Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the
period between 16 Oct
2013
to 15 Nov
2013)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
Application
for EIA Study Brief
|
|
|
ESB-264/2013
|
Widening of Eastern Section of Lin Ma Hang Road between Tsung Yuen
Ha and Lin Ma Hang
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-264.pdf
|
|
|
ESB-265/2013
|
Footbridge along Yuen Long
Town Nullah between
West Rail Long Ping Station and Kau
Yuk Road
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-265.pdf
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
DIR-232/2013
|
Reuse of Treated
Wastewater for Cooling
Tower make up in
Planned Food Factory at No. 3 Dai Shun Street Tai Po Industrial Estate
|
Decision of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2322013.pdf
|
|
|
Application
for Approval of EIA Report
|
|
|
EIA-212/2013
|
Development of Lok Ma Chau Loop
|
Approval Conditions
|
http://www.epd.gov.hk/eia/register/report/conditions/aeiar2122013.pdf
|
|
|
EIA-213/2013
|
North East New Territories New Development Areas
|
Approval Conditions
|
http://www.epd.gov.hk/eia/register/report/conditions/aeiar2132013.pdf
|
|
|
EIA-219/2013
|
Outlying
Island Sewerage Stage 2 - Upgrading of
Cheung Chau Sewage Collection, Treatment and Disposal Facilities
|
EIA Report
|
http://www.epd.gov.hk/eia/register/report/eiareport/eia_2192013/Main%20page%20html.htm
|
|
|
Application
for Environmental Permit
|
|
|
AEP-454/2013
|
Reprovisioning of FEHD
Sai Yee Street Environmental Hygiene Offices-cum-vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area
|
Environmental Permit issued (EP-454/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4542013.htm
|
|
|
AEP-464/2013
|
Upgrading of San Wai
Sewage Treatment Works (Phase 1)
|
Environmental Permit issued (EP-464/2013)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4642013.htm
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
VEP-413/2013
|
West Rail
|
Environmental Permit issued (FEP-24/004/1998/J)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4132013.htm
|
|
|
VEP-414/2013
|
Liantang / Heung Yuen
Wai Boundary Control Point and Associated Works
|
Environmental
Permit issued (EP-404/2011/A )
|
http://www.epd.gov.hk/eia/register/permit/latest/vep4142013.htm
|
|
|
Application
for Further Environmental Permit
|
|
|
FEP-150/2013
|
Road D15 Linking Lok Shun Path and Tai Po
Roa
|
Environmental Permit issued (FEP-01/092/2001/B)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1502013.htm
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental Submissions
|
|
|
EP-262/2007/B
|
Permanent Aviation Fuel Facility for Hong Kong International
Airport
|
Annual Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep2512008_content.html
|
|
|
EP-438/2012/C
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Construction Noise Mitigation Measures Plan(Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html
|
|
|
EP-438/2012/C
|
Shatin to Central Link - Tai Wai to Hung Hom Section
|
Continuous Noise Monitoring Plan(Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html
|
|
|
EP-404/2011
|
Liantang / Heung Yuen Wai Boundary Control Point and
Associated Works
|
Baseline Monitoring Report Ver.3
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
EP-349/2009/J
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Groundwater Monitoring And Contingency Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan
Chai West (Contract No. HK/2012/08) - Marine Work
|
Silt Screen Deployment Plan
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
EP-349/2009/J
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Updated Ground-borne Noise Prediction Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and
Capping of Contaminated Sediment Disposal Facility to the South of The
Brothers
|
Monthly Progress Report (Jun 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
EP-427/2011/A
|
Dredging, Management and
Capping of Contaminated Sediment Disposal Facility to the South of The
Brothers
|
Monthly Progress Report (Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of
Cape Collinson Crematorium
|
Remediation Report (Version 2.0) (September 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
-
Island District
|
|
|
EP-01/059/2000/C
|
The Theme Park at
Penny's Bay, Lantau
|
95th Monthly
EM&A Report (12 Jul 2013 to 11 Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-352/2009/A
|
Hong
Kong -
Zhuhai - Macao Bridge Hong
Kong Link Road
|
Quarterly
EM&A Report (Feb to May 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3392013_content.html
|
|
|
EP-352/2009/A
|
Hong
Kong -
Zhuhai - Macao Bridge Hong
Kong Link Road
|
Quarterly
EM&A Report (Dec 2012 to Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3392013_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre
at Penny's Bay (part & remaining part)
|
Monthly
Environmental Monitoring and Audit Report (No. 96)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre
at Penny's Bay (part & remaining part)
|
Monthly Environmental
Monitoring and Audit Report (No. 97)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in
Southern Lantau
|
Monthly
Environmental Monitoring & Audit Report (Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in
Southern Lantau
|
Monthly
Environmental Monitoring & Audit Report (May 2013) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in
Southern Lantau
|
Monthly
Environmental Monitoring & Audit Report (Jun 2013) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP-248/2006
|
Lamma Power
Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly
EM&A Report (Apr to Jun 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
EP-287/2007
|
Lamma
Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly
EM&A Report (Apr to Jun 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
EP-071/2000/C
|
1,800MW
Gas-Fired Power Station at Lamma Extension
|
Monthly
Environmental Monitoring and Audit Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
EP-083/2000
|
Conversion
of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly
Environmental Monitoring And Audit Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
EP-353/2009/G
|
Hong Kong -
Zhuhai - Macao Bridge Hong Kong
Boundary Crossing Facilities
|
Monthly
Progress Report(Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road
|
Quarterly
EM&A Report (Mar to May 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-353/2009/C
|
Hong Kong -
Zhuhai - Macao Bridge Hong Kong
Boundary Crossing Facilities
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3432011_content.html
|
|
|
EP-349/2009/J
|
Hong Kong
Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html
|
|
|
-
North District
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway
between Island House Interchange and
Fanling
|
Quarterly Environmental
Monitoring and Audit Report (May to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report
(Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report
(Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements
in Northern New Territories - Package C
|
Monthly
EM&A Report 隆]Jul 2013隆^
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-277/2007/A
|
Drainage
Improvements in Northern New Territories - Package C
|
Monthly
EM&A Report 隆]Aug 2013隆^
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-329/2009
|
Provision of
Cremators at Wo Hop Shek Crematorium
|
Monthly
EM&A Report (Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-329/2009
|
Provision of
Cremators at Wo Hop Shek Crematorium
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-329/2009
|
Provision of
Cremators at Wo Hop Shek Crematorium
|
Quarterly
EM&A Report (May - Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
EP-404/2011
|
Liantang
/ Heung Yuen Wai Boundary Control Point and Associated Works
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway
between Island House Interchange and
Fanling
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html
|
|
|
-
Sai Kung District
|
|
|
FEP-02/428/2011/A
|
Drainage Diversion
Works For the Comprehensive Residential Development At Various Lots In
DD227 & DD229, Tai Po Tsai, Sai Kung
|
11th Monthly
EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index7/fep1422012_content.html
|
|
|
EP-02/410/2010/A
|
Phase III
Redevelopment of The Hong Kong Federation
of Youth Groups Jockey Club Sai Kung Outdoor Training Camp
|
Quarterly
EM&A Report (Apr to Jun 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3972013_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report
(Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-134/2002
|
Fill Bank at
Tseung Kwan O Area 137
|
Monthly
Environmental Monitoring and Audit Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1342002.html
|
|
|
EP-134/2002/J
|
Fill Bank at
Tseung Kwan O Area 137
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
EP-435/2011
|
Sewerage
Works at Pik Shui Sun Tsuen
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html
|
|
|
EP-410/2010
|
Phase III
Redevelopment of The Hong Kong Federation
of Youth Groups Jockey Club Sai Kung Outdoor Training Camp
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4102010_content.html
|
|
|
EP-319/2009/C
|
Development
of a Biodiesel Plant at Tseung Kwan O Industrial Estate
|
Quarterly
Environmental Monitoring & Audit Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3912013_content.html
|
|
|
EP-319/2009/C
|
Development
of a Biodiesel Plant at Tseung Kwan O Industrial Estate
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3912013_content.html
|
|
|
EP-397/2010
|
Renewable
Energy Supply on Town Island (also known as Dawn Island)
|
Quarterly
EM&A Report (Feb 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3972010_content.html
|
|
|
EP-397/2010
|
Renewable
Energy Supply on Town Island (also known as Dawn Island)
|
Quarterly
EM&A Report (May 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3972010_content.html
|
|
|
EP-397/2010
|
Renewable Energy
Supply on Town Island (also known as Dawn Island)
|
Quarterly
EM&A Report (Mar 2013 to May 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3972010_content.html
|
|
|
-
Sha Tin District
|
|
|
NIL
|
|
|
-
Tai Po District
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway
between Island House Interchange and
Fanling
|
Quarterly Environmental Monitoring
and Audit Report (May to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly
Environmental and Audit Report (Jul 2013) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly
Environmental and Audit Report (Jul 2013) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Quarterly
Environmental and Audit Report (Apr to Jun 2013) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-303/2008
|
Drainage
Improvement in Sha Tin and Tai Po
|
Monthly
EM&A Report (Jul 2013) (DC/2009/22)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-303/2008
|
Drainage
Improvement in Sha Tin and Tai Po
|
Monthly
EM&A Report (Jul 2013) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
EM&A Report (Jul 2013) (DC/2007/06)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
EP-404/2011
|
Liantang
/ Heung Yuen Wai Boundary Control Point and Associated Works
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
EP-324/2008
|
Widening of Tolo Highway/Fanling Highway
between Island House Interchange and
Fanling
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/ep3242008_content.html
|
|
|
- Tsuen Wan District
|
|
|
EP-275/2007
|
Drainage Improvement in
Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Apr to Jun 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (May to Jul 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Tuen Mun District
|
|
|
EP-381/2009
|
Tuen Mun
Area 54 Sewage Pumping Station
|
Monthly
EM&A Report (Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-342/2009/C
|
Traffic
Improvements to Tuen Mun Road
Town Centre Section
|
Monthly
EM&A Report(Jul 2013隆^
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-342/2009/C
|
Traffic
Improvements to Tuen Mun Road
Town Centre Section
|
Quarterly
EM&A Report (May 2013 to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-342/2009/C
|
Traffic
Improvements to Tuen Mun Road
Town Centre Section
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point Sewage Treatment Works
|
Quarterly
EM&A Report (May to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point Sewage Treatment Works
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
FEP-01/334/2009/C
|
Sludge
Treatment Facilities
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3872012_content.html
|
|
|
EP-331/2009
|
Widening of Tsing Lun Road,
Tuen Mun
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-210/2005/B
|
Expansion
and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area
54 Sewage Pumping Station
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
- Yuen
Long District
|
|
|
EP-411/2011
|
Improvement to Pok Oi
Interchange
|
Monthly EM&A Report
(Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
FEP-24/004/1998/I
|
West Rail,
Phase 1
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1382012_content.html
|
|
|
EP-349/2009/J
|
Hong Kong
Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html
|
|
|
-
Kwai Tsing District
|
|
|
EP-275/2007
|
Drainage Improvement in
Tsuen Wan and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Apr to Jun 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (May to Jul 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
-
Central & Western District
|
|
|
EP-313/2008/G
|
West Island Line
|
Monthly EM&A Report
No.48
|
http://www.epd.gov.hk/eia/english/register/index8/vep4042013_content.html
|
|
|
EP-313/2008/G
|
West Island Line
|
Monthly EM&A Report
No.49
|
http://www.epd.gov.hk/eia/english/register/index8/vep4042013_content.html
|
|
|
EP-447/2013
|
Decommissioning of the
Magazine Site at Victoria Road
for West Island Line
|
Monthly EM&A Report
No.2
|
http://www.epd.gov.hk/eia/english/register/aep/ep4472013_content.html
|
|
|
EP-408/2011/B
|
Central Police Station
Conservation and Revitalisation Project
|
7th Quarterly EM&A
Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-408/2011/B
|
Central Police Station
Conservation and Revitalisation Project
|
Monthly EM&A Report
(No.22隆^
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-356/2009
|
Wan
Chai Development Phase II and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central -
Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract
No. HY/2009/15 - Marine Works
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line
(Contract no. HK/2010/06) - Marine Work
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan
Chai Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central -
Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract
No. HY/2009/15 - Marine Works
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line
(Contract no. HK/2010/06) - Marine Work
|
Quarterly EM&A Report
(Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Apr to Jun 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (May to Jul 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-286/2007/B
|
The Expansion of
Heliport Facilities at Macau Ferry
Terminal
|
Monthly
EM&A Report No.26
|
http://www.epd.gov.hk/eia/english/register/index8/vep2802008_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation
Phase III
|
Quarterly
EM&A Report (May to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation
Phase III
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
-
Wan Chai District
|
|
|
EP-416/2011
|
ShaTin to
Central Link Protection Works at Causeway
Bay Typhoon Shelter
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-356/2009
|
Wan
Chai Development Phase II and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai
Bypass at Hong Kong Convention and
Exhibition Centre
|
Monthly EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central -
Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract
No. HY/2009/15 - Marine Works
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line
(Contract no. HK/2010/06) - Marine Work
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan
Chai Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central -
Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract
No. HY/2009/15 - Marine Works
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line
(Contract no. HK/2010/06) - Marine Work
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Apr to Jun 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (May to Jul 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation
Phase III
|
Quarterly
EM&A Report (May to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation Phase
III
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
-
Eastern District
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning of
Cape Collinson Crematorium
|
Monthly EM&A Report
(Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-442/2012
|
EMSD Hong Kong Workshop at Sheung On Street, Chai Wan
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html
|
|
|
EP-416/2011
|
ShaTin to
Central Link Protection Works at Causeway
Bay Typhoon Shelter
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-356/2009
|
Wan
Chai Development Phase II and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central -
Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract
No. HY/2009/15 - Marine Works
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line
(Contract no. HK/2010/06) - Marine Work
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-356/2009
|
Wan
Chai Development Phase II and Central-Wan Chai Bypass
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
FEP-02/356/2009
|
Wan
Chai Development Phase II - Central - Wan Chai Bypass at Hong
Kong Convention and Exhibition Centre
|
Quarterly EM&A Report
(Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai East
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central -
Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract
No. HY/2009/15 - Marine Works
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line
(Contract no. HK/2010/06) - Marine Work
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No.
HK/2012/08) - Marine Work
|
Quarterly EM&A
Report (Jun 2013 to Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
EP-401/2010
|
Installation
of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to
North Point for Former
Kai Tak
Airport Development
|
15th Monthly
EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Apr to Jun 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (May to Jul 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-364/2009/A
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3212010_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation
Phase III
|
Quarterly
EM&A Report (May to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
EP-122/2002/D
|
Central Reclamation
Phase III
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2972012_content.html
|
|
|
-
Southern District
|
|
|
EP-287/2007
|
Lamma
Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project
|
Quarterly
EM&A Report (Apr to Jun 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Apr to Jun 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (May to Jul 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
-
Kowloon City District
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report(Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Monthly
EM&A Report(Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Quarterly
EM&A Report (Feb 2013 to Apr 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Quarterly
EM&A Report (Feb 2013 to Apr 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Quarterly EM&A
Report (May 2013 to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping
Stations Serving Kai Tak Development
|
Quarterly
EM&A Report (May 2013 to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report(Aug 2013隆^
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Monthly
EM&A Report(Aug 2013隆^
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report
(Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
EP-328/2009/A
|
Dredging
Works for Proposed Cruise Terminal at Kai Tak
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-401/2010
|
Installation
of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to
North Point for Former
Kai Tak
Airport Development
|
15th Monthly
EM&A Report (Sep 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-437/2012
|
Shatin to
Central Link - Mong Kok East to Hung Hom Section
|
Monthly
EM&A Report No.12 (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-438/2012/C
|
Shatin to
Central Link - Tai Wai to Hung Hom Section
|
Monthly
EM&A Report No.12
|
http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html
|
|
|
-
Kwun Tong District
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report(Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Monthly
EM&A Report(Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Quarterly
EM&A Report (Feb 2013 to Apr 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Quarterly
EM&A Report (Feb 2013 to Apr 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New Distributor
Roads Serving the Planned Kai Tak Development
|
Quarterly
EM&A Report (May 2013 to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Quarterly
EM&A Report (May 2013 to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report(Aug 2013隆^
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Monthly
EM&A Report(Aug 2013隆^
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-328/2009/A
|
Dredging
Works for Proposed Cruise Terminal at Kai Tak
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-140/2002
|
Planning and
Engineering Feasibility Study for Development at Anderson Road
|
Monthly
EM&A Report (Aug 2013隆^
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
-
Sham Shui Po District
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (Apr to Jun 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013)(DC/2007/23,DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report (May to Jul 2013) (DC/2009/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Monthly
EM&A Report (Aug 2013) (DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
-
Wong Tai Sin District
|
|
|
EP-438/2012/C
|
Shatin to
Central Link - Tai Wai to Hung Hom Section
|
Monthly
EM&A Report No.12
|
http://www.epd.gov.hk/eia/english/register/index8/vep4012013_content.html
|
|
|
EP-328/2009/A
|
Dredging
Works for Proposed Cruise Terminal at Kai Tak
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report(Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Monthly
EM&A Report(Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Quarterly
EM&A Report (Feb 2013 to Apr 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping
Stations Serving Kai Tak Development
|
Quarterly
EM&A Report (Feb 2013 to Apr 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Quarterly
EM&A Report (May 2013 to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Quarterly
EM&A Report (May 2013 to Jul 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-337/2009
|
New
Distributor Roads Serving the Planned Kai Tak Development
|
Monthly
EM&A Report(Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage
Pumping Stations Serving Kai Tak Development
|
Monthly
EM&A Report(Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
-
Yau Tsim Mong District
|
|
|
EP-414/2011
|
Reprovision of Bridges
D1 and T in West Kowloon
|
Monthly EM&A Report
(Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-437/2012
|
Shatin to
Central Link - Mong Kok East to Hung Hom Section
|
Monthly
EM&A Report No.12 (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-317/2009
|
Tsim Sha
Tsui Station Northern Subway
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
EP-366/2009/A
|
Road Works
at West Kowloon
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-349/2009/J
|
Hong Kong
Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link
|
Monthly
EM&A Report (Aug 2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4072013_content.html
|
|
|
EP-399/2010/B
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Aug
2013)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3632012_content.html
|
|
|
|
|
|
|
|
|
|