Monthly Update of Documents Uploaded
Documents Uploaded to the EIAO
Website
|
|
(for the period between 16 Oct 2017 to 15 Nov 2017)
|
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
|
ESB-303/2017
|
Shuen Wan Golf Course
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/study/latest/esb-303.pdf
|
|
|
|
|
ESB-304/2017
|
Drainage Improvement Works in Ha Wan Tsuen and Lok Ma Chau Tsuen
|
Project Profile
|
http://www.epd.gov.hk/eia/register/profile/latest/esb304/esb304.pdf
|
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
|
DIR-257/2017
|
Fanling North Temporary Sewage Pumping Station
|
EIA Study Brief
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2572017.pdf
|
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
|
Nil
|
|
|
|
|
Application
for Environmental Permit
|
|
|
|
|
AEP-545/2017
|
Decommissioning
and Disposal of Clinical Waste In cinerators at
Block K, Queen Mary Hospital
|
Environmental Permit issued (EP-545/2017)
|
http://www.epd.gov.hk/eia/register/permit/latest/ep5452017.htm
|
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
|
Nil
|
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
|
Nil
|
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
|
EP-129/2002/B
|
Sheung Shui to Lok Ma Chau Spur Line
|
Habitat
Creation and Management Plan (Sept 2006)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1282017.html
|
|
|
|
|
EP-270/2007
|
Main
Drainage Channels and Poldered Village Protection
Schemes for San Tin, NWNT Phase 3, Part 1 - Eastern Main Drainage Channel
for San Tin
|
Ecological Habitat Management
Plan(Final)(Nov 2001)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2702007_content.html
|
|
|
|
|
EP-163/2003
|
Deep Bay
Link and Widening of Yuen Long Highway between Lam Tei
and Shap Pat Heung Interchange ( Lam Tei to Tan Kwai Tsuen Section )
|
Habitat Creation and Management
Plan
|
http://www.epd.gov.hk/eia/english/register/aep/ep1632003_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Project Layout Plan for C5
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Topsoil Management Plan
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Updated Topsoil Management Plan
for C6
|
http://www.epd.gov.hk/eia/english/register/aep/ep4042011_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Archaelogical Survey
Report for C5
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Photographic
and Cartographic Survey Report for C5
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Photographic
and Cartographic Survey Report for C2
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
WMP for C5
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
WMP for C3
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
CAP - Fanling
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
CAR - Fanling
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
CAP - Po
Kat Tsai and Loi Tung
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
CAR - Po
Kat Tsai and Loi Tung
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Project
Layout Plan for C2
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Landscape
Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/A
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Updated
Topsoil Management Plan for C2
|
http://www.epd.gov.hk/eia/english/register/index8/vep4142013_content.html
|
|
|
|
|
EP-404/2011/B
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Updated
Topsoil Management Plan for C5
|
http://www.epd.gov.hk/eia/english/register/index8/vep4582014_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Archaeological
Survey Report for C2 and C3
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Archaeological
Survey Report for C6
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Photographic
and Cartographic Survey Report for C6
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
WMP for C2
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
WMP for C6
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Project
Layout Plan for C7
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Vegetation
Survey Report (Revision 4)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
WCA
(Revision 1)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/C
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Habitat
Creation and Management Plan (Revision 2)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4662015_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
EM&A Programme - Revision 7
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
Post-Construction Ecological Monitoring Report (No.31)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
Post-Construction Ecological Monitoring Report (No.32)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
Post-Construction Ecological Monitoring Report (No.33)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
Post-Construction Ecological Monitoring Report (No.34)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Detailed Ecological Monitoring Report (No.3)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Detailed Ecological Monitoring Report (No.4)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung
Yuen Wai Boundary Control Point and Associated
Works
|
Woodland
Compensation Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
Post-Construction Ecological Monitoring Report (No.35)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
|
EP-223/2005/A
|
Drainage
Improvement Works in Upper Tai Po River
|
Monthly
Post-Construction Ecological Monitoring Report (No.36)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2732009.html
|
|
|
|
|
EP-427/2011/A
|
Dredging,
Management and Capping of Contaminated Sediment Disposal Facility to the
South of The Brothers
|
Monthly
Progress Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3492011_content.html
|
|
|
|
|
EP-312/2008/A
|
Disposal
of Contaminated Sediment - Dredging, Management and Capping of sediment
Disposal Facility at Sha Chau
|
Monthly
Progress Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2742009_content.html
|
|
|
|
|
EP-454/2013
|
Reprovisioning of FEHD Sai
Yee Street Vehicle Depot at Yen Ming Road, West Kowloon Reclamation Area
|
Submission
of Environmental Impact Monitoring Report(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4542013_content.html
|
|
|
|
|
EP-537/2017
|
Proposed
Extension of Academic Block, The Swire Institute of Marine Science, Faculty
of Science, The University of Hong Kong, Cape D’Aguilar
Road, Shek O
|
Submission
of the Verification Survey Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html
|
|
|
|
|
EP-489/2014
|
Expansion
of Hong Kong International Airport into a Three-Runway System
|
Construction
Phase Monthly EM&A Report No.21
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
FEP-05/039/2000/F
|
East Rail
Extensions - Tai Wai to Ma On Shan
|
Monthly
Noise Monitoring Report No.9(Oct 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1322012_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong
Kong Section of Guangzhou - Shenzhen - Hong Kong Express Rail Link
|
Tree
Planting and Landscape Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area
Treatment Scheme (HATS) Stage 2A
|
Consolidated
Baseline Odour Report (DC/2009/17)(Oct 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
FEP-01/334/2009/E
|
Sludge
Treatment Facilities
|
Environmental
Monitoring Results in Operation Phase - Landfill Gas Monitoring (Oct 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4932016_content.html
|
|
|
|
|
EP-489/2014
|
Expansion
of Hong Kong International Airport into a Three-Runway System
|
Submission
of Supplementary Contamination Assessment Plan
|
http://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html
|
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Report
|
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
|
- Island District
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
47th Monthly Environmental Monitoring and
Audit Report (Oct 2017)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Sep 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental
Monitoring and Audit Report (Sep 2017) (HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Sep 2017) (HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (May 2017 to Jun 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly EM&A Report(Sep 2017)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Quarterly Environmental Monitoring and Audit
Report (Dec 2016 to Feb 2017) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Sep 2017) (HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Sep 2017) (HY/2014/05)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Sep 2017)(HY/2013/04)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Sep 2017) (HY/2013/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-353/2009/K
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Boundary Crossing Facilities
|
Monthly Environmental Monitoring and Audit
Report (Sep 2017) (HY/2013/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html
|
|
|
|
|
EP-507/2016
|
Installation of One additional
gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power
Station
|
Monthly EM&A Report no.10
|
http://www.epd.gov.hk/eia/english/register/aep/ep5072016_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A
Report(Sep 2017) (HY/2011/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Monthly EM&A Report(Sep 2017)
(HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
EP-352/2009/D
|
Hong Kong - Zhuhai - Macao
Bridge Hong Kong Link Road
|
Quarterly Environmental Monitoring and
Audit Report (Dec 2016 to Feb 2017) (HY/2011/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html
|
|
|
|
|
FEP-01/395/2010/C
|
Organic Waste Treatment Facilities, Phase I
|
Twenty-eighth Monthly EM&A Summary Report(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly Environmental Monitoring and Audit Report Unit
L10 (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
EP-071/2000/C
|
1,800MW Gas-Fired Power Station at LammaExtension
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
|
EP-083/2000
|
Conversion of Two Existing Gas Turbines (GT5 & GT7) into
a Combined Cycle Unit
|
Monthly Environmental Monitoring And Audit Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
|
EP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part &
remaining part)
|
Monthly Environmental Monitoring and Audit Report (No. 146)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
|
EP-01/059/2000/C
|
The Theme Park at Penny's Bay, Lantau
|
145th Monthly EM&A Report (12 Sep 2017 to 11 Oct
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html
|
|
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.10
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
|
|
- North District
|
|
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further
Expansion at Fanling North New Development Area
|
Monthly EM&A Report(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further
Expansion at Fanling North New Development Area
|
Quarterly EM&A Report(Jul 2017 to Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-404/2011/D
|
Liantang / Heung Yuen Wai
Boundary Control Point and Associated Works
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html
|
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang
/ Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report (Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
|
|
- Sai Kung
District
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Monthly EM&A Report
(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Final EM&A Report
(Part 2)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Sep 2017) (version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-134/2002/K
|
Fill Bank at Tseung Kwan O Area 137
|
Monthly EM&A Report (Sep 2017)(CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3892013_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
EP-319/2009/D
|
Development of a Biodiesel Plant at Tseung
Kwan O Industrial Estate
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html
|
|
|
|
|
- Sha Tin
District
|
|
|
|
|
EP-494/2015
|
In-situ Reprovisioning of
Sha Tin Water Treatment Works - South Works
|
Monthly EM&A Report No.19
|
http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Tai Po District
|
|
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further
Expansion at Fanling North New Development Area
|
Monthly EM&A Report(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
|
|
FEP-01/474/2013
|
NENT - Shek Wu Hui Sewage Treatment Works - Further
Expansion at Fanling North New Development Area
|
Quarterly EM&A Report(Jul 2017 to Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1522014_content.html
|
|
|
|
|
- Tsuen Wan District
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly
EM&A Report(Jun 2017 to Aug 2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
- Tuen Mun District
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
47th Monthly Environmental Monitoring and
Audit Report (Oct 2017)(HY/2012/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Sep 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly Environmental Monitoring and Audit
Report (Sep 2017) (HY/2012/08)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Monthly
Environmental Monitoring and Audit Report (Sep 2017) (HY/2010/02)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-354/2009/D
|
Tuen Mun - Chek Lap Kok Link
|
Quarterly Environmental Monitoring and
Audit Report (May 2017 to Jun 2017)(HY/2013/12)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-068/2000/A
|
Tuen Mun Sewerage - Eastern Coastal
Sewerage Extension
|
Monthly EM&A Report (Sep 2017)(DC/2014/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4712015_content.html
|
|
|
|
|
EP-210/2005/B
|
Expansion and Extension of Fill Bank at Tuen Mun Area 38
|
Monthly EM&A Report (Sep 2017) (CV/2015/07)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3952013_content.html
|
|
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.10
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
|
|
- Yuen Long District
|
|
|
|
|
FEP-01/507/2016
|
Installation of One additional gas-fired generation unit
(CCGT Unit No. 1) at the Black Point Power Station
|
Monthly EM&A Report no.10
|
http://www.epd.gov.hk/eia/english/register/index7/fep1732016_content.html
|
|
|
|
|
EP-311/2008/D
|
Proposed Comprehensive Development at Wo
Shang Wai, Yuen Long
|
Monthly EM&A Report(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3932013_content.html
|
|
|
|
|
EP-450/2013/A
|
Construction of Cycle Tracks and the associated
Supporting Facilities from Sha Po Tsuen to Shek Sheung River
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html
|
|
|
|
|
EP-501/2015
|
Construction of Cycle Tracks and the associated Supporting
Facilities from Sha Po Tsuen
to Shek Sheung River
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5012015_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-502/2015/A
|
Operation of the Existing Tai Lam Explosives Magazine at
Tai Shu Ha, Yuen Long for Liantang
/ Heung Yuen Wai Boundary Control Point Project
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5052016_content.html
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Quarterly EM&A Report (May 2017 to Jul 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
EP-464/2013
|
Expansion of Ha Tsuen Sewage
Pumping Station
|
Monthly EM&A
Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html
|
|
|
|
|
EP-500/2015
|
Comprehensive Development and Wetland Protection near Yau Mei San Tsuen
|
Baseline Ecological Monitoring Report (August 2015 - July 2016)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5002015_content.html
|
|
|
|
|
EP-226/2005/E
|
Development of an EcoPark in Tuen Mun Area 38
|
Quarterly EM&A Report (Jul 2017 to Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5322017_content.html
|
|
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new
sections of Primary Boundary Fence and Boundary Patrol Road
|
Monthly EM&A Report
(Oct 2015)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
|
|
- Kwai Tsing District
|
|
|
|
|
EP-426/2011/A
|
Providing Sufficient Water Depth for Kwai Tsing Container Basin and its Approach Channel
|
Monthly Environmental Monitoring & Audit Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3692012_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jun 2017 to Aug
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
- Central & Western District
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-408/2011/C
|
Central Police Station Conservation and Revitalisation
Project
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4992016_content.html
|
|
|
|
|
EP-520/2016
|
Agreement No. CE 24/2012 (GE) Landslip Prevention and
Mitigation Programme, 2012, Package A Landslip
Prevention and Mitigation Works - Investigation, Design and Construction -
Landslip Prevention and Mitigation Works at Feature Nos. 11SW-A/R94 and
11SW-A/FR218, Caine Lane, Mid-Levels
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep5202016_content.html
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A
Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly
EM&A Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Quarterly
EM&A Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Quarterly
EM&A Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly
EM&A Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Quarterly
EM&A Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly
EM&A Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly
EM&A Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Quarterly
EM&A Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly
EM&A Report (Jun 2017 to Aug 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report
(Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development Phase
II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report No.75
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jun 2017 to Aug
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-408/2011/B
|
Central Police Station Conservation and Revitalisation Project
|
23rd Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
|
- Wan Chai District
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-444/2012/A
|
MTR Wan Chai Station Lee Tung
Street Subway
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4412014_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report No.75
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jun 2017 to Aug
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
- Eastern District
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Quarterly EM&A Report (Jun 2017 to Aug 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-364/2009/E
|
Central-Wanchai Bypass
(CWB) including its road tunnel and slip roads
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5122016_content.html
|
|
|
|
|
FEP-01/364/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East(CWB Tunnel)
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1062010_content.html
|
|
|
|
|
FEP-02/364/2009
|
Wan Chai Development
Phase II - Central - Wan Chai Bypass at Hong Kong
Convention and Exhibition Centre - Tunnel Works
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1082010_content.html
|
|
|
|
|
FEP-05/364/2009/A
|
Central - Wan Chai Bypass
- Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1162010_content.html
|
|
|
|
|
FEP-06/364/2009/A
|
Central - Wan Chai Bypass -
Central Interchange (Contract No. HY/2009/18)
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1182010_content.html
|
|
|
|
|
FEP-07/364/2009/D
|
Central - Wanchai Bypass
Tunnel (North Point Section) and Island Eastern Corridor Link
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1202011_content.html
|
|
|
|
|
FEP-09/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1442013_content.html
|
|
|
|
|
FEP-10/364/2009/B
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Tunnel Work
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1482013_content.html
|
|
|
|
|
FEP-11/364/2009/E
|
Central - Wan Chai Bypass
- Tunnel Buildings, Systems and Fittings, and Works Associated with Tunnel
Commissioning (Contract No. HY/2011/08)
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1552014_content.html
|
|
|
|
|
FEP-12/364/2009/D
|
Central-Wanchai Bypass (CWB)
including its road tunnel and slip roads
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1712016_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Hong Kong Convention
and Exhibition Centre
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai East
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Central - Wan Chai Bypass -
Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 -
Marine Works
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-06/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1452013_content.html
|
|
|
|
|
FEP-07/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly
EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html
|
|
|
|
|
FEP-08/356/2009
|
Wan Chai Development Phase II -
Central - Wan Chai Bypass at Wan Chai West (Contract No. HK/2012/08) - Marine Work
|
Monthly EM&A Report (Sep 2017) (HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1722016_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Sep 2017) (version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
EP-376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html
|
|
|
|
|
FEP-01/376/2009
|
DP2-Road P2 and other roads which are classified as
primary/district distributor roads
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1612015_content.html
|
|
|
|
|
FEP-02/376/2009
|
DP2-Road P2 and other roads which are classified as primary/district
distributor roads
|
Monthly EM&A Report (Sep 2017)
(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1702016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-122/2002/E
|
Central Reclamation Phase III
|
Monthly EM&A Report (Sep
2017)(HK/2015/01)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jun 2017 to Aug
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
- Southern District
|
|
|
|
|
EP-407/2010/F
|
South Island Line (East)
|
Monthly EM&A Report No.75
|
http://www.epd.gov.hk/eia/english/register/index8/vep5082016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-487/2014
|
Tai Shue Wan
Development at Ocean Park
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4872014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jun 2017 to Aug
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
- Kowloon City District
|
|
|
|
|
EP-451/2013
|
Trunk Road T2
|
Monthly EM&A Report (Sep 2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Sep
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Sep
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Monthly EM&A
Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Final EM&A Report (Part 2)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Kwun Tong
District
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Sep
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Sep 2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-458/2013/C
|
Tseung Kwan O – Lam Tin Tunnel and Associated Works
|
Monthly EM&A Report (Sep 2017) (version
1.0)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html
|
|
|
|
|
- Sham Shui Po
District
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jun 2017 to Aug
2017) (DC/2009/10, DC/2009/17, DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/20)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A
Report(DC/2009/10,DC/2009/17,DC/2009/18)(Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
EP-322/2008/G
|
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Monthly EM&A Report (DC/2009/24)(Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html
|
|
|
|
|
- Wong Tai Sin District
|
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the Planned Kai Tak
Development
|
Monthly EM&A Report (Sep
2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
|
EP-339/2009/A
|
Decommissioning of the Remaining Parts (EX_GFS Building,
Radar Station and Hong Kong Aviation Club) of the Former Kai Tak Airport
|
Monthly EM&A Report (Sep 2017)(KL/2014/03)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2882009_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
- Yau
Tsim Mong District
|
|
|
|
|
EP-453/2013/B
|
Underpass Road and Austin Road Flyover
Serving the West Kowloon Cultural District
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html
|
|
|
|
|
EP-436/2012/E
|
Shatin to Central Link - Hung Hom
to Admiralty Section
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5102016_content.html
|
|
|
|
|
EP-349/2009/L
|
Hong Kong Section of Guangzhou - Shenzhen -
Hong Kong Express Rail Link
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4392014_content.html
|
|
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-399/2010/D
|
Kwun Tong Line Extension
|
Final EM&A Report (Part 2)
|
http://www.epd.gov.hk/eia/english/register/index8/vep4922016_content.html
|
|
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong
Kok East to Hung Hom
Section
|
Monthly EM&A Report (Sep
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
|
|
EP-414/2011
|
Reprovision of Bridges D1 and T in West Kowloon
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
EP-455/2013
|
Proposed Road Improvement Works in West
Kowloon Reclamation Development Phase 1
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4552013_content.html
|
|
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon
Subway and Entrances Modification Works
|
Quarterly EM&A Report (Jun 2017 to Aug
2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
|
|
EP-440/2012
|
MTR Tsim Sha Tsui Station Carnarvon Subway
and Entrances Modification Works
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4402012_content.html
|
|
|
|
|
EP-438/2012/K
|
Shatin to Central Link - Tai Wai to Hung HomSection
|
Monthly EM&A Report (Sep 2017)
|
http://www.epd.gov.hk/eia/english/register/index8/vep5062016_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|