Monthly Update of Documents Uploaded

 

       Documents Uploaded to the EIAO Website

       (for the period between 16 Oct 2014 to 15 Nov 2014)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

ESB-280/2014

Operation of the Existing Tai Lam Explosives Magazine at Tai Shu Ha, Yuen Long for Liantang / Heung Yuen Wai Boundary Control Point Project

EIA Study Brief

http://www.epd.gov.hk/eia/register/study/latest/esb-280.pdf

 

 

ESB-281/2014

Sai O Trunk Sewer Sewage Pumping Station

Project Profile

http://www.epd.gov.hk/eia/register/profile/latest/esb281/esb281.pdf

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

Nil

 

 

Application for Approval of EIA Report

 

 

EIA-223/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Approval Conditions

http://www.epd.gov.hk/eia/register/report/conditions/aeiar2232014.pdf

 

 

Application for Environmental Permit

 

 

AEP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Environmental Permit issued (EP-489/2014)

http://www.epd.gov.hk/eia/register/permit/latest/ep4892014.htm

 

 

Application for Variation of an Environmental Permit

 

 

Nil

 

 

Application for Further Environmental Permit

 

 

FEP-157/2014

Route 8 between Cheung Sha Wan to Sha Tin - Entrusted Portion

Environmental Permit issued (FEP-01/104/2001/D)

http://www.epd.gov.hk/eia/register/permit/latest/fep1572014.htm

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Landscape Plan

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

EP-438/2012/H

Shatin to Central Link - Tai Wai to Hung Hom Section

Continuous Noise Monitoring Plan

http://www.epd.gov.hk/eia/english/register/index8/vep4532014_content.html

 

 

Submission as required by Environmental Permit Condition - EM&A Reports

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP-354/2009/B 

Tuen Mun - Chek Lap Kok Link

Second Quarterly EM&A Report (Mar to May 2014)HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html

 

 

EP-354/2009/B 

Tuen Mun - Chek Lap Kok Link

Monthly EM&A Report (Aug 2014)HY/2012/08)

http://www.epd.gov.hk/eia/english/register/index8/vep4262014_content.html

 

 

EP-282/2007

Outlying Islands Sewerage Stage 1 Phase 1 Part 2 – Yung Shue Wan Sewerage, Sewage Treatment Works and Outfall

Quarterly EM&A Summary Report (Mar 2014 to May 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html

 

 

EP-281/2007/A 

Outlying Islands Sewerage Stage 1 Phase 2 - Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities

Monthly EM&A Report (Aug 2014) (DC/2009/13)

http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html

 

 

EP-352/2009/C

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report (Aug 2014)(HY/2011/09 )

http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html

 

 

EP-352/2009/C

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report (Aug 2014)(HY/2011/03 )

http://www.epd.gov.hk/eia/english/register/index8/vep4112013_content.html

 

 

EP-353/2009/G

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report (Aug 2014)(HY/2011/03 )

http://www.epd.gov.hk/eia/english/register/index8/vep4102013_content.html

 

 

EP-392/2010

Improvement of Fresh Water Supply to Cheung Chau

Quarterly EM&A Report (Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep3922010_content.html

 

 

EP-237/2005/B

Drainage Improvements in Southern Lantau

Monthly Environmental Monitoring & Audit Report (Jul 2014) (DP 04/2012)

http://www.epd.gov.hk/eia/english/register/index8/vep2832007_content.html

 

 

EP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 108)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP- 01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 109)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

107th Monthly EM&A Report (12 Jul 2014 to 11 Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

108th Monthly EM&A Report (12 Aug 2014 to 11 Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

EP-248/2006

Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project

Quarterly EM&A Report (Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html

 

 

EP-287/2007

Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project

Quarterly EM&A Report (Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html

 

 

- North District

 

 

EP-404/2011/A

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html

 

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html

 

 

EP-324/2008/B

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html

 

 

EP-324/2008/B

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-430/2011

Regulation of Shenzhen River Stage IV

Monthly EM&A Report (May 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html

 

 

EP-430/2011

Regulation of Shenzhen River Stage IV

Monthly EM&A Report (Jun 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html

 

 

EP-430/2011

Regulation of Shenzhen River Stage IV

Monthly EM&A Report (Jul 2014)(DC/2011/06)

http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html

 

 

EP-430/2011

Regulation of Shenzhen River Stage IV

Monthly EM&A Report (Aug 2014)(DC/2011/06)

http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html

 

 

EP-430/2011

Regulation of Shenzhen River Stage IV

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4302011_content.html

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report(Jul 2014

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Monthly EM&A Report(Aug 2014

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

EP-277/2007/A

Drainage Improvements in Northern New Territories - Package C

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3052009_content.html

 

 

- Sai Kung District

 

 

EP-448/2013

Natural Terrain Hazard Mitigation Works at Study Area No. 12NW-C/SA1 above Leung Fai Tin along Clear Water Bay Road, Sai Kung

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4482013_content.html

 

 

EP-435/2011

Sewerage Works at Pik Shui Sun Tsuen

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4352011_content.html

 

 

EP-438/2012/G

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html

 

 

- Sha Tin District

 

 

EP-135/2002/J 

Sha Tin New Town - Stage II TrunkRoad T3 and Associated Roadworks

Monthly Environmental Monitoring and Audit Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4282014_content.html

 

 

EP-438/2012/G

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html

 

 

- Tai Po District

 

 

EP-265/2007

Tai Po Sewage Treatment Works, Stage V

Monthly Environmental and Audit Report (Aug 2014) (DE/2009/09)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

 

EP-265/2007

Tai Po Sewage Treatment Works, Stage V

Monthly Environmental and Audit Report (Aug 2014) (DC/2009/09)

http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html

 

 

EP-324/2008

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep3242008_content.html

 

 

EP-324/2008/B

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html

 

 

EP-324/2008/B

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4292014_content.html

 

 

EP-419/2011/A

Sediment Removal at Yim Tin Tsai (East) Fish Culture Zone

Monthly Environmental Monitoring and Audit Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3562012_content.html

 

 

- Tsuen Wan District

 

 

EP-349/2009/L

 Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2007/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2014) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Tuen Mun District

 

 

EP-321/2008/A

Upgrading of Pillar Point Sewage Treatment Works

Quarterly EM&A Report (May 2014 to Jul 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3982013_content.html

 

 

EP-349/2009/L

 Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

 

EP-342/2009/C

 Traffic Improvements to Tuen Mun Road Town Centre Section

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html

 

 

EP-342/2009/C

 Traffic Improvements to Tuen Mun Road Town Centre Section

Final EM&A Report

http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html

 

 

EP-331/2009 

Widening of Tsing Lun Road, Tuen Mun

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html

 

 

EP-381/2009

 Tuen Mun Area 54 Sewage Pumping Station

Quarterly EM&A Report (May 2014 to Jul 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html

 

 

EP-381/2009

 Tuen Mun Area 54 Sewage Pumping Station

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep3812009_content.html

 

 

FEP-01/334/2009/A

Sludge Treatment Facilities

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3452011_content.html

 

 

- Yuen Long District

 

 

EP-450/2013

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html

 

 

EP-450/2013

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Quarterly EM&A Report (Apr 2014 to Jul 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html

 

 

EP-450/2013

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4502013_content.html

 

 

FEP-05/347/2009/A

Construction of a Secondary Boundary Fence and new sections of Primary Boundary Fence and Boundary Patrol Road (Section 3)

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1392012_content.html

 

 

EP-411/2011

Improvement to Pok Oi Interchange

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html

 

 

EP-411/2011

Improvement to Pok Oi Interchange

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4112011_content.html

 

 

EP-349/2009/L

 Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

 

EP-490/2014 

Drainage Works at Mai Po

Monthly EM&A Report(Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4902014_content.html

 

 

- Kwai Tsing District

 

 

EP-349/2009/L

 Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

 

EP-426/2011/A

Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel

Monthly Environmental Monitoring & Audit Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2007/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2014) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Central & Western District

 

 

FEP-02/356/2009

 Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2007/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2014) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-408/2011/B

Central Police Station Conservation and Revitalisation Project

Monthly EM&A Report (No.34)

http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html

 

 

EP-408/2011/B

Central Police Station Conservation and Revitalisation Project

11th Quarterly EM&A Report

http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-313/2008/I

West Island Line

Monthly EM&A Report(Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4302014_content.html

 

 

EP-407/2010/E

South Island Line (East)

Monthly EM&A Report(Oct 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html

 

 

EP-286/2007/B

The Expansion of Heliport Facilities at Macau Ferry Terminal

Quarterly EM&A Report (Mar 2014 to Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2802008_content.html

 

 

- Wan Chai District

 

 

FEP-02/356/2009

 Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2007/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2014) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-407/2010/E

South Island Line (East)

Monthly EM&A Report(Oct 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html

 

 

- Eastern District

 

 

FEP-02/356/2009

 Wan Chai Development Phase II - Central - Wan Chai Bypass at Hong Kong Convention and Exhibition Centre

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html

 

 

FEP-03/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai East

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

FEP-05/356/2009

Wan Chai Development Phase II - Central-Wan Chai Bypass over MTR Tsuen Wan Line (Contract no. HK/2010/06) - Marine Work

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html

 

 

FEP-06/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2007/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2014) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-416/2011

ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html

 

 

EP-401/2010

Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development

27th Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html

 

 

EP-401/2010

Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development

9th Quarterly EM&A Report

http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html

 

 

FEP-01/335/2009

Phased Reprovisioning of Cape Collinson Crematorium

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index7/fep1092010_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-364/2009/B

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html

 

 

EP-364/2009/B

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3742012_content.html

 

 

- Southern District

 

 

EP-407/2010/E

South Island Line (East)

Monthly EM&A Report(Oct 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4512014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2007/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2014) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Kowloon City District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2014)(KL/2012/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Jul 2014)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Quarterly EM&A Report (May 2014 to Jul 2014)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Aug 2014)(KL/2012/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Aug 2014)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (Aug 2014)(KL/2012/02)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Jul 2014)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Quarterly EM&A Report (May 2014 to Jul 2014)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-344/2009 

New Sewage Pumping Stations Serving Kai Tak Development

Monthly EM&A Report (Aug 2014)(KL/2010/03)

http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html

 

 

EP-401/2010

Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development

27th Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html

 

 

EP-401/2010

Installation of Submarine Gas Pipelines and Associated Facilities from To Kwa Wan to North Point for Former Kai Tak Airport Development

9th Quarterly EM&A Report

http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-437/2012

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report No.24 (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

 

EP-438/2012/G

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html

 

 

- Kwun Tong District

 

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Monthly EM&A Report (Aug 2014)(CV/2012/07)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Monthly EM&A Report (Jul 2014)(CV/2007/03)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Monthly EM&A Report (Aug 2014)(CV/2007/03)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

 

EP-140/2002

Planning and Engineering Feasibility Study for Development at Anderson Road

Monthly EM&A Report (Sep 2014)(CV/2012/07)

http://www.epd.gov.hk/eia/english/register/aep/ep1402002_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-409/2010

Yau Tong Bay - Decommissioning of Shipyard Sites

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4092010_content.html

 

 

- Sham Shui Po District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2007/24)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2009/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report(DC/2007/23,DC/2009/10,DC/2009/17, DC/2009/18,DC/2009/19)(Mar to May 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (DC/2009/23)(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Quarterly EM&A Report (DC/2007/24)(Apr to Jun 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

EP-322/2008/F

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (Sep 2014) (DC/2008/09)

http://www.epd.gov.hk/eia/english/register/index8/vep3752012_content.html

 

 

- Wong Tai Sin District

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Quarterly EM&A Report (Jun 2014 to Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-328/2009/A

Dredging Works for Proposed Cruise Terminal at Kai Tak

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html

 

 

EP-438/2012/G

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html

 

 

- Yau Tsim Mong District

 

 

EP-440/2012

MTR Tsim Sha Tsui Station Carnarvon Subway and Entrances Modification Works

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html

 

 

EP-366/2009/A

 Road Works at West Kowloon

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html

 

 

EP-414/2011

Reprovision of Bridges D1 and T in West Kowloon

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html

 

 

EP-414/2011

Reprovision of Bridges D1 and T in West Kowloon

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html

 

 

EP-317/2009

Tsim Sha Tsui Station Northern Subway

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep3172009_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-436/2012/A

Shatin to Central Link - Hung Hom to Admiralty Section

Monthly EM&A Report (Sep 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4332014_content.html

 

 

EP-437/2012

Shatin to Central Link - Mong Kok East to Hung Hom Section

Monthly EM&A Report No.24 (Aug 2014)

http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html

 

 

EP-349/2009/L

 Hong Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link

Monthly EM&A Report (Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html

 

 

EP-438/2012/G

Shatin to Central Link - Tai Wai to Hung Hom Section

Monthly EM&A Report(Aug 2014)

http://www.epd.gov.hk/eia/english/register/index8/vep4502014_content.html