012)(DC/2007/23)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-275/2007

Drainage Improvement in Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Sep to Nov 2012) (DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Nov 2012 to Jan 2013)(DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (No.12 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Feb 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A report (No.38 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Tuen Mun District

 

 

FEP-01/334/2009/A

Sludge Treatment Facilities

Quarterly EM&A Report (Sep to Nov 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3452011_content.html

 

 

EP-342/2009/C

Traffic Improvements to Tuen Mun Road Town Centre Section

Monthly EM&A Report (Dec 2012) Final

http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html

 

 

FEP-01/334/2009/C

Sludge Treatment Facilities

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html

 

 

FEP-01/334/2009/C

Sludge Treatment Facilities

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html

 

 

EP-391/2010/A

Black Point Gas Supply Project (First Phase)

Monthly EM&A Report (Jan 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3402011_content.html

 

 

EP-331/2009

Widening of Tsing Lun Road, Tuen Mun

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html

 

 

EP-321/2008

Upgrading of Pillar Point Sewage Treatment Works

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html

 

 

EP-321/2008

Upgrading of Pillar Point Sewage Treatment Works

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html

 

 

EP-321/2008

Upgrading of Pillar Point Sewage Treatment Works

Quarterly EM&A Report (Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html

 

 

EP-342/2009/C

Traffic Improvements to Tuen Mun Road Town Centre Section

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html

 

 

EP-210/2005/A

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly Environmental Monitoring and Audit Report (CV/2009/02) (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html

 

 

EP-210/2005/A

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly Environmental Monitoring and Audit Report (CV/2009/02) (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html

 

 

EP-391/2010/A

Black Point Gas Supply Project (First Phase)

Monthly EM&A Report (Feb 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3402011_content.html

 

 

- Yuen Long District

 

 

FEP-05/347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 3)

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html

 

 

EP-349/2009/I

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html

 

 

- Kwai Tsing District

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Sep to Nov 2012)(DC/2007/23)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-275/2007

Drainage Improvement in Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Sep to Nov 2012) (DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Nov 2012 to Jan 2013)(DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (No.12 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Feb 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A report (No.38 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Central & Western District

 

 

EP-313/2008/F

West Island Line

Monthly EM&A Report No.41

http://www.epd.gov.hk/eia/english/register/index8/vep3762012_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-408/2011/B 

Central Police Station Conservation and Revitalisation Project

Monthly EM&A Report (No.15

http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Oct to Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Dec 2012) revised

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-01/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

EP-408/2011/B

Central Police Station Conservation and Revitalisation Project

5th Quarterly EM&A Report

http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html

 

 

EP-408/2011/B

Central Police Station Conservation and Revitalisation Project

Monthly EM&A Report (No.16)

http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html

 

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Final EM&A Report

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Quarterly EM&A Report (Nov 2012 to Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

 

EP-364/2009/B

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Sep to Nov 2012)(DC/2007/23)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Sep to Nov 2012) (DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Nov 2012 to Jan 2013)(DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (No.12 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Feb 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A report (No.38 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

FEP-01-272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-313/2008/F

West Island Line

Monthly EM&A Report No.42

http://www.epd.gov.hk/eia/english/register/index8/vep3762012_content.html

 

 

- Wan Chai District

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Oct to Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-01/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

FEP-01-272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Sep to Nov 2012)(DC/2007/23)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-364/2009/B

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Sep to Nov 2012) (DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Nov 2012 to Jan 2013)(DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (No.12 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Feb 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A report (No.38 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Eastern District

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-401/2010

Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development

8th Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html

 

 

FEP-01/272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Quarterly EM&A Report (Oct to Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

FEP-01-272/2007/B

Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2902009_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

FEP-01/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html

 

 

FEP-02/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

 

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

EP-364/2009/B

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Sep to Nov 2012)(DC/2007/23)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-401/2010

 Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development

9th Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html

 

 

EP-442/2012

EMSD Hong Kong Workshop at Sheung On Street, Chai Wan

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Sep to Nov 2012) (DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Nov 2012 to Jan 2013)(DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (No.12 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Feb 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A report (No.38 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Southern District

 

 

 

EP-407/2010/B

South Island Line (East)

Monthly EM&A Report No.19

http://www.epd.gov.hk/eia/english/register/index8/vep3842012_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Sep to Nov 2012)(DC/2007/23)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Sep to Nov 2012) (DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Nov 2012 to Jan 2013)(DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (No.12 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Feb 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A report (No.38 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-407/2010/B 

South Island Line (East)

Monthly EM&A Report (No.20)

http://www.epd.gov.hk/eia/english/register/index8/vep3842012_content.html

 

 

- Kowloon City District

 

 

EP-401/2010

Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development

8th Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html

 

 

EP-438/2012/B

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html

 

 

EP-399/2010/B

Kwun Tong Line Extension

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html

 

 

EP-328/2009/A

 Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

 Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-437/2012

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report No.5

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report(Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report(Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report(Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report(Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report(Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report(Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-401/2010

 Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development

9th Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html

 

 

EP-399/2010/B

Kwun Tong Line Extension

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html

 

 

EP-437/2012 

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

 

EP-438/2012/B

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html

 

 

- Kwun Tong District

 

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Quarterly EM&A Report (Sep to Nov 2012

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

 

EP-328/2009/A

 Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

 Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report(Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report(Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report(Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report(Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report(Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report(Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-409/2010

Yau Tong Bay - Decommissioning of Shipyard Sites

Quarterly EM&A Report (Aug to Oct 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html

 

 

- Sham Shui Po District

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Sep to Nov 2012)(DC/2007/23)

http://www.epd.gov.hk/eia/english/register/aep/ep3222008_content.html

 

 

EP-322/2008/E

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Oct to Dec 2012)(DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (Sep to Nov 2012) (DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Jan 2013) (DC/2009/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (Nov 2012 to Jan 2013)(DC/2009/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A report (No.12 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Feb 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Mar 2013) (DC/2007/23)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A report (No.38 )(DC/2007/24)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Wong Tai Sin District

 

 

EP-328/2009/A

 Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

 Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-438/2012/B

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report(Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report(Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report(Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report(Nov 2012 to Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report(Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report(Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-438/2012/B

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html

 

 

- Yau Tsim Mong District

 

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Monthly EM&A Report (Dec 2012) revised

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

 

EP-438/2012/B

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Dec 2012)

http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html

 

 

EP-366/2009/A

Road Works at West Kowloon

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html

 

 

EP-399/2010/B

Kwun Tong Line Extension

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html

 

 

EP-349/2009/I

Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3772012_content.html

 

 

EP-414/2011

Reprovision of Bridges D1 and T in West Kowloon

Monthly EM&A Report (Jan 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html

 

 

EP-437/2012

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report No.5

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

 

EP-399/2010/B

Kwun Tong Line Extension

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html

 

 

EP-366/2009/A

Road Works at West Kowloon

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html

 

 

EP-437/2012 

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

 

EP-438/2012/B

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report (Feb 2013)

http://www.epd.gov.hk/eia/english/register/index8/vep3822012_content.html

 

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Final EM&A Report

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html

 

 

EP-273/2007

Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun

Quarterly EM&A Report (Nov 2012 to Dec 2012)

http://www.epd.gov.hk/eia/english/register/aep/ep2732007_content.html