Monthly Update of
Documents Uploaded
Documents Uploaded to the EIAO Website
|
(for the period between 16 Oct 2014 to 15 Nov 2014)
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
Application
for EIA Study Brief
|
|
|
ESB-280/2014
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang
/ Heung Yuen Wai Boundary Control Point Project
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-280.pdf
|
|
|
ESB-281/2014
|
Sai O Trunk Sewer Sewage Pumping Station
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb281/esb281.pdf
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
Nil
|
|
|
Application
for Approval of EIA Report
|
|
|
EIA-223/2014
|
Expansion of Hong Kong International Airport into a
Three-Runway System
|
Approval Conditions
|
http://www.epd.gov.hk/eia/register/report/conditions/aeiar2232014.pdf
|
|
|
Application
for Environmental Permit
|
|
|
AEP-489/2014
|
Expansion of Hong Kong International Airport into a
Three-Runway System
|
Environmental Permit issued (EP-489/2014)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep4892014.htm
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
Nil
|
|
|
Application
for Further Environmental Permit
|
|
|
FEP-157/2014
|
Route 8 between Cheung Sha
Wan to Sha Tin - Entrusted Portion
|
Environmental Permit issued (FEP-01/104/2001/D)
|
http://www.epd.gov.hk/eia/register/permit/latest/fep1572014.htm
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West
(Contract No. HK/2012/08) - Marine Work
|
Landscape
Plan
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-438/2012/H
|
Shatin to
Central Link - Tai Wai to Hung Hom Section
|
Continuous
Noise Monitoring Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
- Island District
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Second Quarterly EM&A Report (Mar to
May 2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-354/2009/B
|
Tuen Mun - Chek Lap Kok Link
|
Monthly EM&A Report (Aug 2014)(HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html
|
|
|
EP-282/2007
|
Outlying Islands Sewerage Stage 1 Phase 1
Part 2 – Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Quarterly EM&A Summary Report (Mar 2014
to May 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
EP-281/2007/A
|
Outlying Islands Sewerage Stage 1 Phase 2 -
Sok Kwu Wan Sewage
Collection, Treatment and Disposal Facilities
|
Monthly EM&A Report (Aug 2014)
(DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Aug
2014)(HY/2011/09 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-352/2009/C
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Link Road
|
Monthly EM&A Report (Aug
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html
|
|
|
EP-353/2009/G
|
Hong Kong - Zhuhai
- Macao Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report (Aug
2014)(HY/2011/03 )
|
http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html
|
|
|
EP-392/2010
|
Improvement of Fresh Water Supply to Cheung
Chau
|
Quarterly EM&A Report (Apr to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html
|
|
|
EP-237/2005/B
|
Drainage Improvements in Southern Lantau
|
Monthly Environmental Monitoring &
Audit Report (Jul 2014) (DP 04/2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental Monitoring and Audit
Report (No. 108)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP- 01/097/2001/C
|
Water Recreation Centre at Penny's Bay
(part & remaining part)
|
Monthly Environmental Monitoring and Audit
Report (No. 109)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
107th Monthly EM&A Report (12 Jul 2014
to 11 Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
108th Monthly EM&A Report (12 Aug 2014
to 11 Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
EP-248/2006
|
Lamma Power Station Units L4 & L5 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Apr to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
EP-287/2007
|
Lamma Power Station - Unit L2 Flue Gas
Desulphurization Plant Retrofit Project
|
Quarterly EM&A Report (Apr to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
- North District
|
|
|
EP-404/2011/A
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
EP-324/2008
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (May
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Jul
2014)(DC/2011/06)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Monthly EM&A Report (Aug
2014)(DC/2011/06)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-430/2011
|
Regulation of Shenzhen River Stage IV
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in Northern New
Territories - Package C
|
Monthly EM&A Report(Jul 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in Northern New
Territories - Package C
|
Monthly EM&A Report(Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
EP-277/2007/A
|
Drainage Improvements in Northern New
Territories - Package C
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html
|
|
|
- Sai Kung
District
|
|
|
EP-448/2013
|
Natural Terrain Hazard Mitigation Works at
Study Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung
|
Monthly EM&A
Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html
|
|
|
EP-435/2011
|
Sewerage Works at Pik
Shui Sun Tsuen
|
Monthly EM&A
Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html
|
|
|
EP-438/2012/G
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report(Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html
|
|
|
- Sha Tin
District
|
|
|
EP-135/2002/J
|
Sha Tin New Town - Stage II TrunkRoad T3 and Associated Roadworks
|
Monthly Environmental Monitoring and Audit
Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4282014_content.html
|
|
|
EP-438/2012/G
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report(Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html
|
|
|
- Tai Po District
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Aug
2014) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-265/2007
|
Tai Po Sewage Treatment Works, Stage V
|
Monthly Environmental and Audit Report (Aug
2014) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
EP-324/2008
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-324/2008/B
|
Widening of Tolo
Highway/Fanling Highway between Island House
Interchange and Fanling
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html
|
|
|
EP-419/2011/A
|
Sediment Removal at Yim
Tin Tsai (East) Fish Culture Zone
|
Monthly Environmental Monitoring and Audit
Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3562012_content.html
|
|
|
- Tsuen Wan District
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2014)
(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Tuen Mun District
|
|
|
EP-321/2008/A
|
Upgrading of Pillar Point Sewage Treatment
Works
|
Quarterly EM&A Report (May 2014 to Jul
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road Town Centre
Section
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road Town Centre
Section
|
Final EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
EP-331/2009
|
Widening of Tsing
Lun Road, Tuen Mun
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Quarterly EM&A Report (May 2014 to Jul
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
EP-381/2009
|
Tuen Mun Area 54 Sewage Pumping Station
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html
|
|
|
FEP-01/334/2009/A
|
Sludge Treatment Facilities
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3452011_content.html
|
|
|
- Yuen Long District
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Quarterly EM&A Report (Apr 2014 to Jul
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
EP-450/2013
|
Construction of Cycle Tracks and the
associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html
|
|
|
FEP-05/347/2009/A
|
Construction of a Secondary Boundary Fence
and new sections of Primary Boundary Fence and Boundary Patrol Road
(Section 3)
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html
|
|
|
EP-411/2011
|
Improvement to Pok
Oi Interchange
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-411/2011
|
Improvement to Pok
Oi Interchange
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-490/2014
|
Drainage Works at Mai Po
|
Monthly EM&A Report(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4902014_content.html
|
|
|
- Kwai Tsing District
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin
and its Approach Channel
|
Monthly Environmental Monitoring &
Audit Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2014)
(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Central & Western District
|
|
|
FEP-02/356/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass
over MTR Tsuen Wan Line (Contract no. HK/2010/06)
- Marine Work
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2014)
(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
Monthly EM&A Report (No.34)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
11th Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-313/2008/I
|
West Island Line
|
Monthly EM&A Report(Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4302014_content.html
|
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
EP-286/2007/B
|
The Expansion of Heliport Facilities at
Macau Ferry Terminal
|
Quarterly EM&A Report (Mar 2014 to Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2802008_content.html
|
|
|
- Wan Chai District
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass at
Hong Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai Development
Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Jun 2014 to Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2014)
(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway
Bay Typhoon Shelter
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
- Eastern District
|
|
|
FEP-02/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition Centre
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
FEP-03/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai East
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
FEP-04/356/2009
|
Central - Wan Chai
Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No.
HY/2009/15 - Marine Works
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
FEP-05/356/2009
|
Wan Chai
Development Phase II - Central-Wan Chai Bypass
over MTR Tsuen Wan Line (Contract no. HK/2010/06)
- Marine Work
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
FEP-06/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
FEP-07/356/2009
|
Wan Chai
Development Phase II - Central - Wan Chai Bypass
at Wan Chai West (Contract No. HK/2012/08) -
Marine Work
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2014)
(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at
Causeway Bay Typhoon Shelter
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former Kai Tak Airport Development
|
27th
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former Kai Tak Airport Development
|
9th
Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
FEP-01/335/2009
|
Phased Reprovisioning
of Cape Collinson Crematorium
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
EP-364/2009/B
|
Central-Wanchai
Bypass (CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html
|
|
|
- Southern District
|
|
|
EP-407/2010/E
|
South Island Line (East)
|
Monthly EM&A Report(Oct
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2014)
(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Kowloon City District
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Jul
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Jul 2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Quarterly EM&A Report (May 2014 to Jul
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Aug
2014)(KL/2012/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Aug
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned
Kai Tak Development
|
Monthly EM&A Report (Aug
2014)(KL/2012/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Jul
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Quarterly EM&A Report (May 2014 to Jul
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-344/2009
|
New Sewage Pumping Stations Serving Kai Tak Development
|
Monthly EM&A Report (Aug
2014)(KL/2010/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former Kai Tak Airport Development
|
27th
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and
Associated Facilities from To Kwa Wan to North
Point for Former Kai Tak Airport Development
|
9th
Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report No.24 (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-438/2012/G
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report(Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html
|
|
|
- Kwun Tong
District
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Monthly EM&A Report (Aug
2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Monthly EM&A Report (Jul
2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study
for Development at Anderson Road
|
Monthly EM&A Report (Aug
2014)(CV/2007/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-140/2002
|
Planning and Engineering Feasibility Study for
Development at Anderson Road
|
Monthly EM&A Report (Sep
2014)(CV/2012/07)
|
http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-409/2010
|
Yau Tong Bay - Decommissioning of Shipyard
Sites
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html
|
|
|
- Sham Shui Po District
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2007/24)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2009/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A
Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/23)(Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report (DC/2007/24)(Apr
to Jun 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
EP-322/2008/F
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (Sep 2014)
(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html
|
|
|
- Wong Tai Sin District
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly EM&A Report (Jun 2014 to Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-328/2009/A
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
EP-438/2012/G
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report(Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html
|
|
|
- Yau Tsim Mong District
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West
Kowloon
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West
Kowloon
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
EP-317/2009
|
Tsim Sha Tsui Station Northern Subway
|
Monthly EM&A Report (Sep
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-436/2012/A
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report No.24 (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou -
Shenzhen - Hong Kong Express Rail Link
|
Monthly EM&A Report (Aug
2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
EP-438/2012/G
|
Shatin to Central Link - Tai Wai
to Hung Hom Section
|
Monthly EM&A Report(Aug 2014)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html
|
|
|
|
|
|
|
|
|
|