Monthly
Update of Documents Uploaded
Documents Uploaded to the EIAO Website
|
|
(for the
period between 16 September 2012 to 15 October 2012)
|
|
|
|
Application
No. / Permit No.
|
Project
Title
|
Document
Name
|
Hyperlink
|
|
|
|
Application
for EIA Study Brief
|
|
|
|
Nil
|
|
|
|
Application
for Permission to Apply Directly for Environmental Permit
|
|
|
|
DIR-221/2012
|
MTR Wan Chai Station Lee
Tung Street Subway
|
Decision
of DEP
|
http://www.epd.gov.hk/eia/register/permission/conditions/dir2212012.htm
|
|
|
|
Application
for Approval of EIA Report
|
|
|
|
Nil
|
|
|
|
Application
for Environmental Permit
|
|
|
|
Nil
|
|
|
|
Application
for Variation of an Environmental Permit
|
|
|
|
VEP-374/2012
|
Central-Wanchai Bypass (CWB) including
its road tunnel and slip roads
|
Environmental Permit issued
(EP-364/2009/B)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3742012.htm
|
|
|
|
VEP-375/2012
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Environmental Permit issued
(EP-322/2008/F)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3752012.htm
|
|
|
|
VEP-376/2012
|
West Island Line
|
Environmental Permit issued
(EP-313/2008/F)
|
http://www.epd.gov.hk/eia/register/permit/latest/vep3762012.htm
|
|
|
|
Application
for Further Environmental Permit
|
|
|
|
Nil
|
|
|
|
Submission
as required by Environmental Permit Condition - Design / Environmental
Submissions
|
|
|
|
EP-366/2009/A
|
Road Works at West Kowloon
|
Location Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep3682012_content.html
|
|
|
|
EP-349/2009/B
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Contamination
Assessment Report for SK Stabling Sidings
|
http://www.epd.gov.hk/eia/english/register/index8/vep3342010_content.html
|
|
|
|
EP-349/2009/G
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Contamination Assessment Report for SK Stabling Sidings
|
http://www.epd.gov.hk/eia/english/register/index8/vep3602012_content.html
|
|
|
|
EP-349/2009/E
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Contamination Assessment Report for SK Stabling Sidings
|
http://www.epd.gov.hk/eia/english/register/index8/vep3522012_content.html
|
|
|
|
EP-313/2008/D
|
West Island Line
|
Water Management Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep3332011.html
|
|
|
|
EP-349/2009/E
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Groundwater Monitoring and Contingency Action Plan
|
http://www.epd.gov.hk/eia/english/register/index8/vep3522012_content.html
|
|
|
|
EP-349/2009/F
|
Hong Kong Section of Guangzhou
- Shenzhen - Hong Kong Express Rail Link
|
Contingency Plan for Groundwater Drawdown
|
http://www.epd.gov.hk/eia/english/register/index8/vep3582012_content.html
|
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and Associated Facilities
from To Kwa Wan to North Point for Former
Kai Tak
Airport Development
|
2nd Coral Impact Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
|
EP-401/2010
|
Installation of Submarine Gas Pipelines and Associated
Facilities from To Kwa Wan to North Point for Former Kai
Tak Airport
Development
|
3rd Coral Impact Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4012010_content.html
|
|
|
|
EP-437/2012
|
Shatin to Central Link - Mong Kok East to Hung Hom
Section
|
Alternative
Baseline Dust & Noise Monitoring Location Proposal
|
http://www.epd.gov.hk/eia/english/register/aep/ep4372012_content.html
|
|
|
|
EP-442/2012
|
EMSD Hong Kong Workshop
at Sheung On Street, Chai Wan
|
Final
Baseline Monitoring Report
|
http://www.epd.gov.hk/eia/english/register/aep/ep4422012_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II - Central - Wan Chai Bypass
at Hong Kong Convention and Exhibition
Centre
|
Silt
Curtain Deployment Plan and Report on Field Test for Silt Curtain (Rev.5)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
Submission
as required by Environmental Permit Condition - EM&A Reports
|
|
|
|
|
Island District
|
Central & Western District
|
|
|
|
|
|
North District
|
Wan Chai District
|
|
|
|
|
|
Sai Kung District
|
Eastern District
|
|
|
|
|
|
Sha Tin District
|
Southern District
|
|
|
|
|
|
Tai Po District
|
Kowloon City District
|
|
|
|
|
|
Tsuen Wan District
|
Kwun Tong District
|
|
|
|
|
|
Tuen Mun District
|
Sham Shui Po District
|
|
|
|
|
|
Yuen Long District
|
Wong Tai Sin District
|
|
|
|
|
|
Kwai Tsing District
|
Yau Tsim Mong District
|
|
|
|
|
- Island District
|
|
|
|
EP-01/059/2000/B
|
The Theme Park at Penny's Bay,
Lantau
|
Monthly Environmental Monitoring and
Audit Report for 81st Operating Month (12 May 2012-11 Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html
|
|
|
|
FEP-01/097/2001/C
|
Water Recreation Centre at Penny's Bay (part
& remaining part)
|
Monthly Environmental Monitoring and Audit
Report (No. 81)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html
|
|
|
|
EP-01/059/2000/B
|
The Theme Park at Penny's Bay,
Lantau
|
Monthly Environmental Monitoring
and Audit Report for 61st Operating Month (12 Sep 2010 to 11 Oct 2010)
|
http://www.epd.gov.hk/eia/english/register/index8/vep1982005_content.html
|
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 - Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Monthly EM&A Report (May
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
|
EP-282/2007
|
Outlying Islands
Sewerage Stage 1 Phase 1 Part 2 - Yung Shue Wan Sewerage, Sewage Treatment
Works and Outfall
|
Quarterly EM&A Report (Feb
2012 to Apr 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2822007_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
First Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-281/2007/A
|
Outlying
Islands Sewerage Stage 1 Phase 2 - Sok Kwu
Wan Sewage Collection, Treatment and Disposal Facilities
|
Monthly
EM&A Report (No. 22) (May 2012) (DC/2009/13)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2992009_content.html
|
|
|
|
EP-248/2006
|
Lamma
Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit
Project
|
EM&A
Programme at Operatioanl Phase
|
http://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html
|
|
|
|
EP-287/2007
|
Lamma
Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project
|
EM&A
Programme at Operatioanl Phase
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
EP-071/2000/C
|
1,800MW
Gas-Fired Power Station at Lamma Extension
|
EM&A
Programme at Operatioanl Phase
|
http://www.epd.gov.hk/eia/english/register/index8/vep1742005_content.html
|
|
|
|
EP-083/2000
|
Conversion
of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit
|
Monthly
Environmental Monitoring And Audit Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html
|
|
|
|
EP-423/2011/A
|
South-East
Asia Japan
Cable System (SJC) Hong Kong Segment
|
Second
Weekly Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
- North District
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Quarterly EM&A Report (Feb - Apr 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
EP-329/2009
|
Provision of Cremators at Wo Hop Shek Crematorium
|
Monthly EM&A Report(May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3292009_content.html
|
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new sections of
Primary Boundary Fence and Boundary
Patrol Road
|
Monthly EM&A Report
(May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
|
FEP-03/347/2009
|
Construction of a Secondary Boundary Fence at Sha Tau Kok
|
Monthly EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html
|
|
|
|
FEP-04/347/2009/A
|
Construction of a Secondary Boundary Fence at Sha Tau Kok
(Remaining Section)
|
Monthly EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo
Highway/Fanling Highway
between Island House Interchange and
Fanling
|
Monthly Environmental Monitoring and Audit Report
(Jun 2012) Stage 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
- Sai Kung District
|
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Quarterly EM&A Report (Mar to
May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
|
EP-134/2002/J
|
Fill Bank at Tseung Kwan O Area
137
|
Monthly EM&A Report (May
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3382011_content.html
|
|
|
|
EP-397/2010
|
Renewable Energy Supply on Town Island
(also known as Dawn
Island)
|
Monthly EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3972010_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
First Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
FEP-01/410/2010
|
Phase
III Redevelopment of The Hong Kong
Federation of Youth Groups Jockey Club Sai Kung Outdoor Training Camp
|
Monthly
EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1272011_content.html
|
|
|
|
EP-423/2011/A
|
South-East
Asia Japan
Cable System (SJC) Hong Kong Segment
|
Second
Weekly Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
- Sha Tin District
|
|
|
|
Nil
|
|
|
|
- Tai Po District
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (May
2012) (DC/2009/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection
and Stage 5 Phase 2B
|
Environmental and Audit Report
(May 2012) (DE/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-303/2008
|
Drainage Improvement in Sha Tin
and Tai Po
|
Monthly EM&A Report (May
2012) (DC/2010/02)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3032008_content.html
|
|
|
|
EP-265/2007
|
Tai Po
Sewage Treatment Works Stage 5 Phase 2A-Disinfection
and Stage 5 Phase 2B
|
Environmental and Audit Report
(May 2012) (DC/2009/09)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2652007_content.html
|
|
|
|
EP-324/2008/A
|
Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling
|
Monthly
Environmental Monitoring and Audit Report (Jun 2012) Stage 1
|
http://www.epd.gov.hk/eia/english/register/index8/vep3512012_content.html
|
|
|
|
-
Tsuen Wan District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2007/23, DE/2009/02, DC/2009/05, DC/2009/10, DC/2009/17 and
DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.29)(DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jan
2012 to Mar 2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.30)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan
and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report(May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
|
-
Tuen Mun District
|
|
|
|
EP-210/2005/A
|
Expansion and Extension of Fill
Bank at Tuen Mun Area 38
|
Monthly Environmental Monitoring
and Audit Report (CV/2009/02) (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2772008.html
|
|
|
|
EP-342/2009/C
|
Traffic Improvements to Tuen Mun Road
Town Centre Section
|
Monthly EM&A Report (May
2012) Final
|
http://www.epd.gov.hk/eia/english/register/index8/vep3542012_content.html
|
|
|
|
EP-331/2009
|
Proposed
Widening of Tsing Lun Road
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3312009_content.html
|
|
|
|
EP-321/2008
|
Upgrading
of Pillar Point Sewage Treatment Works
|
Quarterly
EM&A Report (Feb 2012 to Apr 2012) No.6
|
http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html
|
|
|
|
EP-321/2008
|
Upgrading
of Pillar Point Sewage Treatment Works
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3212008_content.html
|
|
|
|
FEP-01/334/2009/B
|
Sludge
Treatment Facilities
|
Monthly
EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3652012_content.html
|
|
|
|
- Yuen Long District
|
|
|
|
EP-327/2009/A
|
Expansion of Ha Tsuen Sewage Pumping Station
|
Monthly EM&A Report (No.28) (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3132011_content.html
|
|
|
|
EP-347/2009/A
|
Construction of a Secondary Boundary Fence and new sections of
Primary Boundary Fence and Boundary
Patrol Road
|
Monthly EM&A Report
(May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3142010_content.html
|
|
|
|
FEP-03/347/2009
|
Construction of a Secondary Boundary Fence at Sha Tau Kok
|
Monthly EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1042010_content.html
|
|
|
|
FEP-04/347/2009/A
|
Construction of a Secondary Boundary Fence at Sha Tau Kok
(Remaining Section)
|
Monthly EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1122010_content.html
|
|
|
|
- Kwai Tsing District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2007/23, DE/2009/02, DC/2009/05, DC/2009/10, DC/2009/17 and
DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.29)(DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jan
2012 to Mar 2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.30)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-275/2007
|
Drainage Improvement in Tsuen Wan
and Kwai Chung - Tsuen Wan Drainage Tunnel
|
Monthly EM&A Report(May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2752007_content.html
|
|
|
|
- Central & Western District
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.11)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-408/2011/A
|
Central Police Station Conservation
and Revitalisation Project
|
Second Quarterly EM&A Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3502011_content.html
|
|
|
|
EP-408/2011/B
|
Central Police Station
Conservation and Revitalisation Project
|
Monthly EM&A Report (No.7)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May 2012)(DC/2007/23,
DE/2009/02, DC/2009/05, DC/2009/10, DC/2009/17 and DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.29)(DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jan
2012 to Mar 2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.30)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-408/2011/B
|
Central Police Station
Conservation and Revitalisation Project
|
EM&A Manual Section 8.2
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and Central-Wan
Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and Central
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and Central
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-286/2007/B
|
Expansion
of Heliport Facilities at Macau Ferry
Terminal
|
Monthly
EM&A Report No.21
|
http://www.epd.gov.hk/eia/english/register/index8/vep2802008_content.html
|
|
|
|
EP-408/2011/B
|
Central
Police Station Conservation and Revitalisation Project
|
Monthly
EM&A Report (No.8)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3572012_content.html
|
|
|
|
- Wan Chai District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2007/23, DE/2009/02, DC/2009/05, DC/2009/10, DC/2009/17 and
DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.29)(DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jan
2012 to Mar 2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.30)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.11)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Mar 2012 to May
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and Central-Wan
Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and Central
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and Central
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
EP-416/2011
|
ShaTin
to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly
EM&A Report No.7
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
- Eastern District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2007/23, DE/2009/02, DC/2009/05, DC/2009/10, DC/2009/17 and DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme (HATS)
Stage 2A
|
Monthly EM&A
Report(No.29)(DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jan
2012 to Mar 2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.30)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
|
EP-416/2011
|
ShaTin to Central Link Protection Works at Causeway Bay Typhoon Shelter
|
Quarterly EM&A Report (Mar 2012 to May
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
|
EP-356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html
|
|
|
|
|
FEP-01/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep0982010_content.html
|
|
|
|
|
FEP-02/356/2009
|
Wan Chai Development Phase II and
Central-Wan Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1032010_content.html
|
|
|
|
|
FEP-03/356/2009
|
Wan Chai Development Phase II and Central-Wan
Chai Bypass
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1052010_content.html
|
|
|
|
|
FEP-04/356/2009
|
Wan Chai Development Phase II and Central
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html
|
|
|
|
|
FEP-05/356/2009
|
Wan Chai Development Phase II and Central
|
Monthly
EM&A Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index7/fep1232011_content.html
|
|
|
|
|
EP-416/2011
|
ShaTin
to Central Link Protection Works at Causeway Bay
Typhoon Shelter
|
Monthly
EM&A Report No.7
|
http://www.epd.gov.hk/eia/english/register/aep/ep4162011_content.html
|
|
|
|
|
- Southern District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2007/23, DE/2009/02, DC/2009/05, DC/2009/10, DC/2009/17 and
DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.29)(DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jan
2012 to Mar 2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.30)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-407/2010/A
|
South
Island Line (East)
|
Monthly EM&A Report (No.11)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3442011_content.html
|
|
|
|
EP-423/2011/A
|
South-East Asia Japan Cable System (SJC) Hong
Kong Segment
|
First Weekly Impact Monitoring
and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
EP-287/2007
|
Lamma
Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project
|
EM&A
Programme at Operatioanl Phase
|
http://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html
|
|
|
|
EP-249/2006/B
|
Repositioning
and Long Term Operation Plan of Ocean
Park
|
Monthly
Environmental Monitoring and Audit Report (May 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3262012_content.html
|
|
|
|
EP-423/2011/A
|
South-East
Asia Japan
Cable System (SJC) Hong Kong Segment
|
Second
Weekly Impact Monitoring and Audit Report
|
http://www.epd.gov.hk/eia/english/register/index8/vep3592012_content.html
|
|
|
|
- Kowloon City District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A
Report(May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-285/2005
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
Quarterly EM&A Report (Feb
2012 to Apr 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2852008_content.html
|
|
|
|
EP-328/2009
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly
EM&A Report (Mar 2012 to May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3282009_content.html
|
|
|
|
EP-328/2009/A
|
Dredging
Works for Proposed Cruise Terminal at Kai Tak
|
Monthly
EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
- Kwun Tong District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-285/2005
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
Quarterly EM&A Report (Feb
2012 to Apr 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2852008_content.html
|
|
|
|
EP-328/2009
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly
EM&A Report (Mar 2012 to May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3282009_content.html
|
|
|
|
EP-328/2009/A
|
Dredging
Works for Proposed Cruise Terminal at Kai Tak
|
Monthly
EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
- Sham Shui Po District
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2008/09)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A Report(May
2012)(DC/2007/23, DE/2009/02, DC/2009/05, DC/2009/10, DC/2009/17 and
DC/2009/18)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.29)(DC/2007/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment
Scheme (HATS) Stage 2A
|
Quarterly EM&A Report(Jan
2012 to Mar 2012) (DC/2009/24)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
EP-322/2008/E
|
Harbour Area Treatment Scheme
(HATS) Stage 2A
|
Monthly EM&A
Report(No.30)(DC/2007/23)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3302010_content.html
|
|
|
|
- Wong Tai Sin District
|
|
|
|
EP-337/2009
|
New Distributor Roads Serving the
Planned Kai Tak Development
|
Monthly EM&A Report(May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html
|
|
|
|
EP-344/2009
|
New Sewage Pumping Stations
Serving Kai Tak Development
|
Monthly EM&A Report(May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3442009.html
|
|
|
|
EP-285/2005
|
Decommissioning of the Former Kai Tak Airport other than the North Apron
|
Quarterly EM&A Report (Feb
2012 to Apr 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep2852008_content.html
|
|
|
|
EP-328/2009
|
Dredging Works for Proposed Cruise Terminal
at Kai Tak
|
Quarterly
EM&A Report (Mar 2012 to May 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3282009_content.html
|
|
|
|
EP-328/2009/A
|
Dredging
Works for Proposed Cruise Terminal at Kai Tak
|
Monthly
EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep2892009_content.html
|
|
|
|
- Yau Tsim Mong District
|
|
|
|
EP-366/2009
|
Road Works at West
Kowloon
|
Monthly EM&A Report (May
2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep3662009_content.html
|
|
|
|
EP-349/2009/G
|
Hong Kong Section of Guangzhou - Shenzhen - Hong Kong
Express Rail Link
|
Monthly EM&A Report (May
2012)
|
http://www.epd.gov.hk/eia/english/register/index8/vep3602012_content.html
|
|
|
|
EP-414/2011
|
Reprovision
of Bridges D1 and T in West Kowloon
|
Monthly
EM&A Report (Jun 2012)
|
http://www.epd.gov.hk/eia/english/register/aep/ep4142011_content.html
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|