Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
|
(for the period between 16 Apr 2016 to
15 May 2016)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
Application
for EIA Study Brief
|
|
|
ESB-292/2016
|
Hong Kong Offshore LNG Terminal
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb292/esb292.pdf
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
DIR-246/2016
|
Conversion of the Former French Mission Building for
Accommodation Use by Law-related Organisation(s)
and Related Purposes
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir246/dir246.pdf
|
|
|
DIR-247/2016
|
Decommissioning and Disposal of Clinical Waste
Incinerator and Associated Chimney at ex-Siu Lam
Hospital in Tuen Mun,
New Territories
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir247/dir247.pdf
|
|
|
DIR-248/2016
|
Improvement to Sharp Bend of Keung Shan Road near Shek Pik Reservoir Service
Access Road
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/dir248/dir248.pdf
|
|
|
Application
for Approval of EIA Report
|
|
|
EAI-237/2016
|
Additional Gas-fired Generation Units Project
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2372016/html/0308057_EIA_Index.htm
|
|
|
Application
for Environmental Permit
|
|
|
AEP-508/2016
|
Asia-Africa-Europe-1 (AAE-1) Cable System
|
Environmental Permit issued (EP-508/2016)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5082016.htm
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
VEP-499/2016
|
Central Police Station Compound Conservation and Revitalisation
|
Environmental Permit issued (EP-408/2011/C )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4992016.htm
|
|
|
Application
for Further Environmental Permit
|
|
|
FEP-167/2016
|
- Chok Ko
Wan Link Road (remaining part)
- Road P2 - Yam O to Penny's Bay (remaining
part)
|
Environmental Permit issued (FEP-01/138/2002/C )
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1672016.htm
|
|
|
FEP-168/2016
|
- Chok Ko
Wan Link Road (part)
- Road P2 - Yam O to Penny's Bay (part)
|
Environmental Permit issued (FEP-02/097/2001/B )
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1682016.htm
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
9th Weekly Coral Impact Monitoring Survey
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine Cable Circuit Connecting
Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
Sixth Water Quality Impact Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
10th White-bellied Sea Eagle Impact Monitoring
Survey Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine Cable Circuit Connecting
Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
11th White-bellied Sea Eagle Impact Monitoring Survey Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
12th White-bellied Sea Eagle Impact Monitoring
Survey Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
Seventh Water Quality Impact Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine Cable Circuit Connecting
Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
10th Weekly Coral Impact Monitoring Survey
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
|
EP-461/2013
|
Replacement of the Existing 11KV Submarine
Cable Circuit Connecting Liu Ko Ngam and Pak Sha Tau Tsui at Kat O
|
13th White-bellied Sea Eagle Impact Monitoring
Survey Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4612013_content.html
|
|
|
FEP-01/136/2002/E
|
Demolition of buildings and structures in the
proposed Kennedy Town Comprehensive Development Area Site
|
Waste Management Plan
|
http://www.epd.gov.hk/eia/english/register/index7/fep1662016_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping of Contaminated Sediment Disposal
Facility to the South of The Brothers
|
Monthly Progress Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and Capping of
Contaminated Sediment Disposal Facility to the South of The Brothers
|
Monthly Progress Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-454/2013
|
Reprovisioning of FEHD Sai Yee
Street Vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area
|
Submission of Environmental Impact Monitoring
Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
- Island District
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Feb 2016)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Feb 2016)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Twenty-eighth Monthly Environmental
Monitoring and Audit Report (Feb 2016)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Feb 2016)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2015 to Nov 2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and Audit Report (Sep 2015 to
Nov 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Mar 2016)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit Report (Mar
2016)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-452/2013
|
Temporary Sewage Pumping Station Ancillary
to Tung Chung Area 56 Public Housing Development
|
Monthly EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4522013_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental Monitoring and Audit
Report (No. 127)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly Environmental Monitoring and Audit
Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
EP-353/2009/J
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Feb 2016)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4972016_content.html
|
|
|
EP-353/2009/J
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Feb
2016)(HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4972016_content.html
|
|
|
EP-353/2009/J
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Feb 2016)(HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4972016_content.html
|
|
|
EP-353/2009/J
|
Hong Kong - Zhuhai - Macao Bridge Hong
Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit Report (Feb
2016)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4972016_content.html
|
|
|
EP-353/2009/J
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Mar 2016)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4972016_content.html
|
|
|
EP-353/2009/J
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Mar 2016)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4972016_content.html
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Ninth Monthly EM&A Summary Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Third Quarterly EM&A Summary Report(Dec
2015 to Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Tenth Monthly EM&A Summary Report(Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report(Mar 2016)
(HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report(Mar
2016) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Oct to Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
EP-287/2007
|
Lamma Power
Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Oct to Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7) into a
Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines
(GT5 & GT7) into a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit
Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
126th Monthly EM&A Report (12 Feb 2015
to 11 Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Monthly EM&A Report No.2 (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
EP-281/2007/A
|
Construction of Sewage Treatment Works at
Yung Shue Wan and Sok Kwu Wan
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma
Extension
|
Environmental Monitoring and Audit Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at Lamma Extension
|
Monthly EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Nov 2015) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Dec 2015) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Jan 2016) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Feb 2016) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
- North District
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Jan 2016) (DC/2011/06)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Sep 2015)(chi)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Oct
2015)(chi)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Nov
2015)(chi)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Dec
2015)(chi)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-436/2012/D
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4902016_content.html
|
|
|
EP-404/2011/C
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
EP-404/2011/C
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Quarterly EM&A Report (Nov 2015 to Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
EP-324/2008/D
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Feb 2016)
(DC/2011/06)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
- Sai Kung
District
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly
EM&A Report (Feb 2016)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung
Kwan O Area 137
|
Monthly EM&A Report (Mar 2016)(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly
EM&A Report (Mar 2016)(CV/2013/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
EP-435/2011/A
|
Sewerage Works at Pik
Shui Sun Tsuen
|
Monthly EM&A Report (Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4482014_content.html
|
|
|
EP-448/2013
|
Natural Terrain Hazard Mitigation Works at Study Area No.
12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
|
EP-448/2013
|
Natural Terrain Hazard Mitigation Works at
Study Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Monthly
EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
EP-438/2012/J
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Contamination Assessment Plan for Magazine
Site at TKO Area 137
|
http://www.epd.gov.hk/eia/english/register/index8/vep4952016_content.html
|
|
|
- Sha Tin
District
|
|
|
EP-494/2015
|
In-situ Reprovisioning
of Sha Tin Water Treatment Works - South Works
|
Monthly EM&A Report No.1
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
EP-438/2012/J
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Contamination Assessment Plan for Magazine
Site at TKO Area 137
|
http://www.epd.gov.hk/eia/english/register/index8/vep4952016_content.html
|
|
|
- Tai Po District
|
|
|
EP-303/2008
|
Drainage Improvement in Sha
Tin and Tai Po
|
Monthly EM&A Report (Feb
2016) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Quarterly EM&A Report (Nov 2015 to Jan
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
EP-324/2008/D
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4802015_content.html
|
|
|
- Tsuen Wan District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Nov
2015 to Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2007/23)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Sep 2015 to Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Ninth Monthly EM&A Summary Report (Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Third Quarterly EM&A Summary Report(Dec
2015 to Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Tenth Monthly EM&A Summary Report(Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-489/2014
|
Expansion of Hong Kong International Airport into a
Three-Runway System
|
Monthly EM&A Report No.2 (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
- Tuen Mun District
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Feb 2016)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Feb 2016)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Twenty-eighth Monthly Environmental
Monitoring and Audit Report (Feb 2016)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Feb 2016)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2015 to Nov 2015)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (Sep 2015 to Nov 2015)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Mar 2016)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Mar 2016)(HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
EP-321/2008/B
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Quarterly EM&A Report (Nov 2015 to Jan
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4372014_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54
Sewage Pumping Station
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen
Mun Area 38
|
Monthly EM&A Report (Feb 2016) (CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Mar 2016)
(CV/2013/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun
Road, Tuen Mun
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-331/2009
|
Widening of Tsing
Lun Road, Tuen Mun
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-489/2014
|
Expansion of Hong Kong International
Airport into a Three-Runway System
|
Monthly EM&A Report No.2 (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
EP-226/2005/D
|
Development of an EcoPark
in Tuen Mun Area 38
|
Quarterly EM&A Report (Jan 2016 to Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4942016_content.html
|
|
|
- Yuen Long District
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Quarterly EM&A Report (Nov 2015 to Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail
Link
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail, Phase 1
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
- Kwai Tsing District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Nov
2015 to Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2007/23)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Sep 2015 to Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin
and its Approach Channel
|
Monthly Environmental Monitoring &
Audit Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
- Central & Western District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Nov 2015
to Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2007/23)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Sep 2015 to Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified
as primary/district distributor roads
|
Monthly
EM&A Report (Feb 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Mar 2016)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified
as primary/district distributor roads
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Dec 2015 to Feb 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Monthly EM&A Report (Mar 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Mar 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-313/2008/J
|
West Island Line
|
Monthly EM&A Report(Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4522014_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
Monthly EM&A Report (No.53)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
15th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
16th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-436/2012/D
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4902016_content.html
|
|
|
EP-364/2009/D
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
FEP- 02/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
FEP-07/364/2009/A
|
Central - Wanchai
Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
FEP-09/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
FEP-11/364/2009/B
|
Central - Wan Chai
Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with
Tunnel Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
EP-364/2009/D
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
FEP- 02/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre - Tunnel Works
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
FEP-07/364/2009/A
|
Central - Wanchai
Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
FEP-09/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
FEP-11/364/2009/B
|
Central - Wan Chai
Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with
Tunnel Commissioning (Contract No. HY/2011/08)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
- Wan Chai District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Nov
2015 to Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2007/23)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Sep 2015 to Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly
EM&A Report (Feb 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Feb 2016)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Mar 2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Dec 2015 to Feb 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre
|
Monthly EM&A Report (Mar 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (Mar 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-444/2012/A
|
MTR Wan Chai
Station Lee Tung Street Subway
|
Monthly EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html
|
|
|
EP-436/2012/D
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4902016_content.html
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
EP-364/2009/D
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
FEP- 02/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
FEP-07/364/2009/A
|
Central - Wanchai
Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
FEP-09/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
FEP-11/364/2009/B
|
Central - Wan Chai
Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with
Tunnel Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
EP-364/2009/D
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
FEP- 02/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre - Tunnel Works
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
FEP-07/364/2009/A
|
Central - Wanchai
Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
FEP-09/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
FEP-11/364/2009/B
|
Central - Wan Chai
Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with
Tunnel Commissioning (Contract No. HY/2011/08)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
- Eastern District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Nov
2015 to Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2007/23)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Sep 2015 to Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly
EM&A Report (Feb 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Feb 2016)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
EP-436/2012/D
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4902016_content.html
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Mar 2016)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning
of Cape Collinson Crematorium
|
Monthly EM&A Report(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Hong Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Dec 2015 to Feb 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan Chai
Development Phase II and Central-Wan Chai Bypass
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre
|
Monthly EM&A Report (Mar 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Monthly EM&A Report (Mar 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Monthly EM&A Report (Mar 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are
classified as primary/district distributor roads
|
Monthly EM&A Report (Mar
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
EP-364/2009/D
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
FEP- 02/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
FEP-07/364/2009/A
|
Central - Wanchai
Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
FEP-09/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Monthly EM&A Report (Feb 2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
FEP-11/364/2009/B
|
Central - Wan Chai
Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with
Tunnel Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Feb
2016)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
EP-364/2009/D
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4852015_content.html
|
|
|
FEP-01/364/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A Report (Dec 2015 to Feb 2016)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
FEP- 02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai
Bypass - Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
FEP-07/364/2009/A
|
Central - Wanchai
Bypass Tunnel (North Point Section) and Island Eastern Corridor Link
|
Quarterly EM&A Report (Dec 2015 to Feb 2016)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
FEP-10/364/2009/B
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Tunnel Work
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
FEP-11/364/2009/B
|
Central - Wan Chai
Bypass - Tunnel Buildings, Systems and Fittings, and Works Associated with
Tunnel Commissioning (Contract No. HY/2011/08)
|
Quarterly EM&A Report (Dec 2015 to Feb
2016) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
-
Southern District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Nov
2015 to Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2007/23)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Sep 2015 to Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-487/2014
|
Tai Shue Wan
Development at Ocean Park
|
Monthly EM&A Report (17 Feb 2016 - 16
Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html
|
|
|
EP-436/2012/D
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4902016_content.html
|
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Oct to Dec 2015)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
- Kowloon City District
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Quarterly EM&A Report (Nov 2015 to Jan
2016)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Sep 2015 to Nov 2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Feb 2016)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Mar
2016)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Feb
2016)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Feb
2016)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Quarterly EM&A Report (Sep 2015 to Nov
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Dec 2015 to Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Monthly
EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts
(EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former
Kai Tak Airport
|
Monthly EM&A Report (Mar
2016)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
EP-451/2013
|
Temporary Sewage Pumping Station Ancillary
to Tung Chung Area 56 Public Housing Development
|
Monthly EM&A Report (Mar
2016)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
- Kwun Tong
District
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for Development at
Anderson Road
|
Monthly EM&A Report (Feb 2016)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for
Development at Anderson Road
|
Monthly EM&A Report (Mar
2016)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Quarterly EM&A Report (Nov 2015 to Jan
2016)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Quarterly EM&A Report (Sep 2015 to Nov
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Feb
2016)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Mar
2016)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Feb
2016)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Feb
2016)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Quarterly EM&A Report (Sep 2015 to Nov
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts
(EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former
Kai Tak Airport
|
Monthly EM&A Report (Mar 2016)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
- Sham Shui Po
District
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/23)(Nov
2015 to Jan 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (DC/2007/23)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18)(Sep 2015 to Nov 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/23)(Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
- Wong Tai Sin District
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Quarterly EM&A Report (Nov 2015 to Jan 2016)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Quarterly EM&A Report (Sep 2015 to Nov
2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Feb
2016)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Mar
2016)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Feb
2016)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Feb
2016)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak
Development
|
Quarterly EM&A Report (Sep 2015 to Nov 2015)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal at Kai Tak
|
Quarterly EM&A Report (Dec 2015 to Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts
(EX_GFS Building, Radar Station and Hong Kong Aviation Club) of the Former
Kai Tak Airport
|
Monthly EM&A Report (Mar
2016)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
EP-438/2012/J
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Contamination Assessment Plan for Magazine
Site at TKO Area 137
|
http://www.epd.gov.hk/eia/english/register/index8/vep4952016_content.html
|
|
- Yau Tsim Mong District
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon Subway and Entrances
Modification Works
|
Quarterly EM&A Report (Dec 2015 to Feb
2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
EP-455/2013
|
Proposed Road Improvement Works in West
Kowloon Reclamation Development Phase 1
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Monthly EM&A Report (Mar
2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
EP-453/2013/A
|
Underpass Road and Austin Road Flyover
Serving the West Kowloon Cultural District
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4252014_content.html
|
|
EP-453/2013/A
|
Underpass Road and Austin Road Flyover Serving the West Kowloon
Cultural District
|
Monthly EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4252014_content.html
|
|
EP-436/2012/D
|
Shatin to
Central Link - Hung Hom to Admiralty Section
|
Monthly EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4902016_content.html
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Monthly
EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
EP-317/2009/A
|
Tsim Sha Tsui Station Northern
Subway
|
Monthly EM&A Report (Feb 2016)(Final)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4232014_content.html
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Feb 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Mar 2016)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
EP-438/2012/J
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Contamination Assessment Plan for Magazine
Site at TKO Area 137
|
http://www.epd.gov.hk/eia/english/register/index8/vep4952016_content.html
|
|
|
|
|
|
|
|
|
|